APA (7th ed.) Citation

Saraçoğlu, İ., Süer, G. A., & Gannon, P. (2021). Minimizing makespan and flowtime in a parallel multi-stage cellular manufacturing company. Robotics and computer-integrated manufacturing, 72, 102182. https://doi.org/10.1016/j.rcim.2021.102182

Chicago Style (17th ed.) Citation

Saraçoğlu, İlkay, Gürsel A. Süer, and Patrick Gannon. "Minimizing Makespan and Flowtime in a Parallel Multi-stage Cellular Manufacturing Company." Robotics and Computer-integrated Manufacturing 72 (2021): 102182. https://doi.org/10.1016/j.rcim.2021.102182.

MLA (9th ed.) Citation

Saraçoğlu, İlkay, et al. "Minimizing Makespan and Flowtime in a Parallel Multi-stage Cellular Manufacturing Company." Robotics and Computer-integrated Manufacturing, vol. 72, 2021, p. 102182, https://doi.org/10.1016/j.rcim.2021.102182.

Warning: These citations may not always be 100% accurate.