250 kWth high pressure pilot demonstration of the syngas chemical looping system for high purity H2 production with CO2 capture
•World’s first chemical looping pilot plant utilizing moving bed reactors.•Achieved near-full conversion of coal-derived syngas in the moving bed reducer.•Achieved 99% purity hydrogen production with in-situ carbon capture.•Validated operational results by ASPEN process simulation. Chemical looping...
Saved in:
Published in | Applied energy Vol. 230; no. C; pp. 1660 - 1672 |
---|---|
Main Authors | , , , , , , , , , , , , |
Format | Journal Article |
Language | English |
Published |
United States
Elsevier Ltd
15.11.2018
Elsevier |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!