Optimisation of the design of infrastructure components subject to progressive deterioration and extreme loads
The construction of new infrastructure requires solutions that maximise the benefit while meeting acceptable safety levels. The solution to this problem can be obtained through a structural cost-based optimisation. This paper integrates a life-cycle cost optimisation model developed by Rackwitz ( 20...
Saved in:
Published in | Structure and infrastructure engineering Vol. 8; no. 7; pp. 655 - 667 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Taylor & Francis
01.07.2012
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!