An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
This paper addresses the resource-constrained project scheduling problem with uncertain activity durations. An adaptive robust optimization model is proposed to derive the resource allocation decisions that minimize the worst-case makespan, under general polyhedral uncertainty sets. The properties o...
Saved in:
Published in | Omega (Oxford) Vol. 71; pp. 66 - 84 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Elsevier Ltd
01.09.2017
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | This paper addresses the resource-constrained project scheduling problem with uncertain activity durations. An adaptive robust optimization model is proposed to derive the resource allocation decisions that minimize the worst-case makespan, under general polyhedral uncertainty sets. The properties of the model are analyzed, assuming that the activity durations are subject to interval uncertainty where the level of robustness is controlled by a protection factor related to the risk aversion of the decision maker. A general decomposition approach is proposed to solve the robust counterpart of the resource-constrained project scheduling problem, further tailored to address the uncertainty set with the protection factor. An extensive computational study is presented on benchmark instances adapted from the PSPLIB.
•We consider the resource-constrained project scheduling problem with uncertain activity durations.•A two-stage mathematical model is provided to formulate the robust version.•A decomposition approach is defined for general uncertainty sets.•Computational analysis is carried out on instances inspired by the scientific literature. |
---|---|
AbstractList | This paper addresses the resource-constrained project scheduling problem with uncertain activity durations. An adaptive robust optimization model is proposed to derive the resource allocation decisions that minimize the worst-case makespan, under general polyhedral uncertainty sets. The properties of the model are analyzed, assuming that the activity durations are subject to interval uncertainty where the level of robustness is controlled by a protection factor related to the risk aversion of the decision maker. A general decomposition approach is proposed to solve the robust counterpart of the resource-constrained project scheduling problem, further tailored to address the uncertainty set with the protection factor. An extensive computational study is presented on benchmark instances adapted from the PSPLIB.
•We consider the resource-constrained project scheduling problem with uncertain activity durations.•A two-stage mathematical model is provided to formulate the robust version.•A decomposition approach is defined for general uncertainty sets.•Computational analysis is carried out on instances inspired by the scientific literature. |
Author | Di Puglia Pugliese, L. Bruni, M.E. Guerriero, F. Beraldi, P. |
Author_xml | – sequence: 1 givenname: M.E. surname: Bruni fullname: Bruni, M.E. – sequence: 2 givenname: L. surname: Di Puglia Pugliese fullname: Di Puglia Pugliese, L. email: luigi.dipugliapugliese@unical.it – sequence: 3 givenname: P. surname: Beraldi fullname: Beraldi, P. – sequence: 4 givenname: F. surname: Guerriero fullname: Guerriero, F. |
BookMark | eNqFkLtOxDAQRS0EEsvjC2j8AwnjON4kBcVqxUtCooHacuwJ6yiJV7YDgo4_x7tQUUDlh-ZczT0n5HByExJywSBnwJaXfe5GfFF5kR45NDlAc0AWrK54JoqqPCQL4CAyKGt-TE5C6AGA1cAX5HM1UWX6OUTVDki9a9OVum20o_1Q0bqJjs7gQDvnadykCQxu9hoz7aYQvbITGrr1rkcdadAbNPNgp5fdVwoc6ZuNGzpPGn1Ms1TpaF9tfKdm9vv4cEaOOjUEPP85T8nzzfXT-i57eLy9X68eMs15GbOOKVUXLVQlL41pa9OYTkDJW9MVRSUQBYAAwbEF1i6BL3VlSoOCiUrrInU9Jc13rvYuBI-d1DbuV9i1GCQDuXMpe7l3KXcuJTQyuUws_8VuvR2Vf_-HuvqmMNV6tehl0BaTCmN9siWNs3_yX1-blbE |
CitedBy_id | crossref_primary_10_3390_computers11020023 crossref_primary_10_3390_app12063049 crossref_primary_10_1016_j_cie_2017_10_027 crossref_primary_10_1016_j_ijpe_2019_107522 crossref_primary_10_1109_TASE_2023_3246223 crossref_primary_10_1108_AA_09_2020_0132 crossref_primary_10_1016_j_omega_2022_102814 crossref_primary_10_1016_j_omega_2020_102339 crossref_primary_10_1016_j_autcon_2018_01_002 crossref_primary_10_1299_jamdsm_2024jamdsm0061 crossref_primary_10_1142_S0217595919500106 crossref_primary_10_1142_S0217595923500082 crossref_primary_10_1080_01605682_2020_1718558 crossref_primary_10_3846_jcem_2024_20809 crossref_primary_10_1016_j_asoc_2019_106048 crossref_primary_10_1287_opre_2022_2315 crossref_primary_10_1016_j_cor_2023_106453 crossref_primary_10_1007_s00500_021_06147_9 crossref_primary_10_1007_s10951_025_00835_2 crossref_primary_10_1080_01605682_2018_1441636 crossref_primary_10_1080_00207543_2019_1636319 crossref_primary_10_1016_j_eswa_2023_122002 crossref_primary_10_1016_j_cor_2023_106491 crossref_primary_10_1007_s10479_023_05403_5 crossref_primary_10_3390_app8040541 crossref_primary_10_1080_00207543_2021_1953179 crossref_primary_10_1016_j_cor_2020_105017 crossref_primary_10_1016_j_cor_2023_106445 crossref_primary_10_1016_j_cor_2024_106623 crossref_primary_10_1016_j_ejor_2019_09_052 crossref_primary_10_1016_j_cor_2021_105232 crossref_primary_10_1007_s42107_019_00177_3 crossref_primary_10_1016_j_cor_2024_106624 crossref_primary_10_1016_j_ejor_2024_05_037 crossref_primary_10_1109_ACCESS_2018_2828037 crossref_primary_10_1016_j_cor_2018_06_016 crossref_primary_10_1016_j_procs_2022_08_108 crossref_primary_10_1155_2018_5203127 crossref_primary_10_1007_s12205_021_0564_1 crossref_primary_10_1080_21680566_2022_2036651 crossref_primary_10_1155_2018_6932985 crossref_primary_10_1007_s00500_022_07148_y crossref_primary_10_1007_s10479_024_05854_4 crossref_primary_10_1016_j_cie_2021_107363 crossref_primary_10_1016_j_ejor_2018_08_031 crossref_primary_10_1080_24725854_2018_1468122 crossref_primary_10_1016_j_cie_2019_04_015 crossref_primary_10_1016_j_cie_2023_109741 crossref_primary_10_1016_j_orl_2024_107201 crossref_primary_10_1002_aic_17175 crossref_primary_10_1007_s12205_023_2164_8 crossref_primary_10_1016_j_cie_2024_110333 crossref_primary_10_1016_j_cor_2020_105104 crossref_primary_10_1109_TASE_2022_3195540 crossref_primary_10_1007_s12351_023_00750_4 crossref_primary_10_1016_j_autcon_2020_103267 crossref_primary_10_1007_s10479_023_05537_6 crossref_primary_10_1111_poms_13239 crossref_primary_10_1016_j_omega_2024_103206 crossref_primary_10_1016_j_orl_2022_08_003 crossref_primary_10_1080_01605682_2019_1610340 crossref_primary_10_1155_2022_8147581 crossref_primary_10_1108_ECAM_08_2020_0605 crossref_primary_10_1061__ASCE_CO_1943_7862_0001990 crossref_primary_10_1109_TASE_2022_3151611 crossref_primary_10_1155_2018_2697985 crossref_primary_10_1007_s10951_024_00828_7 crossref_primary_10_1016_j_asoc_2020_106988 crossref_primary_10_1016_j_autcon_2023_105030 crossref_primary_10_1080_00207543_2019_1695168 crossref_primary_10_1016_j_ipl_2024_106473 crossref_primary_10_1016_j_cie_2021_107316 crossref_primary_10_1016_j_cie_2021_107119 crossref_primary_10_1016_j_cie_2019_04_046 crossref_primary_10_1061__ASCE_CO_1943_7862_0001929 crossref_primary_10_3390_en13010215 crossref_primary_10_1016_j_cor_2021_105258 crossref_primary_10_1080_00207543_2018_1504245 crossref_primary_10_1007_s10586_017_1043_9 crossref_primary_10_1016_j_cie_2021_107160 crossref_primary_10_1109_TCC_2021_3132008 crossref_primary_10_1080_01605682_2025_2463556 |
Cites_doi | 10.1080/07408170490447348 10.1016/j.omega.2014.12.006 10.1137/100791841 10.1016/S0377-2217(02)00758-0 10.1016/j.dam.2011.09.015 10.1007/BF02283745 10.1287/opre.1080.0605 10.1007/s10696-012-9152-5 10.1007/s001860000095 10.1016/j.orl.2008.09.010 10.1016/S0377-2217(03)00130-9 10.1016/S0377-2217(96)00170-1 10.1016/S0377-2217(97)00344-5 10.1287/moor.1090.0440 10.1007/978-3-319-05915-0_7 10.1016/S0305-0483(00)00046-3 10.1108/02644401111179036 10.1007/s10951-015-0425-1 10.1016/j.orl.2013.05.003 10.1016/0305-0483(93)90043-K 10.1016/S0925-5273(96)00019-9 10.1287/mnsc.48.8.1008.163 10.1016/j.ijpe.2004.08.004 10.1002/j.1538-7305.1966.tb01709.x 10.1016/j.omega.2012.10.006 10.1287/opre.1030.0065 10.1007/s10951-008-0091-7 10.1007/s10951-015-0421-5 10.1137/080734510 10.1080/00207540500140914 10.1080/00207540310001638055 10.1007/s10951-007-0012-1 10.1007/s10951-015-0423-3 10.1016/j.ijpe.2007.02.003 10.1007/s10898-010-9645-2 10.1016/S0167-6377(99)00016-4 10.1007/s10479-010-0777-z 10.1016/j.ejor.2004.04.002 10.1007/s10951-009-0143-7 10.1016/S0305-0483(02)00033-6 10.1007/s10951-007-0008-x 10.1016/j.ejor.2005.09.018 10.1111/1475-3995.00427 10.1016/S0377-2217(97)00311-1 10.1007/BF01386316 10.1007/s10951-007-0021-0 10.1016/0167-6377(93)90002-X 10.1007/s10696-012-9147-2 10.1016/j.cor.2010.12.004 10.1002/net.3230130103 10.1016/j.ejor.2006.10.061 10.1007/PL00011380 10.1007/s10107-003-0454-y 10.1002/net.21615 10.2139/ssrn.1588642 |
ContentType | Journal Article |
Copyright | 2016 Elsevier Ltd |
Copyright_xml | – notice: 2016 Elsevier Ltd |
DBID | AAYXX CITATION |
DOI | 10.1016/j.omega.2016.09.009 |
DatabaseName | CrossRef |
DatabaseTitle | CrossRef |
DatabaseTitleList | |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Business |
EISSN | 1873-5274 |
EndPage | 84 |
ExternalDocumentID | 10_1016_j_omega_2016_09_009 S0305048316306594 |
GroupedDBID | --K --M -~X .~1 0R~ 13V 1B1 1OL 1RT 1~. 1~5 29N 4.4 457 4G. 5VS 7-5 71M 8P~ 96U 9JO AAAKF AAAKG AABNK AACTN AAEDT AAEDW AAIAV AAIKJ AAKOC AALRI AAOAW AAQFI AAQXK AARIN AAXUO ABJNI ABKBG ABMAC ABMVD ABUCO ABXDB ABYKQ ACBMB ACDAQ ACGFS ACHQT ACHRH ACNCT ACNTT ACRLP ADBBV ADEZE ADIYS ADMUD AEBSH AEKER AENEX AFACB AFAZI AFFNX AFKWA AFTJW AGHFR AGJBL AGQRV AGUBO AGUMN AGYEJ AHEHV AHHHB AHMBA AIEXJ AIKHN AITUG AJBFU AJOXV ALEQD ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ APLSM ASPBG AVWKF AXJTR AZFZN BAAKF BDEBP BKOJK BKOMP BLXMC BNSAS CS3 DU5 EBS EFJIC EFLBG EJD EO8 EO9 EP2 EP3 F5P FDB FEDTE FGOYB FIRID FNPLU FYGXN G-Q G8K GBLVA HAMUX HVGLF HZ~ IAO IEA IGG IHE IHR IOF IPO ITC J1W KOM LPU LXL LY1 M41 MO0 MS~ N95 O-L O9- OAUVE OHT OZT P-8 P-9 PC. PQQKQ Q38 R2- RIG ROL RPZ SDF SDG SDP SDS SES SEW SPCBC SSB SSD SSL SSZ T5K TAE TAF TN5 U5U VQA WUQ XI7 XPP XSW XYO YNT ZRQ ~G- AATTM AAXKI AAYWO AAYXX ABDPE ABWVN ACRPL ACVFH ADCNI ADMHG ADNMO ADVLN AEIPS AEUPX AFJKZ AFPUW AFXIZ AGCQF AGQPQ AGRNS AIGII AIIUN AKBMS AKRWK AKYEP ANKPU APXCP BNPGV CITATION IPC SSH |
ID | FETCH-LOGICAL-c334t-f1aa82b07434ddb8d9df5043bdf2275ee5005053eb01b6036c7d4de5157cc2803 |
IEDL.DBID | .~1 |
ISSN | 0305-0483 |
IngestDate | Thu Apr 24 22:49:24 EDT 2025 Tue Jul 01 02:57:28 EDT 2025 Fri Feb 23 02:28:28 EST 2024 |
IsPeerReviewed | true |
IsScholarly | true |
Keywords | Resource constraints Project scheduling Robust optimization Benders decomposition |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c334t-f1aa82b07434ddb8d9df5043bdf2275ee5005053eb01b6036c7d4de5157cc2803 |
PageCount | 19 |
ParticipantIDs | crossref_citationtrail_10_1016_j_omega_2016_09_009 crossref_primary_10_1016_j_omega_2016_09_009 elsevier_sciencedirect_doi_10_1016_j_omega_2016_09_009 |
ProviderPackageCode | CITATION AAYXX |
PublicationCentury | 2000 |
PublicationDate | 2017-09-01 |
PublicationDateYYYYMMDD | 2017-09-01 |
PublicationDate_xml | – month: 09 year: 2017 text: 2017-09-01 day: 01 |
PublicationDecade | 2010 |
PublicationTitle | Omega (Oxford) |
PublicationYear | 2017 |
Publisher | Elsevier Ltd |
Publisher_xml | – name: Elsevier Ltd |
References | Demeulemeester, Herroelen (bib25) 2011; 3 Herroelen, Leus (bib34) 2004; 42 Möhring, Stork (bib51) 2000; 52 Pich, Loch, DeMeyer (bib52) 2002; 48 Bruni, Beraldi, Guerriero, Pinto (bib20) 2011; 28 Beck, Ben-Tal (bib10) 2009; 37 Laporte, Louveaux (bib48) 1993; 13 Artigues, Leus, Nobibon (bib4) 2013; 25 Chen, Zhang (bib23) 2009; 57 Zeng, Zhao (bib65) 2013; 41 Goldratt (bib29) 1997 Lambrechts, Demeulemeester, Herroelen (bib45) 2008; 11 Van de Vonder, Demeulemeester, Herroelen, Leus (bib62) 2005; 97 Bartusch, Möhring, Radermacher (bib9) 1988; 16 Jeyakumar, Lisiam (bib39) 2010; 20 Tsai, Gemmil (bib61) 1998; 111 Schwindt, Trautmann (bib55) 2003; 10 Herroelen, Leus (bib33) 2004; 156 Lambrechts, Demeulemeester, Herroelen (bib46) 2008; 111 Van de Vonder, Demeulemeester, Herroelen (bib64) 2008; 189 Horst, Tuy (bib37) 1996 Soyster, Murphy (bib58) 2013; 41 Alves Pessoa, Di Puglia Pugliese, Guerriero, Poss (bib1) 2015; 66 Policella, Cesta, Oddi, Smith (bib53) 2009; 12 Bruni, Beraldi, Guerriero, Pinto (bib19) 2011; 38 Rabbani, FatemiGhomi, Jolai, Lahiji (bib54) 2007; 176 Creemers (bib22) 2015; 18 Ben-Tal, Goryashko, Guslitzer, Nemirovski (bib14) 2004; 99 Ballestín, Leus (bib8) 2009; 38 Ben-Tal, Nemirovski (bib13) 2000; 88 Bruni ME, Beraldi P, Guerriero F. The stochastic resource-constrained project scheduling problem. In: Handbook on project management and scheduling, vol. 2; 2015. p. 811–35. Rom, Tukel, Muscatello (bib57) 2002; 30 Bertsimas, Goyal (bib17) 2010; 35 Gorissen, Yanikogˇlu, den Hertog (bib31) 2015; 53 Ghouila-Houri (bib28) 1962; 254 Arsham (bib2) 1993; 21 Ben-Tal, Nemirovski (bib12) 1999; 25 Gabrel, Lacroix, Murat, Remli (bib27) 2014; 164 Artigues, Michelon, Reusser (bib3) 2003; 149 Koné, Artigues, Lopez, Mongeau (bib43) 2013; 25 Bertsimas, Brown, Caramanis (bib16) 2011; 53 Benders (bib11) 1962; 4 Ashtiani, Leus, Aryanezhad (bib5) 2011; 14 Hooker (bib36) 2004; vol. 3258 Kolisch, Padman (bib41) 2001; 29 Van De Vonder, Demeulemeester, Herroelen, Leus (bib63) 2006; 44 Deblaere, F, Demeulemeester E, Herroelen. W. Generating proactive execution policies for resource-constrained projects with uncertain activity durations. Research report KBI 1006. K.U.Leuven; 2010. p. 29. Radermacher FJ. Optimale Strategien für stochastische Scheduling-Probleme. Habilitationsschrift, RWTH Aachen. In: Schriften zur Informatik und angewandten Mathematik, vol. 98. RWTH Aachen, Aachen; 1981. Leus, Herroelen (bib49) 2004; 36 Lamas, Demeulemeester (bib44) 2015; 19 Stork F. Stochasticresource-constrained project scheduling [Ph.D. dissertation]. Technische Universität Berlin, Berlin, Germany; 2001. Balas (bib6) 1971 Lambrechts, Demeulemeester, Herroelen (bib47) 2011; 186 Herroelen, Leus (bib35) 2005; 165 Zhu, Bard, Yu (bib66) 2007; 10 Ben-Tal, El Ghaoui, Nemirovski (bib15) 2009 Ballestín (bib7) 2007; 10 Kerkhove, Vanhoucke (bib40) 2016 Graham (bib32) 1966; 45 Bertsimas, Sim (bib18) 2004; 52 Fu, Lau, Varakantham (bib26) 2015; 18 Minoux (bib50) 2011; 49 Igelmund, Radermacher (bib38) 1983; 13 Kolisch, Sprecher (bib42) 1996; 96 Tavares, Ferreira, Coelho (bib60) 1998; 107 Golenko-Ginzburg, Gonik (bib30) 1997; 48 Möhring (10.1016/j.omega.2016.09.009_bib51) 2000; 52 Ballestín (10.1016/j.omega.2016.09.009_bib8) 2009; 38 10.1016/j.omega.2016.09.009_bib59 Kolisch (10.1016/j.omega.2016.09.009_bib41) 2001; 29 Ghouila-Houri (10.1016/j.omega.2016.09.009_bib28) 1962; 254 Artigues (10.1016/j.omega.2016.09.009_bib3) 2003; 149 Benders (10.1016/j.omega.2016.09.009_bib11) 1962; 4 Ben-Tal (10.1016/j.omega.2016.09.009_bib12) 1999; 25 Ben-Tal (10.1016/j.omega.2016.09.009_bib15) 2009 Graham (10.1016/j.omega.2016.09.009_bib32) 1966; 45 Lambrechts (10.1016/j.omega.2016.09.009_bib47) 2011; 186 Bertsimas (10.1016/j.omega.2016.09.009_bib16) 2011; 53 Bruni (10.1016/j.omega.2016.09.009_bib19) 2011; 38 Hooker (10.1016/j.omega.2016.09.009_bib36) 2004; vol. 3258 Horst (10.1016/j.omega.2016.09.009_bib37) 1996 Laporte (10.1016/j.omega.2016.09.009_bib48) 1993; 13 Koné (10.1016/j.omega.2016.09.009_bib43) 2013; 25 Lambrechts (10.1016/j.omega.2016.09.009_bib46) 2008; 111 10.1016/j.omega.2016.09.009_bib56 Ben-Tal (10.1016/j.omega.2016.09.009_bib14) 2004; 99 Van De Vonder (10.1016/j.omega.2016.09.009_bib63) 2006; 44 Van de Vonder (10.1016/j.omega.2016.09.009_bib64) 2008; 189 Golenko-Ginzburg (10.1016/j.omega.2016.09.009_bib30) 1997; 48 Gorissen (10.1016/j.omega.2016.09.009_bib31) 2015; 53 Schwindt (10.1016/j.omega.2016.09.009_bib55) 2003; 10 Ashtiani (10.1016/j.omega.2016.09.009_bib5) 2011; 14 Ballestín (10.1016/j.omega.2016.09.009_bib7) 2007; 10 Bruni (10.1016/j.omega.2016.09.009_bib20) 2011; 28 Chen (10.1016/j.omega.2016.09.009_bib23) 2009; 57 Gabrel (10.1016/j.omega.2016.09.009_bib27) 2014; 164 Goldratt (10.1016/j.omega.2016.09.009_bib29) 1997 Leus (10.1016/j.omega.2016.09.009_bib49) 2004; 36 Tsai (10.1016/j.omega.2016.09.009_bib61) 1998; 111 Rom (10.1016/j.omega.2016.09.009_bib57) 2002; 30 Jeyakumar (10.1016/j.omega.2016.09.009_bib39) 2010; 20 Beck (10.1016/j.omega.2016.09.009_bib10) 2009; 37 Bertsimas (10.1016/j.omega.2016.09.009_bib17) 2010; 35 Herroelen (10.1016/j.omega.2016.09.009_bib34) 2004; 42 Artigues (10.1016/j.omega.2016.09.009_bib4) 2013; 25 Rabbani (10.1016/j.omega.2016.09.009_bib54) 2007; 176 Igelmund (10.1016/j.omega.2016.09.009_bib38) 1983; 13 Lamas (10.1016/j.omega.2016.09.009_bib44) 2015; 19 Tavares (10.1016/j.omega.2016.09.009_bib60) 1998; 107 Bertsimas (10.1016/j.omega.2016.09.009_bib18) 2004; 52 Soyster (10.1016/j.omega.2016.09.009_bib58) 2013; 41 Ben-Tal (10.1016/j.omega.2016.09.009_bib13) 2000; 88 Demeulemeester (10.1016/j.omega.2016.09.009_bib25) 2011; 3 Fu (10.1016/j.omega.2016.09.009_bib26) 2015; 18 Kerkhove (10.1016/j.omega.2016.09.009_bib40) 2016 Lambrechts (10.1016/j.omega.2016.09.009_bib45) 2008; 11 Zeng (10.1016/j.omega.2016.09.009_bib65) 2013; 41 10.1016/j.omega.2016.09.009_bib24 Alves Pessoa (10.1016/j.omega.2016.09.009_bib1) 2015; 66 Van de Vonder (10.1016/j.omega.2016.09.009_bib62) 2005; 97 Zhu (10.1016/j.omega.2016.09.009_bib66) 2007; 10 Balas (10.1016/j.omega.2016.09.009_bib6) 1971 Kolisch (10.1016/j.omega.2016.09.009_bib42) 1996; 96 Bartusch (10.1016/j.omega.2016.09.009_bib9) 1988; 16 Policella (10.1016/j.omega.2016.09.009_bib53) 2009; 12 Herroelen (10.1016/j.omega.2016.09.009_bib33) 2004; 156 Herroelen (10.1016/j.omega.2016.09.009_bib35) 2005; 165 Minoux (10.1016/j.omega.2016.09.009_bib50) 2011; 49 10.1016/j.omega.2016.09.009_bib21 Arsham (10.1016/j.omega.2016.09.009_bib2) 1993; 21 Creemers (10.1016/j.omega.2016.09.009_bib22) 2015; 18 Pich (10.1016/j.omega.2016.09.009_bib52) 2002; 48 |
References_xml | – volume: 189 start-page: 723 year: 2008 end-page: 733 ident: bib64 article-title: Proactive heuristic procedures for robust project scheduling: an experimental analysis publication-title: European Journal of Operational Research – volume: 38 start-page: 1305 year: 2011 end-page: 1318 ident: bib19 article-title: A heuristic approach for resource constrained project scheduling with uncertain activity durations publication-title: Computers and Operations Research – volume: 45 start-page: 1563 year: 1966 end-page: 1581 ident: bib32 article-title: Bounds on multiprocessing timing anomalies publication-title: Bell System Technical Journal – volume: 4 start-page: 238 year: 1962 end-page: 252 ident: bib11 article-title: Partitioning procedures for solving mixed-variables programming problems publication-title: Numerische Mathematik – volume: 13 start-page: 133 year: 1993 end-page: 142 ident: bib48 article-title: The integer L-shaped method for stochastic integer programs with complete recourse publication-title: Operations Research Letters – volume: 156 start-page: 550 year: 2004 end-page: 565 ident: bib33 article-title: The construction of stable project baseline schedules publication-title: European Journal of Operational Research – volume: 21 start-page: 111 year: 1993 end-page: 122 ident: bib2 article-title: Managing project activity-duration uncertainties publication-title: Omega – volume: 57 start-page: 1469 year: 2009 end-page: 1482 ident: bib23 article-title: Uncertain linear programs publication-title: Operations Research – volume: 28 start-page: 1064 year: 2011 end-page: 1078 ident: bib20 article-title: A scheduling methodology for dealing with uncertainty in construction projects publication-title: Engineering Computation – volume: 18 start-page: 263 year: 2015 end-page: 273 ident: bib22 article-title: Minimizing the expected makespan of a project with stochastic activity durations under resource constraints publication-title: Journal of Scheduling – volume: 25 start-page: 175 year: 2013 end-page: 205 ident: bib4 article-title: Robust optimization for resource-constrained project scheduling with uncertain activity durations publication-title: Flexible Services and Manufacturing Journal – volume: 107 start-page: 451 year: 1998 end-page: 469 ident: bib60 article-title: On the optimal management of project risk publication-title: European Journal of Operational Research – year: 1997 ident: bib29 article-title: Critical chain – volume: 99 start-page: 351 year: 2004 end-page: 376 ident: bib14 article-title: Adjustable robust solutions of uncertain linear programs publication-title: Mathematical Programming – volume: 20 start-page: 3384 year: 2010 end-page: 3407 ident: bib39 article-title: Strong duality in robust convex programming publication-title: SIAM Journal on Optimization – volume: 14 start-page: 157 year: 2011 end-page: 171 ident: bib5 article-title: New competitive results for the stochastic resource constrained project scheduling problem publication-title: Journal of Scheduling – volume: 254 start-page: 1192 year: 1962 ident: bib28 article-title: Caractérisation des matrices totalement unimodulaires publication-title: Comptes Rendus de l׳Académie des Sciences – volume: 53 start-page: 124 year: 2015 end-page: 137 ident: bib31 article-title: A practical guide to robust optimization publication-title: Omega – volume: 149 start-page: 249 year: 2003 end-page: 267 ident: bib3 article-title: Insertion techniques for static and dynamic resource-constrained project scheduling publication-title: European Journal of Operational Research – volume: 88 start-page: 411 year: 2000 end-page: 424 ident: bib13 article-title: Robust solutions of linear programming problems contaminated with uncertain data publication-title: Mathematical Programming – volume: 42 start-page: 1599 year: 2004 end-page: 1620 ident: bib34 article-title: Robust and reactive project scheduling publication-title: International Journal of Production Research – volume: 53 start-page: 464 year: 2011 end-page: 501 ident: bib16 article-title: Theory and applications of robust optimization publication-title: SIAM Review – volume: 48 start-page: 1008 year: 2002 end-page: 1023 ident: bib52 article-title: On uncertainty, ambiguity, and complexity in project management publication-title: Management Science – volume: 176 start-page: 794 year: 2007 end-page: 808 ident: bib54 article-title: A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept publication-title: European Journal of Operational Research – reference: Stork F. Stochasticresource-constrained project scheduling [Ph.D. dissertation]. Technische Universität Berlin, Berlin, Germany; 2001. – volume: 66 start-page: 99 year: 2015 end-page: 111 ident: bib1 article-title: Robust constrained shortest path problems under budgeted uncertainty publication-title: Networks – volume: 96 start-page: 205 year: 1996 end-page: 216 ident: bib42 article-title: PSPLIB – a project scheduling problem library publication-title: European Journal of Operational Research – volume: 13 start-page: 29 year: 1983 end-page: 48 ident: bib38 article-title: Algorithmic approaches to preselective strategies for stochastic scheduling problems publication-title: Networks – volume: 97 start-page: 227 year: 2005 end-page: 240 ident: bib62 article-title: The use of buffers in project management publication-title: International Journal of Production Economics – volume: 111 start-page: 493 year: 2008 end-page: 508 ident: bib46 article-title: A tabu search procedure for developing robust predictive project schedules publication-title: International Journal of Production Economics – volume: 37 start-page: 1 year: 2009 end-page: 6 ident: bib10 article-title: Duality in robust optimization publication-title: Operations Research Letters – start-page: 187 year: 1971 end-page: 200 ident: bib6 article-title: Project scheduling with resource constraints publication-title: Applications of mathematical programming techniques – volume: 10 start-page: 153 year: 2007 end-page: 166 ident: bib7 article-title: When it is worthwhile to work with the stochastic RCPSP? publication-title: Journal of Scheduling – volume: 12 start-page: 299 year: 2009 end-page: 314 ident: bib53 article-title: Solve-and-robustify publication-title: Journal of Scheduling – volume: 10 start-page: 547 year: 2003 end-page: 563 ident: bib55 article-title: Scheduling the production of rolling ingots publication-title: International Transactions in Operational Research – year: 2016 ident: bib40 article-title: Optimised scheduling for weather sensitive offshore construction projects publication-title: Omega, – volume: 36 start-page: 667 year: 2004 end-page: 682 ident: bib49 article-title: Stability and resource allocation in project planning publication-title: IIE Transactions – volume: 10 start-page: 167 year: 2007 end-page: 180 ident: bib66 article-title: A two-stage stochastic programming approach for project planning with uncertain activity durations publication-title: Journal of Scheduling – volume: 52 start-page: 35 year: 2004 end-page: 53 ident: bib18 article-title: The price of robustness publication-title: Operations Research – volume: 52 start-page: 501 year: 2000 end-page: 515 ident: bib51 article-title: Linear preselective strategies for stochastic project scheduling publication-title: Mathematical Methods of Operations Research – reference: Radermacher FJ. Optimale Strategien für stochastische Scheduling-Probleme. Habilitationsschrift, RWTH Aachen. In: Schriften zur Informatik und angewandten Mathematik, vol. 98. RWTH Aachen, Aachen; 1981. – reference: Bruni ME, Beraldi P, Guerriero F. The stochastic resource-constrained project scheduling problem. In: Handbook on project management and scheduling, vol. 2; 2015. p. 811–35. – volume: 35 start-page: 284 year: 2010 end-page: 305 ident: bib17 article-title: On the power of robust solutions in two-stage stochastic and adaptive optimization problems publication-title: Mathematics of Operations Research – volume: 11 start-page: 121 year: 2008 end-page: 136 ident: bib45 article-title: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities publication-title: Journal of Scheduling – year: 2009 ident: bib15 article-title: Robust optimization – volume: 186 start-page: 443 year: 2011 end-page: 464 ident: bib47 article-title: Time slack-based techniques for robust project scheduling subject to resource uncertainty publication-title: Annals of Operations Research – volume: 38 start-page: 1 year: 2009 end-page: 37 ident: bib8 article-title: Resource-constrained project scheduling for timely project completion with stochastic activity durations decisions in resource-constrained projects publication-title: Decision Sciences – year: 1996 ident: bib37 article-title: Special problems of concave minimization. Global optimization: deterministic approaches – volume: 25 start-page: 25 year: 2013 end-page: 47 ident: bib43 article-title: Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources publication-title: Flexible Services and Manufacturing Journal – volume: 164 start-page: 100 year: 2014 end-page: 111 ident: bib27 article-title: Robust location transportation problems under uncertain demands publication-title: Discrete Applied Mathematics – volume: 165 start-page: 289 year: 2005 end-page: 306 ident: bib35 article-title: Project scheduling under uncertainty – survey and research potentials publication-title: European Journal of Operational Research – reference: Deblaere, F, Demeulemeester E, Herroelen. W. Generating proactive execution policies for resource-constrained projects with uncertain activity durations. Research report KBI 1006. K.U.Leuven; 2010. p. 29. – volume: 18 start-page: 607 year: 2015 end-page: 622 ident: bib26 article-title: Robust execution strategies for project scheduling with unreliable resources and stochastic durations publication-title: Journal of Scheduling – volume: 19 start-page: 409 year: 2015 end-page: 428 ident: bib44 article-title: A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations publication-title: Journal of Scheduling – volume: 48 start-page: 29 year: 1997 end-page: 37 ident: bib30 article-title: Stochastic network project scheduling with non-consumable limited resources publication-title: International Journal of Production Economics – volume: 41 start-page: 457 year: 2013 end-page: 461 ident: bib65 article-title: Solving two-stage robust optimization problems using a column-and-constraint generation method publication-title: Operations Research Letters – volume: 25 start-page: 1 year: 1999 end-page: 14 ident: bib12 article-title: Robust solutions of uncertain linear programs publication-title: Operations Research Letters – volume: 49 start-page: 521 year: 2011 end-page: 537 ident: bib50 article-title: On 2-stage robust LP with RHS uncertainty: complexity results and applications publication-title: Journal of Global Optimization – volume: 3 start-page: 201 year: 2011 end-page: 376 ident: bib25 article-title: Robust project scheduling, foundations and trends in technology publication-title: Information and Operations Management – volume: 30 start-page: 275 year: 2002 end-page: 286 ident: bib57 article-title: MRP in a job shop environment using a resource constrained project scheduling model publication-title: Omega – volume: 41 start-page: 984 year: 2013 end-page: 997 ident: bib58 article-title: A unifying framework for duality and modeling in robust linear programs publication-title: Omega – volume: 44 start-page: 215 year: 2006 end-page: 236 ident: bib63 article-title: The trade-off between stability and makespan in resource-constrained project scheduling publication-title: International Journal of Production Research – volume: vol. 3258 start-page: 305 year: 2004 end-page: 316 ident: bib36 article-title: A hybrid method for planning and scheduling publication-title: Principles and practice of constraint programming – Lecture notes in computer science – volume: 16 start-page: 201 year: 1988 end-page: 240 ident: bib9 article-title: Scheduling project networks with resource constraints and time windows publication-title: Annals of Operations Research – volume: 29 start-page: 249 year: 2001 end-page: 272 ident: bib41 article-title: An integrated survey of deterministic project scheduling publication-title: Omega – volume: 111 start-page: 129 year: 1998 end-page: 141 ident: bib61 article-title: Using tabu search to schedule activities of stochastic resource-constrained projects publication-title: European Journal of Operational Research – volume: 36 start-page: 667 year: 2004 ident: 10.1016/j.omega.2016.09.009_bib49 article-title: Stability and resource allocation in project planning publication-title: IIE Transactions doi: 10.1080/07408170490447348 – volume: 53 start-page: 124 year: 2015 ident: 10.1016/j.omega.2016.09.009_bib31 article-title: A practical guide to robust optimization publication-title: Omega doi: 10.1016/j.omega.2014.12.006 – volume: 20 start-page: 3384 issue: 6 year: 2010 ident: 10.1016/j.omega.2016.09.009_bib39 article-title: Strong duality in robust convex programming publication-title: SIAM Journal on Optimization doi: 10.1137/100791841 – ident: 10.1016/j.omega.2016.09.009_bib56 – volume: 254 start-page: 1192 year: 1962 ident: 10.1016/j.omega.2016.09.009_bib28 article-title: Caractérisation des matrices totalement unimodulaires publication-title: Comptes Rendus de l׳Académie des Sciences – volume: 149 start-page: 249 issue: 2 year: 2003 ident: 10.1016/j.omega.2016.09.009_bib3 article-title: Insertion techniques for static and dynamic resource-constrained project scheduling publication-title: European Journal of Operational Research doi: 10.1016/S0377-2217(02)00758-0 – volume: 164 start-page: 100 issue: 1 year: 2014 ident: 10.1016/j.omega.2016.09.009_bib27 article-title: Robust location transportation problems under uncertain demands publication-title: Discrete Applied Mathematics doi: 10.1016/j.dam.2011.09.015 – volume: 16 start-page: 201 year: 1988 ident: 10.1016/j.omega.2016.09.009_bib9 article-title: Scheduling project networks with resource constraints and time windows publication-title: Annals of Operations Research doi: 10.1007/BF02283745 – volume: 57 start-page: 1469 issue: 6 year: 2009 ident: 10.1016/j.omega.2016.09.009_bib23 article-title: Uncertain linear programs publication-title: Operations Research doi: 10.1287/opre.1080.0605 – volume: 25 start-page: 25 issue: 1 year: 2013 ident: 10.1016/j.omega.2016.09.009_bib43 article-title: Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources publication-title: Flexible Services and Manufacturing Journal doi: 10.1007/s10696-012-9152-5 – volume: 52 start-page: 501 issue: 3 year: 2000 ident: 10.1016/j.omega.2016.09.009_bib51 article-title: Linear preselective strategies for stochastic project scheduling publication-title: Mathematical Methods of Operations Research doi: 10.1007/s001860000095 – volume: 37 start-page: 1 issue: 1 year: 2009 ident: 10.1016/j.omega.2016.09.009_bib10 article-title: Duality in robust optimization publication-title: Operations Research Letters doi: 10.1016/j.orl.2008.09.010 – volume: 156 start-page: 550 year: 2004 ident: 10.1016/j.omega.2016.09.009_bib33 article-title: The construction of stable project baseline schedules publication-title: European Journal of Operational Research doi: 10.1016/S0377-2217(03)00130-9 – volume: 96 start-page: 205 issue: 1 year: 1996 ident: 10.1016/j.omega.2016.09.009_bib42 article-title: PSPLIB – a project scheduling problem library publication-title: European Journal of Operational Research doi: 10.1016/S0377-2217(96)00170-1 – volume: 107 start-page: 451 year: 1998 ident: 10.1016/j.omega.2016.09.009_bib60 article-title: On the optimal management of project risk publication-title: European Journal of Operational Research doi: 10.1016/S0377-2217(97)00344-5 – volume: 35 start-page: 284 year: 2010 ident: 10.1016/j.omega.2016.09.009_bib17 article-title: On the power of robust solutions in two-stage stochastic and adaptive optimization problems publication-title: Mathematics of Operations Research doi: 10.1287/moor.1090.0440 – ident: 10.1016/j.omega.2016.09.009_bib21 doi: 10.1007/978-3-319-05915-0_7 – volume: 29 start-page: 249 issue: 3 year: 2001 ident: 10.1016/j.omega.2016.09.009_bib41 article-title: An integrated survey of deterministic project scheduling publication-title: Omega doi: 10.1016/S0305-0483(00)00046-3 – year: 2009 ident: 10.1016/j.omega.2016.09.009_bib15 – volume: 28 start-page: 1064 issue: 8 year: 2011 ident: 10.1016/j.omega.2016.09.009_bib20 article-title: A scheduling methodology for dealing with uncertainty in construction projects publication-title: Engineering Computation doi: 10.1108/02644401111179036 – volume: 18 start-page: 607 year: 2015 ident: 10.1016/j.omega.2016.09.009_bib26 article-title: Robust execution strategies for project scheduling with unreliable resources and stochastic durations publication-title: Journal of Scheduling doi: 10.1007/s10951-015-0425-1 – volume: 38 start-page: 1 year: 2009 ident: 10.1016/j.omega.2016.09.009_bib8 article-title: Resource-constrained project scheduling for timely project completion with stochastic activity durations decisions in resource-constrained projects publication-title: Decision Sciences – volume: 41 start-page: 457 issue: 5 year: 2013 ident: 10.1016/j.omega.2016.09.009_bib65 article-title: Solving two-stage robust optimization problems using a column-and-constraint generation method publication-title: Operations Research Letters doi: 10.1016/j.orl.2013.05.003 – volume: 21 start-page: 111 issue: 1 year: 1993 ident: 10.1016/j.omega.2016.09.009_bib2 article-title: Managing project activity-duration uncertainties publication-title: Omega doi: 10.1016/0305-0483(93)90043-K – volume: 48 start-page: 29 year: 1997 ident: 10.1016/j.omega.2016.09.009_bib30 article-title: Stochastic network project scheduling with non-consumable limited resources publication-title: International Journal of Production Economics doi: 10.1016/S0925-5273(96)00019-9 – volume: 48 start-page: 1008 issue: 8 year: 2002 ident: 10.1016/j.omega.2016.09.009_bib52 article-title: On uncertainty, ambiguity, and complexity in project management publication-title: Management Science doi: 10.1287/mnsc.48.8.1008.163 – volume: 97 start-page: 227 year: 2005 ident: 10.1016/j.omega.2016.09.009_bib62 article-title: The use of buffers in project management publication-title: International Journal of Production Economics doi: 10.1016/j.ijpe.2004.08.004 – volume: 45 start-page: 1563 year: 1966 ident: 10.1016/j.omega.2016.09.009_bib32 article-title: Bounds on multiprocessing timing anomalies publication-title: Bell System Technical Journal doi: 10.1002/j.1538-7305.1966.tb01709.x – volume: 41 start-page: 984 year: 2013 ident: 10.1016/j.omega.2016.09.009_bib58 article-title: A unifying framework for duality and modeling in robust linear programs publication-title: Omega doi: 10.1016/j.omega.2012.10.006 – year: 2016 ident: 10.1016/j.omega.2016.09.009_bib40 article-title: Optimised scheduling for weather sensitive offshore construction projects publication-title: Omega, – volume: 52 start-page: 35 issue: 1 year: 2004 ident: 10.1016/j.omega.2016.09.009_bib18 article-title: The price of robustness publication-title: Operations Research doi: 10.1287/opre.1030.0065 – volume: 12 start-page: 299 year: 2009 ident: 10.1016/j.omega.2016.09.009_bib53 article-title: Solve-and-robustify publication-title: Journal of Scheduling doi: 10.1007/s10951-008-0091-7 – volume: 18 start-page: 263 issue: 3 year: 2015 ident: 10.1016/j.omega.2016.09.009_bib22 article-title: Minimizing the expected makespan of a project with stochastic activity durations under resource constraints publication-title: Journal of Scheduling doi: 10.1007/s10951-015-0421-5 – volume: 53 start-page: 464 year: 2011 ident: 10.1016/j.omega.2016.09.009_bib16 article-title: Theory and applications of robust optimization publication-title: SIAM Review doi: 10.1137/080734510 – volume: 44 start-page: 215 issue: 2 year: 2006 ident: 10.1016/j.omega.2016.09.009_bib63 article-title: The trade-off between stability and makespan in resource-constrained project scheduling publication-title: International Journal of Production Research doi: 10.1080/00207540500140914 – year: 1996 ident: 10.1016/j.omega.2016.09.009_bib37 – volume: 42 start-page: 1599 issue: 8 year: 2004 ident: 10.1016/j.omega.2016.09.009_bib34 article-title: Robust and reactive project scheduling publication-title: International Journal of Production Research doi: 10.1080/00207540310001638055 – volume: 3 start-page: 201 issue: 3–4 year: 2011 ident: 10.1016/j.omega.2016.09.009_bib25 article-title: Robust project scheduling, foundations and trends in technology publication-title: Information and Operations Management – volume: 10 start-page: 153 year: 2007 ident: 10.1016/j.omega.2016.09.009_bib7 article-title: When it is worthwhile to work with the stochastic RCPSP? publication-title: Journal of Scheduling doi: 10.1007/s10951-007-0012-1 – volume: 19 start-page: 409 issue: 4 year: 2015 ident: 10.1016/j.omega.2016.09.009_bib44 article-title: A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations publication-title: Journal of Scheduling doi: 10.1007/s10951-015-0423-3 – volume: 111 start-page: 493 issue: 2 year: 2008 ident: 10.1016/j.omega.2016.09.009_bib46 article-title: A tabu search procedure for developing robust predictive project schedules publication-title: International Journal of Production Economics doi: 10.1016/j.ijpe.2007.02.003 – volume: 49 start-page: 521 year: 2011 ident: 10.1016/j.omega.2016.09.009_bib50 article-title: On 2-stage robust LP with RHS uncertainty: complexity results and applications publication-title: Journal of Global Optimization doi: 10.1007/s10898-010-9645-2 – volume: 25 start-page: 1 issue: 1 year: 1999 ident: 10.1016/j.omega.2016.09.009_bib12 article-title: Robust solutions of uncertain linear programs publication-title: Operations Research Letters doi: 10.1016/S0167-6377(99)00016-4 – volume: 186 start-page: 443 issue: 1 year: 2011 ident: 10.1016/j.omega.2016.09.009_bib47 article-title: Time slack-based techniques for robust project scheduling subject to resource uncertainty publication-title: Annals of Operations Research doi: 10.1007/s10479-010-0777-z – volume: 165 start-page: 289 issue: 2 year: 2005 ident: 10.1016/j.omega.2016.09.009_bib35 article-title: Project scheduling under uncertainty – survey and research potentials publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2004.04.002 – volume: 14 start-page: 157 year: 2011 ident: 10.1016/j.omega.2016.09.009_bib5 article-title: New competitive results for the stochastic resource constrained project scheduling problem publication-title: Journal of Scheduling doi: 10.1007/s10951-009-0143-7 – ident: 10.1016/j.omega.2016.09.009_bib59 – volume: 30 start-page: 275 year: 2002 ident: 10.1016/j.omega.2016.09.009_bib57 article-title: MRP in a job shop environment using a resource constrained project scheduling model publication-title: Omega doi: 10.1016/S0305-0483(02)00033-6 – volume: 10 start-page: 167 year: 2007 ident: 10.1016/j.omega.2016.09.009_bib66 article-title: A two-stage stochastic programming approach for project planning with uncertain activity durations publication-title: Journal of Scheduling doi: 10.1007/s10951-007-0008-x – volume: 176 start-page: 794 year: 2007 ident: 10.1016/j.omega.2016.09.009_bib54 article-title: A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2005.09.018 – volume: 10 start-page: 547 year: 2003 ident: 10.1016/j.omega.2016.09.009_bib55 article-title: Scheduling the production of rolling ingots publication-title: International Transactions in Operational Research doi: 10.1111/1475-3995.00427 – volume: 111 start-page: 129 year: 1998 ident: 10.1016/j.omega.2016.09.009_bib61 article-title: Using tabu search to schedule activities of stochastic resource-constrained projects publication-title: European Journal of Operational Research doi: 10.1016/S0377-2217(97)00311-1 – volume: 4 start-page: 238 year: 1962 ident: 10.1016/j.omega.2016.09.009_bib11 article-title: Partitioning procedures for solving mixed-variables programming problems publication-title: Numerische Mathematik doi: 10.1007/BF01386316 – volume: 11 start-page: 121 year: 2008 ident: 10.1016/j.omega.2016.09.009_bib45 article-title: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities publication-title: Journal of Scheduling doi: 10.1007/s10951-007-0021-0 – volume: 13 start-page: 133 issue: 3 year: 1993 ident: 10.1016/j.omega.2016.09.009_bib48 article-title: The integer L-shaped method for stochastic integer programs with complete recourse publication-title: Operations Research Letters doi: 10.1016/0167-6377(93)90002-X – volume: 25 start-page: 175 issue: 1–2 year: 2013 ident: 10.1016/j.omega.2016.09.009_bib4 article-title: Robust optimization for resource-constrained project scheduling with uncertain activity durations publication-title: Flexible Services and Manufacturing Journal doi: 10.1007/s10696-012-9147-2 – volume: 38 start-page: 1305 year: 2011 ident: 10.1016/j.omega.2016.09.009_bib19 article-title: A heuristic approach for resource constrained project scheduling with uncertain activity durations publication-title: Computers and Operations Research doi: 10.1016/j.cor.2010.12.004 – volume: vol. 3258 start-page: 305 year: 2004 ident: 10.1016/j.omega.2016.09.009_bib36 article-title: A hybrid method for planning and scheduling publication-title: Principles and practice of constraint programming – Lecture notes in computer science – volume: 13 start-page: 29 year: 1983 ident: 10.1016/j.omega.2016.09.009_bib38 article-title: Algorithmic approaches to preselective strategies for stochastic scheduling problems publication-title: Networks doi: 10.1002/net.3230130103 – volume: 189 start-page: 723 year: 2008 ident: 10.1016/j.omega.2016.09.009_bib64 article-title: Proactive heuristic procedures for robust project scheduling: an experimental analysis publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2006.10.061 – start-page: 187 year: 1971 ident: 10.1016/j.omega.2016.09.009_bib6 article-title: Project scheduling with resource constraints – volume: 88 start-page: 411 issue: 3 year: 2000 ident: 10.1016/j.omega.2016.09.009_bib13 article-title: Robust solutions of linear programming problems contaminated with uncertain data publication-title: Mathematical Programming doi: 10.1007/PL00011380 – volume: 99 start-page: 351 issue: 2 year: 2004 ident: 10.1016/j.omega.2016.09.009_bib14 article-title: Adjustable robust solutions of uncertain linear programs publication-title: Mathematical Programming doi: 10.1007/s10107-003-0454-y – volume: 66 start-page: 99 issue: 2 year: 2015 ident: 10.1016/j.omega.2016.09.009_bib1 article-title: Robust constrained shortest path problems under budgeted uncertainty publication-title: Networks doi: 10.1002/net.21615 – year: 1997 ident: 10.1016/j.omega.2016.09.009_bib29 – ident: 10.1016/j.omega.2016.09.009_bib24 doi: 10.2139/ssrn.1588642 |
SSID | ssj0001803 |
Score | 2.546844 |
Snippet | This paper addresses the resource-constrained project scheduling problem with uncertain activity durations. An adaptive robust optimization model is proposed... |
SourceID | crossref elsevier |
SourceType | Enrichment Source Index Database Publisher |
StartPage | 66 |
SubjectTerms | Benders decomposition Project scheduling Resource constraints Robust optimization |
Title | An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations |
URI | https://dx.doi.org/10.1016/j.omega.2016.09.009 |
Volume | 71 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LS8NAEF5KBfEiPrE-yh48ujaPTTY9lmKpir1oobdlX5WWtim1vQr-c2eSjQ-QHryFkIVkMsw32XzzfYRccx7bBDKDoS4g44onTMO3LctiqwH_lYgSnB1-GqT9IX8YJaMa6VazMEir9LW_rOlFtfZnWj6areVk0nrGVEVBdOgo8OcgaoJyLjDLb9-_aR5hFpQWyUhSg6sr5aGC45XP3SuKD4VpIXaKrMS_0OkH4vQOyL5vFWmnvJtDUnOLI7JbMdWPyUdnQZWd4gSUnjm6yjUc0hxqwNwPV9LC54ZCX0qhz6Mrv1XPDDaF6A3hLPVbMRS-cgF1cDidepMZinu0FHCvZA1QHIFApwlqN2XavJ2QYe_updtn3lGBmTjmazYOlcoijW0Dt1Zntm3HKGGm7TiKROJcUjjbxU4HoU4B3Iyw3DroeYQx6GN1SuqLfOHOCDUusiJLUwWVm6OIfaAyHgqhXGhiYdIGiapISuPlxvHJZrLilU1lEX6J4ZdBW0L4G-Tma9GyVNvYfnlavSL5K2kk4MG2hef_XXhB9iLE9YJkdknq69XGXUFXstbNIu2aZKdz_9gffAIGUuQ3 |
linkProvider | Elsevier |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1La8JAEB6sQttL6ZPa5x56bNAkm4dHkYrWx6UK3pbsw6KoEas_oP-8M8lGWig99BZCFpLJMPNl8833ATxx7usAM8MhXUCHJzxwJH7bOrGvJfb_JPICmh0eDMPOmL9OgkkJWsUsDNEqbe3Pa3pWre2Zmo1mbT2b1d4oVUkQHREF_RzkB1AhdaqgDJVmt9cZ7guyG9dzl2TiqeGCQnwoo3mlS_NO-kNumOmdEjHxtwb1rem0T-HEokXWzG_oDEpmdQ6HBVn9Aj6bK5boOQ1ByYVhm1TiIUuxDCztfCXLrG4YQlOGUI9t7G69owgXkj2E0czuxjD80MXGQ_PpzPrMMNqmZdj6cuIAoykIMptgepdnzscljNsvo1bHsaYKjvJ9vnWmbpLEniTkwLWWsW7oKamYST31vCgwJsjM7Xwj664Msb-pSHNtEPZESpGV1RWUV-nKXANTxtNRHIYJFm9OOvb1JOZuFCXGVX6kwip4RSSFsorj9GQLUVDL5iILv6Dwi3pDYPir8LxftM4FN_6-PCxekfiRNwJbwl8Lb_678BGOOqNBX_S7w94tHHvU5jPO2R2Ut5uduUeQspUPNgm_ANZ15ug |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=An+adjustable+robust+optimization+model+for+the+resource-constrained+project+scheduling+problem+with+uncertain+activity+durations&rft.jtitle=Omega+%28Oxford%29&rft.au=Bruni%2C+M.E.&rft.au=Di+Puglia+Pugliese%2C+L.&rft.au=Beraldi%2C+P.&rft.au=Guerriero%2C+F.&rft.date=2017-09-01&rft.issn=0305-0483&rft.volume=71&rft.spage=66&rft.epage=84&rft_id=info:doi/10.1016%2Fj.omega.2016.09.009&rft.externalDBID=n%2Fa&rft.externalDocID=10_1016_j_omega_2016_09_009 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0305-0483&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0305-0483&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0305-0483&client=summon |