“My Electricity” Program Effectiveness Supporting the Development of PV Installation in Poland

There are a lot of studies that show the legitimacy of subsidizing renewable energy; however, some mechanisms are defective, and there are problems with the appropriate allocation of funds. Therefore, this paper aims to look at the situation of allocating funds to photovoltaics (PV) micro-installati...

Full description

Saved in:
Bibliographic Details
Published inEnergies (Basel) Vol. 14; no. 1; p. 231
Main Authors Olczak, Piotr, Kryzia, Dominik, Matuszewska, Dominika, Kuta, Marta
Format Journal Article
LanguageEnglish
Published Basel MDPI AG 01.01.2021
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:There are a lot of studies that show the legitimacy of subsidizing renewable energy; however, some mechanisms are defective, and there are problems with the appropriate allocation of funds. Therefore, this paper aims to look at the situation of allocating funds to photovoltaics (PV) micro-installations in Poland through the “My Electricity” program. The article presents the results of analyses aimed at identifying inequalities between provinces in the use of funds available under the “My Electricity” program and verifying whether these inequalities are getting worse and whether the intensity of support should not be territorially conditioned in terms of maximization an electricity production. As part of two editions of the “My Electricity” program (until 1 August 2020), over 64,000 PV micro-installations were created with an average power of approximately 5.7 kWp. The total installed PV capacity was 367.1 MWp (1st edition: 159.3 MWp, 2nd edition: 207.8 MWp). Financial resources (as a whole), in the second edition of “My Electricity” program, were distributed better than in the first edition. In the first edition, as much as 7.60% of funds were allocated inefficiently; in the second edition, it was only 3.88%. Allocation surpluses occur in provinces where the average disposable income is low and where there are a small number of households. There is a potential to introduce a territorial project selection criteria. The analysis shows that the criteria should promote provinces with higher disposable income and a larger number of households.