APA (7th ed.) Citation

Pajoutan, M., Golmohammadi, A., & Seifbarghy, M. (2014). CMS scheduling problem considering material handling and routing flexibility. International journal of advanced manufacturing technology, 72(5-8), 881-893. https://doi.org/10.1007/s00170-014-5696-8

Chicago Style (17th ed.) Citation

Pajoutan, Mojdeh, Amirmohsen Golmohammadi, and Mehdi Seifbarghy. "CMS Scheduling Problem Considering Material Handling and Routing Flexibility." International Journal of Advanced Manufacturing Technology 72, no. 5-8 (2014): 881-893. https://doi.org/10.1007/s00170-014-5696-8.

MLA (9th ed.) Citation

Pajoutan, Mojdeh, et al. "CMS Scheduling Problem Considering Material Handling and Routing Flexibility." International Journal of Advanced Manufacturing Technology, vol. 72, no. 5-8, 2014, pp. 881-893, https://doi.org/10.1007/s00170-014-5696-8.

Warning: These citations may not always be 100% accurate.