Yang, W., Xu, M., Peng, W., & Liu, T. (2024). Optimization Study on Key Technology of Improved Arch Cover Method Construction for Underground Metro Stations Based on Similar Model Test. Applied sciences, 14(10), 3982. https://doi.org/10.3390/app14103982
Chicago Style (17th ed.) CitationYang, Wangxing, Mingkai Xu, Wenxiang Peng, and Taoying Liu. "Optimization Study on Key Technology of Improved Arch Cover Method Construction for Underground Metro Stations Based on Similar Model Test." Applied Sciences 14, no. 10 (2024): 3982. https://doi.org/10.3390/app14103982.
MLA (9th ed.) CitationYang, Wangxing, et al. "Optimization Study on Key Technology of Improved Arch Cover Method Construction for Underground Metro Stations Based on Similar Model Test." Applied Sciences, vol. 14, no. 10, 2024, p. 3982, https://doi.org/10.3390/app14103982.