Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents

This paper considers several integrated production, inventory, and batch delivery scheduling problems on a single machine with due date assignment and two competing agents, each of which seeks to optimize its own performance. All the jobs of the first agent have a common due date, which is a decisio...

Full description

Saved in:
Bibliographic Details
Published inNaval research logistics Vol. 65; no. 5; pp. 393 - 409
Main Authors Yin, Yunqiang, Yang, Yongjian, Wang, Dujuan, Cheng, T.C.E., Wu, Chin‐Chia
Format Journal Article
LanguageEnglish
Published Hoboken, USA John Wiley & Sons, Inc 01.08.2018
Wiley Subscription Services, Inc
Subjects
Online AccessGet full text

Cover

Loading…
Abstract This paper considers several integrated production, inventory, and batch delivery scheduling problems on a single machine with due date assignment and two competing agents, each of which seeks to optimize its own performance. All the jobs of the first agent have a common due date, which is a decision variable to be determined by the decision maker, whereas the due dates of the jobs of the second agent are exogenously given. The jobs of the same agent are processed sequentially in batches and the batch processing time is equal to the total processing time of the jobs in the batch, where the batch size can be either bounded or unbounded. A batch is available only when all the jobs in it are completed. An available batch is delivered to its agent immediately, and the cost per batch delivery is fixed and independent of the number of jobs in the batch. Finished jobs are kept in inventory, if necessary, incurring an additional holding cost. The first agent wishes to find a job sequence, a common due date, and a dispatch date for each of its jobs that jointly minimize the total cost comprising the earliness, weighted number of tardy jobs, job holding, due date assignment, and batch delivery costs, while the second agent seeks to minimize one of the following criteria plus the batch delivery cost: the maximum value of a regular scheduling criterion, total completion time, and weighted number of tardy jobs. The overall objective is to minimize the objective value of the first agent, subject to the objective value of the second agent not exceeding a given threshold. For each of the problems considered, we study its computational complexity and develop exact and/or approximation solution algorithms.
AbstractList This paper considers several integrated production, inventory, and batch delivery scheduling problems on a single machine with due date assignment and two competing agents, each of which seeks to optimize its own performance. All the jobs of the first agent have a common due date, which is a decision variable to be determined by the decision maker, whereas the due dates of the jobs of the second agent are exogenously given. The jobs of the same agent are processed sequentially in batches and the batch processing time is equal to the total processing time of the jobs in the batch, where the batch size can be either bounded or unbounded. A batch is available only when all the jobs in it are completed. An available batch is delivered to its agent immediately, and the cost per batch delivery is fixed and independent of the number of jobs in the batch. Finished jobs are kept in inventory, if necessary, incurring an additional holding cost. The first agent wishes to find a job sequence, a common due date, and a dispatch date for each of its jobs that jointly minimize the total cost comprising the earliness, weighted number of tardy jobs, job holding, due date assignment, and batch delivery costs, while the second agent seeks to minimize one of the following criteria plus the batch delivery cost: the maximum value of a regular scheduling criterion, total completion time, and weighted number of tardy jobs. The overall objective is to minimize the objective value of the first agent, subject to the objective value of the second agent not exceeding a given threshold. For each of the problems considered, we study its computational complexity and develop exact and/or approximation solution algorithms.
Author Cheng, T.C.E.
Yang, Yongjian
Wang, Dujuan
Wu, Chin‐Chia
Yin, Yunqiang
Author_xml – sequence: 1
  givenname: Yunqiang
  orcidid: 0000-0001-5761-6680
  surname: Yin
  fullname: Yin, Yunqiang
  organization: University of Electronic Science and Technology of China
– sequence: 2
  givenname: Yongjian
  surname: Yang
  fullname: Yang, Yongjian
  organization: Kunming University of Science and Technology
– sequence: 3
  givenname: Dujuan
  orcidid: 0000-0003-1617-7057
  surname: Wang
  fullname: Wang, Dujuan
  email: wangdujuan@dlut.edu.cn
  organization: Sichuan University
– sequence: 4
  givenname: T.C.E.
  surname: Cheng
  fullname: Cheng, T.C.E.
  organization: The Hong Kong Polytechnic University
– sequence: 5
  givenname: Chin‐Chia
  surname: Wu
  fullname: Wu, Chin‐Chia
  organization: Feng Chia University
BookMark eNp9kN1LwzAUxYNMcE4f_A8CPgnrlq-m7eMYfgyGvqj4VtIm7TK6dEvSjf73ZptPgj5duPd3zuWcazAwrVEA3GE0wQiRqRH7CcEpphdgiGOCIp7EaACGKM1YhHj2dQWunVsjhDhD8RDsFsar2gqvJNzaVnal160ZQ232yvjW9mMojISF8OUKStXovbI9dOVKya7RpoYH7cOhU1AGDyic07XZBOlJ5g8tLNvNVvkjKuqwdzfgshKNU7c_cwQ-nh7f5y_R8u15MZ8to5LGjEaiSkkc44rSBHPGZEFlkRLOi1RIxuMk7InkiAulsoxwFNKgjCdZVVEmMGF0BO7PviHWrlPO5-u2sya8zAlmWcYRxWmgHs5UaVvnrKryrdUbYfsco_zYaB4azU-NBnb6iy21F8e-vBW6-U9x0I3q_7bOX2efZ8U3RmSJ8w
CitedBy_id crossref_primary_10_1155_2019_1572614
crossref_primary_10_1142_S0217595920500141
crossref_primary_10_1007_s11590_020_01670_4
crossref_primary_10_1007_s10878_023_01025_6
crossref_primary_10_1007_s10951_019_00619_5
crossref_primary_10_1109_JSYST_2020_3014093
crossref_primary_10_1016_j_cor_2021_105329
crossref_primary_10_1080_0305215X_2021_1961761
crossref_primary_10_1016_j_jclepro_2020_123364
crossref_primary_10_1080_00207543_2021_1923854
crossref_primary_10_1109_ACCESS_2019_2911028
crossref_primary_10_1016_j_asoc_2023_110598
crossref_primary_10_1016_j_tre_2019_03_014
crossref_primary_10_1016_j_cie_2020_106569
crossref_primary_10_1007_s40747_020_00184_x
crossref_primary_10_1016_j_cie_2019_07_050
crossref_primary_10_1109_ACCESS_2019_2929582
crossref_primary_10_1080_00207543_2020_1748908
crossref_primary_10_1080_24725854_2023_2272261
crossref_primary_10_1051_ro_2021175
crossref_primary_10_1007_s10951_020_00656_5
crossref_primary_10_1007_s10951_020_00658_3
crossref_primary_10_1016_j_ejor_2021_07_055
crossref_primary_10_1007_s00500_024_10395_w
crossref_primary_10_1080_00207543_2019_1693659
crossref_primary_10_3934_jimo_2021005
crossref_primary_10_1109_ACCESS_2020_3014134
crossref_primary_10_1080_0305215X_2019_1608980
crossref_primary_10_1016_j_cie_2021_107754
crossref_primary_10_1016_j_omega_2023_102923
crossref_primary_10_1007_s12351_024_00844_7
crossref_primary_10_1080_0305215X_2019_1678609
crossref_primary_10_1002_nav_21936
crossref_primary_10_3390_math11234745
crossref_primary_10_1007_s10479_023_05313_6
crossref_primary_10_1016_j_cor_2021_105231
crossref_primary_10_3934_jimo_2021081
crossref_primary_10_1007_s40747_020_00195_8
crossref_primary_10_1007_s10878_020_00600_5
crossref_primary_10_1108_K_10_2020_0697
Cites_doi 10.1287/opre.1030.0092
10.1007/BF01580393
10.1007/BF02248589
10.1016/j.asoc.2016.06.005
10.1002/nav.21562
10.1016/j.omega.2015.09.010
10.1016/j.cie.2014.10.025
10.1287/opre.1090.0744
10.1016/j.omega.2012.06.002
10.1504/IJISE.2015.065949
10.1016/0377-2217(95)00133-6
10.1016/j.ejor.2011.06.037
10.1016/0377-2217(93)90239-J
10.1007/s10951-014-0410-0
10.1023/A:1022231419049
10.1016/j.cie.2015.12.003
10.1057/jors.1994.191
10.1287/opre.1080.0688
10.1016/j.ejor.2013.09.017
10.1016/j.ins.2014.02.142
10.1287/ijoc.12.1.57.11901
10.1007/s10951-009-0109-9
10.1016/j.cor.2014.08.012
10.1007/s10878-016-0049-1
10.1016/j.ejor.2010.01.005
10.1016/j.ijpe.2009.08.012
10.1002/nav.21700
10.1287/opre.51.4.566.16106
10.1016/j.amc.2011.04.005
10.1287/ijoc.2016.0726
10.1080/00207543.2015.1056317
ContentType Journal Article
Copyright 2018 Wiley Periodicals, Inc.
Copyright_xml – notice: 2018 Wiley Periodicals, Inc.
DBID AAYXX
CITATION
7SC
7TB
7TN
8FD
F1W
FR3
H96
JQ2
KR7
L.G
L7M
L~C
L~D
DOI 10.1002/nav.21813
DatabaseName CrossRef
Computer and Information Systems Abstracts
Mechanical & Transportation Engineering Abstracts
Oceanic Abstracts
Technology Research Database
ASFA: Aquatic Sciences and Fisheries Abstracts
Engineering Research Database
Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources
ProQuest Computer Science Collection
Civil Engineering Abstracts
Aquatic Science & Fisheries Abstracts (ASFA) Professional
Advanced Technologies Database with Aerospace
Computer and Information Systems Abstracts – Academic
Computer and Information Systems Abstracts Professional
DatabaseTitle CrossRef
Civil Engineering Abstracts
Aquatic Science & Fisheries Abstracts (ASFA) Professional
Technology Research Database
Computer and Information Systems Abstracts – Academic
Mechanical & Transportation Engineering Abstracts
ProQuest Computer Science Collection
Computer and Information Systems Abstracts
Computer and Information Systems Abstracts Professional
Aquatic Science & Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy & Non-Living Resources
Oceanic Abstracts
ASFA: Aquatic Sciences and Fisheries Abstracts
Engineering Research Database
Advanced Technologies Database with Aerospace
DatabaseTitleList Civil Engineering Abstracts

CrossRef
DeliveryMethod fulltext_linktorsrc
Discipline Military & Naval Science
EISSN 1520-6750
EndPage 409
ExternalDocumentID 10_1002_nav_21813
NAV21813
Genre article
GrantInformation_xml – fundername: National Natural Science Foundation of China
  funderid: 11561036, 71501024, 71520107002, and 71532007
– fundername: China Postdoctoral Science Foundation
  funderid: 2017M612099, and 2018T110631
GroupedDBID --Z
-~X
.3N
.GA
.Y3
05W
0R~
10A
123
186
1L6
1OB
1OC
1OL
1ZS
31~
33P
3SF
3WU
4.4
4ZD
50Y
50Z
51W
51X
52M
52N
52O
52P
52S
52T
52U
52W
52X
5VS
66C
6TJ
702
7PT
8-0
8-1
8-3
8-4
8-5
8UM
930
A03
AAESR
AAEVG
AAHHS
AAHQN
AAMNL
AANHP
AANLZ
AAONW
AASGY
AAXRX
AAYCA
AAZKR
ABCQN
ABCUV
ABEML
ABIJN
ABTAH
ACAHQ
ACBWZ
ACCFJ
ACCZN
ACGFS
ACIWK
ACNCT
ACPOU
ACRPL
ACSCC
ACXBN
ACXQS
ACYXJ
ADBBV
ADEOM
ADIZJ
ADKYN
ADMGS
ADNMO
ADOZA
ADXAS
ADZMN
AEEZP
AEIGN
AEIMD
AEMOZ
AENEX
AEQDE
AEUQT
AEUYR
AFBPY
AFFNX
AFFPM
AFGKR
AFPWT
AFWVQ
AFZJQ
AHBTC
AHQJS
AITYG
AIURR
AIWBW
AJBDE
AJXKR
AKVCP
ALAGY
ALMA_UNASSIGNED_HOLDINGS
ALUQN
ALVPJ
AMBMR
AMYDB
ATUGU
AUFTA
AZBYB
AZFZN
AZVAB
BAFTC
BDRZF
BFHJK
BHBCM
BMNLL
BNHUX
BROTX
BRXPI
BY8
CS3
D-E
D-F
DCZOG
DPXWK
DR2
DRFUL
DRSTM
EBA
EBR
EBS
EBU
EJD
F00
F01
F04
FEDTE
FSPIC
G-S
G.N
GNP
GODZA
H.T
H.X
HBH
HF~
HGLYW
HHY
HVGLF
HZ~
H~9
IX1
J0M
JPC
KQQ
LATKE
LAW
LC2
LC3
LEEKS
LH4
LITHE
LOXES
LP6
LP7
LUTES
LW6
LYRES
M6L
MEWTI
MK4
MRFUL
MRSTM
MSFUL
MSSTM
MXFUL
MXSTM
N04
N05
N9A
NF~
NNB
O66
O9-
P2P
P2W
P2X
P4D
PALCI
PQQKQ
Q.N
Q11
QB0
QRW
R.K
RIWAO
RJQFR
ROL
RWI
RX1
SAMSI
SUPJJ
TH9
TN5
UAO
UB1
V2E
W8V
W99
WBKPD
WH7
WIB
WIH
WIK
WOHZO
WQJ
WRC
WWM
WXSBR
WYISQ
XBAML
XG1
XPP
XV2
ZY4
ZZTAW
~IA
~WT
AAYXX
ADXHL
AEYWJ
AGHNM
AGQPQ
AGYGG
CITATION
7SC
7TB
7TN
8FD
AAMMB
AEFGJ
AGXDD
AIDQK
AIDYY
F1W
FR3
H96
JQ2
KR7
L.G
L7M
L~C
L~D
ID FETCH-LOGICAL-c3543-af82551f3371644db3db8266b8ad46573372d606aee9926040509679ff34a1243
IEDL.DBID DR2
ISSN 0894-069X
IngestDate Fri Jul 25 12:09:08 EDT 2025
Thu Apr 24 23:11:41 EDT 2025
Tue Jul 01 01:00:18 EDT 2025
Wed Jan 22 16:48:26 EST 2025
IsPeerReviewed true
IsScholarly true
Issue 5
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c3543-af82551f3371644db3db8266b8ad46573372d606aee9926040509679ff34a1243
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ORCID 0000-0003-1617-7057
0000-0001-5761-6680
PQID 2149960318
PQPubID 1016414
PageCount 17
ParticipantIDs proquest_journals_2149960318
crossref_primary_10_1002_nav_21813
crossref_citationtrail_10_1002_nav_21813
wiley_primary_10_1002_nav_21813_NAV21813
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate August 2018
PublicationDateYYYYMMDD 2018-08-01
PublicationDate_xml – month: 08
  year: 2018
  text: August 2018
PublicationDecade 2010
PublicationPlace Hoboken, USA
PublicationPlace_xml – name: Hoboken, USA
– name: New York
PublicationTitle Naval research logistics
PublicationYear 2018
Publisher John Wiley & Sons, Inc
Wiley Subscription Services, Inc
Publisher_xml – name: John Wiley & Sons, Inc
– name: Wiley Subscription Services, Inc
References 2011; 215
2015; 79
2010; 58
2011; 217
2015; 19
2015; 18
2010; 205
2015; 53
2010; 123
2013; 41
1994; 45
2016; 54
1996; 93
2017; 29
2016; 92
2014; 61
2003; 51
2014; 274
2014; 235
2009; 12
2004; 52
1976; 11
1990; 26
2000; 12
1993; 70
2003; 6
2017; 33
1993; 10
2003; 47
2016; 63
e_1_2_10_23_1
e_1_2_10_24_1
e_1_2_10_21_1
e_1_2_10_22_1
e_1_2_10_20_1
e_1_2_10_2_1
e_1_2_10_4_1
e_1_2_10_18_1
e_1_2_10_3_1
e_1_2_10_19_1
e_1_2_10_6_1
e_1_2_10_16_1
e_1_2_10_5_1
e_1_2_10_17_1
e_1_2_10_8_1
e_1_2_10_14_1
e_1_2_10_7_1
e_1_2_10_15_1
e_1_2_10_12_1
Cheng T. C. E. (e_1_2_10_9_1) 1993; 10
e_1_2_10_13_1
e_1_2_10_10_1
e_1_2_10_33_1
e_1_2_10_11_1
e_1_2_10_32_1
e_1_2_10_31_1
e_1_2_10_30_1
e_1_2_10_29_1
e_1_2_10_27_1
e_1_2_10_28_1
e_1_2_10_25_1
e_1_2_10_26_1
References_xml – volume: 18
  start-page: 423
  year: 2015
  end-page: 434
  article-title: Two‐agent scheduling with agent specific batches on an unbounded serial batching machine
  publication-title: Journal of Scheduling
– volume: 58
  start-page: 458
  issue: 2
  year: 2010
  end-page: 469
  article-title: Competitive two agents scheduling and its applications
  publication-title: Operations Research
– volume: 11
  start-page: 229
  year: 1976
  end-page: 251
  article-title: A dual algorithm for the one machine scheduling problem
  publication-title: Mathematical Programming
– volume: 10
  start-page: 145
  year: 1993
  end-page: 152
  article-title: Scheduling with delivery and earliness penalty
  publication-title: Asia‐Pacific Journal of Operational Research
– volume: 61
  start-page: 1
  year: 2014
  end-page: 16
  article-title: Single machine just‐in‐time scheduling problems with two competing agents
  publication-title: Naval Research Logistics
– volume: 92
  start-page: 16
  year: 2016
  end-page: 30
  article-title: Two‐agent single‐machine scheduling to minimize the batch delivery cost
  publication-title: Computers and Industrial Engineering
– volume: 63
  start-page: 416
  year: 2016
  end-page: 429
  article-title: CON/SLK due date assignment and scheduling on a single machine with two agents
  publication-title: Naval Research Logistics
– volume: 29
  start-page: 232
  issue: 2
  year: 2017
  end-page: 250
  article-title: Integrated production, inventory and delivery problems: Complexity and algorithms
  publication-title: INFORMS Journal on Computing
– volume: 52
  start-page: 229
  year: 2004
  end-page: 242
  article-title: Scheduling problems with two competing agents
  publication-title: Operations Research
– volume: 45
  start-page: 1211
  year: 1994
  end-page: 1215
  article-title: Batch delivery scheduling on a single machine
  publication-title: The Journal of the Operational Research Society
– volume: 215
  start-page: 524
  year: 2011
  end-page: 531
  article-title: Single machine batch scheduling with two competing agents to minimize total flowtime
  publication-title: European Journal of Operational Research
– volume: 41
  start-page: 216
  year: 2013
  end-page: 225
  article-title: Single‐machine batch delivery scheduling with an assignable common due window
  publication-title: Omega
– volume: 79
  start-page: 148
  year: 2015
  end-page: 155
  article-title: Two‐agent single‐machine scheduling with unrestricted due date assignment
  publication-title: Computers and Industrial Engineering
– volume: 274
  start-page: 310
  year: 2014
  end-page: 322
  article-title: Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval
  publication-title: Information Sciences
– volume: 12
  start-page: 57
  year: 2000
  end-page: 75
  article-title: When does a dynamic programming formulation guarantee the existence of a fully polynomial time approximation scheme (FPTAS)?
  publication-title: INFORMS Journal on Computing
– volume: 26
  start-page: 135
  year: 1990
  end-page: 147
  article-title: Batch sizing and job sequencing on a single machine
  publication-title: Annals of Operations Research
– volume: 33
  start-page: 1454
  year: 2017
  end-page: 1468
  article-title: A two‐agent single machine scheduling problem with due‐window assignment and a common flow‐allowance
  publication-title: Journal of Combinatorial Optimization
– volume: 217
  start-page: 8804
  year: 2011
  end-page: 8824
  article-title: Two‐agent scheduling with position‐based deteriorating jobs and learning effects
  publication-title: Applied Mathematics and Computation
– volume: 12
  start-page: 565
  year: 2009
  end-page: 574
  article-title: Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two‐level supply chains
  publication-title: Journal of Scheduling
– volume: 70
  start-page: 272
  year: 1993
  end-page: 288
  article-title: On scheduling to minimize earliness‐tardiness and batch delivery costs with a common due date
  publication-title: European Journal of Operational Research
– volume: 93
  start-page: 49
  year: 1996
  end-page: 60
  article-title: Scheduling and common due date assignment with earliness‐tardiness penalties and batch delivery costs
  publication-title: European Journal of Operational Research
– volume: 205
  start-page: 528
  year: 2010
  end-page: 539
  article-title: Scheduling two agents with controllable processing times
  publication-title: European Journal of Operational Research
– volume: 63
  start-page: 41
  year: 2016
  end-page: 47
  article-title: Just‐in‐time scheduling with two competing agents on unrelated parallel machines
  publication-title: Omega
– volume: 53
  start-page: 194
  year: 2015
  end-page: 205
  article-title: Single‐machine batch delivery scheduling with job release dates, due windows and earliness, tardiness, holding and delivery costs
  publication-title: Computers and Operations Research
– volume: 235
  start-page: 1
  year: 2014
  end-page: 16
  article-title: A common framework and taxonomy for multicriteria scheduling problem with interfering and competing jobs: Multi‐agent scheduling problems
  publication-title: European Journal of Operational Research
– volume: 6
  start-page: 7
  year: 2003
  end-page: 16
  article-title: A multiple‐criterion model for machine scheduling
  publication-title: Journal of Scheduling
– volume: 51
  start-page: 566
  year: 2003
  end-page: 584
  article-title: Supply chain scheduling: Batching and delivery
  publication-title: Operations Research
– volume: 47
  start-page: 343
  year: 2003
  end-page: 356
  article-title: Minimizing sum of the due date assignment costs, maximum tardiness and distribution costs in a supply chain scheduling problem
  publication-title: Applied Soft Computing
– volume: 58
  start-page: 130
  issue: 1
  year: 2010
  end-page: 148
  article-title: Integrated production and outbound distribution scheduling: Review and extensions
  publication-title: Operations Research
– volume: 123
  start-page: 235
  year: 2010
  end-page: 242
  article-title: Scheduling and due date assignment to minimize earliness, tardiness, holding, due date assignment and batch delivery costs
  publication-title: International Journal of Production Economics
– volume: 54
  start-page: 1152
  year: 2016
  end-page: 1169
  article-title: Due date assignment and scheduling on a single machine with two competing agents
  publication-title: International Journal of Production Research
– volume: 19
  start-page: 94
  issue: 1
  year: 2015
  end-page: 122
  article-title: Integrated scheduling of production and distribution operations: A review
  publication-title: International Journal of Industrial and Systems Engineering
– ident: e_1_2_10_2_1
  doi: 10.1287/opre.1030.0092
– ident: e_1_2_10_12_1
  doi: 10.1007/BF01580393
– ident: e_1_2_10_11_1
  doi: 10.1007/BF02248589
– ident: e_1_2_10_4_1
  doi: 10.1016/j.asoc.2016.06.005
– ident: e_1_2_10_13_1
  doi: 10.1002/nav.21562
– ident: e_1_2_10_28_1
  doi: 10.1016/j.omega.2015.09.010
– ident: e_1_2_10_30_1
  doi: 10.1016/j.cie.2014.10.025
– ident: e_1_2_10_17_1
  doi: 10.1287/opre.1090.0744
– ident: e_1_2_10_29_1
  doi: 10.1016/j.omega.2012.06.002
– ident: e_1_2_10_26_1
  doi: 10.1504/IJISE.2015.065949
– ident: e_1_2_10_6_1
  doi: 10.1016/0377-2217(95)00133-6
– ident: e_1_2_10_19_1
  doi: 10.1016/j.ejor.2011.06.037
– ident: e_1_2_10_15_1
  doi: 10.1016/0377-2217(93)90239-J
– ident: e_1_2_10_16_1
  doi: 10.1007/s10951-014-0410-0
– ident: e_1_2_10_5_1
  doi: 10.1023/A:1022231419049
– ident: e_1_2_10_32_1
  doi: 10.1016/j.cie.2015.12.003
– ident: e_1_2_10_8_1
  doi: 10.1057/jors.1994.191
– ident: e_1_2_10_7_1
  doi: 10.1287/opre.1080.0688
– ident: e_1_2_10_21_1
  doi: 10.1016/j.ejor.2013.09.017
– volume: 10
  start-page: 145
  year: 1993
  ident: e_1_2_10_9_1
  article-title: Scheduling with delivery and earliness penalty
  publication-title: Asia‐Pacific Journal of Operational Research
– ident: e_1_2_10_33_1
  doi: 10.1016/j.ins.2014.02.142
– ident: e_1_2_10_27_1
  doi: 10.1287/ijoc.12.1.57.11901
– ident: e_1_2_10_23_1
  doi: 10.1007/s10951-009-0109-9
– ident: e_1_2_10_3_1
  doi: 10.1016/j.cor.2014.08.012
– ident: e_1_2_10_20_1
  doi: 10.1007/s10878-016-0049-1
– ident: e_1_2_10_24_1
  doi: 10.1016/j.ejor.2010.01.005
– ident: e_1_2_10_22_1
  doi: 10.1016/j.ijpe.2009.08.012
– ident: e_1_2_10_31_1
  doi: 10.1002/nav.21700
– ident: e_1_2_10_14_1
  doi: 10.1287/opre.51.4.566.16106
– ident: e_1_2_10_10_1
  doi: 10.1016/j.amc.2011.04.005
– ident: e_1_2_10_18_1
  doi: 10.1287/ijoc.2016.0726
– ident: e_1_2_10_25_1
  doi: 10.1080/00207543.2015.1056317
SSID ssj0006405
Score 2.3828356
Snippet This paper considers several integrated production, inventory, and batch delivery scheduling problems on a single machine with due date assignment and two...
SourceID proquest
crossref
wiley
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 393
SubjectTerms Approximation
batch delivery
Batch processing
Completion time
Decision making
Delivery scheduling
due date assignment
Production scheduling
Reagents
scheduling
Sequential scheduling
two agents
Title Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
URI https://onlinelibrary.wiley.com/doi/abs/10.1002%2Fnav.21813
https://www.proquest.com/docview/2149960318
Volume 65
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnZ1JSwMxFMdD6cmLu7RaJYiIh06XmcyGpyKWKtiDWOlBGLKNFmVauyj10_teZqatoiDeBiaZJcnL-7_w8gshJxycvmvLhsVE6FtMBoi8dX1LN2NwH0w1NMelgZuu1-mx677bL5DzfC9MyodYLLihZZj5Gg2ci0l9BRrK32ron5D0iblaKIhul-goj6XpiwGib72wn1OFGnZ9UfOrL1oKzFWZavxMe4M85F-Yppc812ZTUZMf3-CN__yFTbKe6U_aSgfMFinoZJuUbgyrezynp7TLYezRzOR3yOtVzpNQdJTSYaEnq3RgktWH43mV8kRRATP6E1XwPWAacwohM7gw3OlOcaGXqpmmuLRAQaoPHk0Cgqk2fR9SaZQ7FuW4zWuyS3rty7uLjpUd02BJx2WOxWOIMt1m7DgYezElHCUgaPFEwBXzkLfo2wriJK51GEL4xAxyxg_j2GEc5IWzR4rJMNElQhnEV4EGRQpVmHJDYTMZxjCUYub7StplcpZ3WCQzhjkepfESpfRlO4ImjUyTlsnxougoBXf8VKiS93qU2e4E7jBE1sBkB68z3ff7A6Ju695c7P-96AFZA9UVpFmEFVKcjmf6EJTNVByZIfwJp4Pzjg
linkProvider Wiley-Blackwell
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV3dT8IwEL8gPuiL3wYUtTHG-MD42Dq2Jb4QIwEFHgwYXszSrZ0SzUA-NPjXe-02QKOJ8W3ZrlvX6_V-d7n-CnDG0Ombul_SqOdYGvVtSXlrWpooB-g-KC8JJlMDrXal3qU3PbOXgstkL0zEDzFPuEnLUOu1NHCZkC4usYayt4J0UMYKrMoTvVVAdbcgj6rQqIDRluS3FaeX8AqV9OK86VdvtICYy0BVeZraJjwkfYwKTJ4L04lX8D--0Tf-9ye2YCOGoKQazZltSIlwBzItRdc9mpFz0mY4_Uhs9bvw2kgoJTgZRgSxqMw86at69cFolics5MTDRf2JcOwQWseMYNSMXkxudicy10v4VBCZXSCI1vuPqgZBNZu8D4ivwLsUZXKn13gPurXrzlVdi09q0HzDpIbGAgw0zXJgGDL8otwzuIdxS8WzGUfVWHhf5xgqMSEcByMoqlhnLCcIDMoQYRj7kA4HocgAoRhi2QJBKTah3HQ8nfpOgLMpoJbFfT0LF4nGXD-mMZenaby4EQGz7uKQumpIs3A6Fx1G3B0_CeUStbux-Y7xCZWsNbje4eeU_n5_gduu3quLg7-LnsBavdNqus1G-_YQ1hGE2VFRYQ7Sk9FUHCHQmXjHaj5_At0_96k
linkToPdf http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1ZS8NAEB5qBfHFW1qtuoiID02PZHPhU7GWerSIWOmDEDbZjRalrT2U-uud3SRtFQXxLZDZHDszO98Ms98CHDEM-qYelDTqu7ZGA0dS3pq2Jsohhg_KS4LJ0kCjadVb9LJttlNwmuyFifghpgU36RlqvZYO3udhcY40lL0VZHwyFmCRWiVHmnT1dsYdZdGof9GR3LeW205ohUp6cTr0azCaIcx5nKoCTW0VHpJPjPpLngvjkV8IPr6xN_7zH9ZgJQagpBJZzDqkRHcDMg1F1j2YkGPSZGh8JPb5TXi9SAglOOlH9LCoyjzpqG713mCSJ6zLiY9L-hPh-D3oGxOCOTPGMLnVnchKL-FjQWRtgSBW7zyqDgQ1bPTeI4GC7lKUyX1ewy1o1c7vzupafE6DFhgmNTQWYppplkPDkMkX5b7BfcxaLN9hnFqScNHWOSZKTAjXxfyJKs4Z2w1DgzLEF8Y2pLu9rsgAoZhgOQIhKQ6h3HR9nQZuiLYUUtvmgZ6Fk0RhXhCTmMuzNF68iH5Z93BKPTWlWTicivYj5o6fhHKJ1r3YeYd4h0rOGlzt8HVKfb8_wGtW7tXFzt9FD2Dpplrzri-aV7uwjAjMiToKc5AeDcZiD1HOyN9X1vwJGlj2YQ
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Integrated+production%2C+inventory%2C+and+batch+delivery+scheduling+with+due+date+assignment+and+two+competing+agents&rft.jtitle=Naval+research+logistics&rft.au=Yin%2C+Yunqiang&rft.au=Yang%2C+Yongjian&rft.au=Wang%2C+Dujuan&rft.au=Cheng%2C+T.C.E.&rft.date=2018-08-01&rft.pub=John+Wiley+%26+Sons%2C+Inc&rft.issn=0894-069X&rft.eissn=1520-6750&rft.volume=65&rft.issue=5&rft.spage=393&rft.epage=409&rft_id=info:doi/10.1002%2Fnav.21813&rft.externalDBID=10.1002%252Fnav.21813&rft.externalDocID=NAV21813
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0894-069X&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0894-069X&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0894-069X&client=summon