Assessment of reliability and maintainability of earth pressure balance tunnel boring machine (EPBTBM) – An approach

•EPBTBM are used in soft or mixed ground condition.•TBF and TTR data are found independent and identically distributed (IID).•MTBF and MTTR were calculated as 11.95 h and 5.78 h respectively.•The availability of EPBTBM is about 67%.•According to FMECA, disc cutter is the most vulnerable part of the...

Full description

Saved in:
Bibliographic Details
Published inTunnelling and underground space technology Vol. 121; p. 104337
Main Authors Kumar Agrawal, Anil, Chattopadhyaya, Somnath, Murthy, V.M.S.R., Kumar Adesh, Adesh
Format Journal Article
LanguageEnglish
Published Oxford Elsevier Ltd 01.03.2022
Elsevier BV
Subjects
Online AccessGet full text

Cover

Loading…
Abstract •EPBTBM are used in soft or mixed ground condition.•TBF and TTR data are found independent and identically distributed (IID).•MTBF and MTTR were calculated as 11.95 h and 5.78 h respectively.•The availability of EPBTBM is about 67%.•According to FMECA, disc cutter is the most vulnerable part of the EPBTBM. Earth pressure balance tunnel boring machines (EPBTBM) are used in soft or mixed ground conditions often encountered in tunneling operations. The performance of EPBTBM could be enhanced to a great extent by appropriate time management, proper maintenance and reduced unproductive times such as idle hours and breakdown hours using reliability analysis. The reliability of a system primarily depends on time between failure (TBF) and maintainability is based on time to repair (TTR). Investigations on EPBTBM system performance were carried out for an irrigation tunnel through mixed strata conditions and the failure/repair data were collected. TBF and TTR data are found independent and identically distributed (IID). This implies that data are not following any particular trend or correlation. Therefore, these data are fitted in different types of probability distributions such as Gamma, Lognormal, Weibull with Easyfit and MATLAB tools. All the distributions are subjected to a Kolmogorov-Smirnov (k-s) test. Data analysis carried out on EPBTBM deployed in tunnels showed that TBF data and TTR data are found to best fit in General Gamma (4p) and General Gamma distribution respectively. Analysis indicated that ninety percent level of reliability of the system is at 2.64 h of operation whereas the mean time to repair is 5.78 h. The overall availability of the system was 67% which is comparatively less. Failure mode effects and criticality analysis (FMECA) was also carried out to find the critical part of the EPBTBM system. Disc cutter got the highest risk priority number indicating that it is the most vulnerable part of the EPBTBM. This paper reports that the availability of such systems can be increased to 80 percent by appropriate scheduling, preventive maintenance, and effective use of skilled manpower.
AbstractList •EPBTBM are used in soft or mixed ground condition.•TBF and TTR data are found independent and identically distributed (IID).•MTBF and MTTR were calculated as 11.95 h and 5.78 h respectively.•The availability of EPBTBM is about 67%.•According to FMECA, disc cutter is the most vulnerable part of the EPBTBM. Earth pressure balance tunnel boring machines (EPBTBM) are used in soft or mixed ground conditions often encountered in tunneling operations. The performance of EPBTBM could be enhanced to a great extent by appropriate time management, proper maintenance and reduced unproductive times such as idle hours and breakdown hours using reliability analysis. The reliability of a system primarily depends on time between failure (TBF) and maintainability is based on time to repair (TTR). Investigations on EPBTBM system performance were carried out for an irrigation tunnel through mixed strata conditions and the failure/repair data were collected. TBF and TTR data are found independent and identically distributed (IID). This implies that data are not following any particular trend or correlation. Therefore, these data are fitted in different types of probability distributions such as Gamma, Lognormal, Weibull with Easyfit and MATLAB tools. All the distributions are subjected to a Kolmogorov-Smirnov (k-s) test. Data analysis carried out on EPBTBM deployed in tunnels showed that TBF data and TTR data are found to best fit in General Gamma (4p) and General Gamma distribution respectively. Analysis indicated that ninety percent level of reliability of the system is at 2.64 h of operation whereas the mean time to repair is 5.78 h. The overall availability of the system was 67% which is comparatively less. Failure mode effects and criticality analysis (FMECA) was also carried out to find the critical part of the EPBTBM system. Disc cutter got the highest risk priority number indicating that it is the most vulnerable part of the EPBTBM. This paper reports that the availability of such systems can be increased to 80 percent by appropriate scheduling, preventive maintenance, and effective use of skilled manpower.
Earth pressure balance tunnel boring machines (EPBTBM) are used in soft or mixed ground conditions often encountered in tunneling operations. The performance of EPBTBM could be enhanced to a great extent by appropriate time management, proper maintenance and reduced unproductive times such as idle hours and breakdown hours using reliability analysis. The reliability of a system primarily depends on time between failure (TBF) and maintainability is based on time to repair (TTR). Investigations on EPBTBM system performance were carried out for an irrigation tunnel through mixed strata conditions and the failure/repair data were collected. TBF and TTR data are found independent and identically distributed (IID). This implies that data are not following any particular trend or correlation. Therefore, these data are fitted in different types of probability distributions such as Gamma, Lognormal, Weibull with Easyfit and MATLAB tools. All the distributions are subjected to a Kolmogorov-Smirnov (k-s) test. Data analysis carried out on EPBTBM deployed in tunnels showed that TBF data and TTR data are found to best fit in General Gamma (4p) and General Gamma distribution respectively. Analysis indicated that ninety percent level of reliability of the system is at 2.64 h of operation whereas the mean time to repair is 5.78 h. The overall availability of the system was 67% which is comparatively less. Failure mode effects and criticality analysis (FMECA) was also carried out to find the critical part of the EPBTBM system. Disc cutter got the highest risk priority number indicating that it is the most vulnerable part of the EPBTBM. This paper reports that the availability of such systems can be increased to 80 percent by appropriate scheduling, preventive maintenance, and effective use of skilled manpower.
ArticleNumber 104337
Author Kumar Agrawal, Anil
Chattopadhyaya, Somnath
Murthy, V.M.S.R.
Kumar Adesh, Adesh
Author_xml – sequence: 1
  givenname: Anil
  surname: Kumar Agrawal
  fullname: Kumar Agrawal, Anil
– sequence: 2
  givenname: Somnath
  surname: Chattopadhyaya
  fullname: Chattopadhyaya, Somnath
  email: somnathchattopadhyaya@iitism.ac.in
– sequence: 3
  givenname: V.M.S.R.
  surname: Murthy
  fullname: Murthy, V.M.S.R.
– sequence: 4
  givenname: Adesh
  surname: Kumar Adesh
  fullname: Kumar Adesh, Adesh
BookMark eNp9kMtOAyEUhonRxLb6Aq5I3OhiKjA3SNxU4y2p0UVdE4Y5Y2mmTAWmSXe-g2_ok0hT3bjogpzk8H8czjdEh7azgNAZJWNKaHG1GIfehzEjjMZGlqblARpQXvIkS4vsEA0I50VSloIfo6H3C0JIzpgYoPXEe_B-CTbgrsEOWqMq05qwwcrWeKmMDfH89WIElAtzvHKR6h3gSrXKasChtxZaXHXO2PfI6bmxgC_uXm9mN8-X-PvzC08sVquV6-LdCTpqVOvh9LeO0Nv93ez2MZm-PDzdTqaJThkPSUoKllOek4aXgsVPQ10LzrIsh4aVVAtBKVE5EwUvCVTQFKRSoFVapVAQxdIROt-9G8d-9OCDXHS9s3GkZEVGSiG4yGKK71Ladd47aKQ2QQXT2eCUaSUlcmtZLuTWstxaljvLEWX_0JUzS-U2-6HrHQRx9bUBJ702EC3WxoEOsu7MPvwH5VOZXw
CitedBy_id crossref_primary_10_1016_j_heliyon_2023_e23486
Cites_doi 10.17485/ijst/2015/v8i28/83916
10.12720/joams.3.3.203-210
10.1016/j.tust.2013.01.002
10.1016/j.tust.2016.05.010
10.1016/j.tust.2015.04.017
10.1201/9780429424441-412
10.1007/s40430-018-1016-9
10.1016/j.ress.2018.08.014
10.1007/s13198-014-0240-7
10.1016/j.engfailanal.2019.07.013
10.1016/j.engfailanal.2019.02.014
10.1016/0951-8320(89)90004-5
10.1016/j.ress.2007.10.006
10.1007/s40430-015-0393-6
10.1201/9780429424441-382
10.1002/geot.200800006
10.1016/j.ijmst.2014.12.002
10.1016/B978-088415257-6/50009-0
ContentType Journal Article
Copyright 2021 Elsevier Ltd
Copyright Elsevier BV Mar 2022
Copyright_xml – notice: 2021 Elsevier Ltd
– notice: Copyright Elsevier BV Mar 2022
DBID AAYXX
CITATION
8FD
FR3
KR7
DOI 10.1016/j.tust.2021.104337
DatabaseName CrossRef
Technology Research Database
Engineering Research Database
Civil Engineering Abstracts
DatabaseTitle CrossRef
Technology Research Database
Civil Engineering Abstracts
Engineering Research Database
DatabaseTitleList
Technology Research Database
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 1878-4364
ExternalDocumentID 10_1016_j_tust_2021_104337
S0886779821005289
GroupedDBID --K
--M
.~1
0R~
123
1B1
1RT
1~.
1~5
29Q
4.4
457
4G.
5VS
7-5
71M
8P~
9JN
AACTN
AAEDT
AAEDW
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AAQXK
AAXUO
ABFNM
ABJNI
ABMAC
ABQEM
ABQYD
ABXDB
ABYKQ
ACDAQ
ACGFS
ACIWK
ACLVX
ACNNM
ACRLP
ACSBN
ADBBV
ADEZE
ADMUD
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHJVU
AIEXJ
AIKHN
AITUG
AJBFU
AJOXV
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
ASPBG
ATOGT
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BLXMC
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
HMA
HVGLF
HZ~
IHE
IMUCA
J1W
JJJVA
KOM
LY3
LY7
M41
MO0
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
Q38
R2-
RIG
ROL
RPZ
SDF
SDG
SEP
SES
SET
SEW
SPC
SPCBC
SSE
SST
SSZ
T5K
WUQ
ZMT
~02
~G-
AATTM
AAXKI
AAYWO
AAYXX
ABWVN
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AFXIZ
AGCQF
AGQPQ
AGRNS
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
BNPGV
CITATION
SSH
8FD
EFKBS
FR3
KR7
ID FETCH-LOGICAL-c328t-306251850f8792000edd982445ef271c99110a5296870ebef60baeca3b3e60a23
IEDL.DBID .~1
ISSN 0886-7798
IngestDate Fri Jul 25 06:57:49 EDT 2025
Tue Jul 01 01:06:31 EDT 2025
Thu Apr 24 23:08:26 EDT 2025
Fri Feb 23 02:40:30 EST 2024
IsPeerReviewed true
IsScholarly true
Keywords Availability
Lognormal
Probability distribution (Gamma
FMECA
Weibull
Downtime
Maintenance
EPBTBM
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c328t-306251850f8792000edd982445ef271c99110a5296870ebef60baeca3b3e60a23
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
PQID 2640799894
PQPubID 2045384
ParticipantIDs proquest_journals_2640799894
crossref_citationtrail_10_1016_j_tust_2021_104337
crossref_primary_10_1016_j_tust_2021_104337
elsevier_sciencedirect_doi_10_1016_j_tust_2021_104337
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate March 2022
2022-03-00
20220301
PublicationDateYYYYMMDD 2022-03-01
PublicationDate_xml – month: 03
  year: 2022
  text: March 2022
PublicationDecade 2020
PublicationPlace Oxford
PublicationPlace_xml – name: Oxford
PublicationTitle Tunnelling and underground space technology
PublicationYear 2022
Publisher Elsevier Ltd
Elsevier BV
Publisher_xml – name: Elsevier Ltd
– name: Elsevier BV
References Agrawal, Murthy, Chattopadhyaya (b0010) 2019; 105
Secara, Camelia, Silviu, Emil (b0130) 2015
Khetwal, A., Rostami, J., Frough, O., 2019. Simulation of TBM operation to assess the impact of geology on the muck transportation. Tunnels Undergr. Cities Eng. Innov. meet Archaeol. Archit. Art- Proc. WTC 2019 ITA-AITES World Tunn. Congr. 3895–3903. https://doi.org/10.1201/9780429424441-412.
Sinha, Mukhopadhyay (b0150) 2015; 6
Bilgin, Copur, Balci (b0035) 2016
Dhillon, B.S. (Balbir S.., 1999. Engineering Maintainability:: How to Design for Reliability and Easy Maintenance. Gulf Professional Publishing.
Köppl, Thuro, Thewes (b0090) 2015; 49
Kapur (b0080) 2001
Mosavat, K., 2015. Examination of excavation chamber pressure behavior on a 17.5 m diameter earth pressure balance tunnel boring machine. Colorado School of Mines.
Sharifzadeh, Kolivand, Ghorbani, Yasrobi (b0135) 2013; 35
Demirel, Gölbaşi, Düzgün, Kestel (b0045) 2014
Sinha, Mukhopadhyay (b0145) 2016; 38
Singh, Singh, Singh (b0140) 2019; 99
Agrawal, Chattopadhyaya, Murthy, Legutko, Krolczyk (b0005) 2020; 12
Thewes, König, Scheffer (b0155) 2017
Roy, Bhattacharyya, Naikan (b0120) 2001; 110
Clark, J., 2019. Challenging mixed face tunneling at India’s sleemanabad carrier canal. Tunnels Undergr. Cities Eng. Innov. meet Archaeol. Archit. Art- Proc. WTC 2019 ITA-AITES World Tunn. Congr. 3605–3615. https://doi.org/10.1201/9780429424441-382.
Kumar, Klefsjö, Granholm (b0095) 1989; 26
Lalropuia, Gupta (b0100) 2019; 181
Moosazadeh, Aghababaie, Hoseinie, Ghodrati (b0105) 2018; 9
Barabady (b0025) 2005
Gong, Luo, Qiu, Wang (b0070) 2020
Vidyasagar, Kishorilal (b0160) 2016; 06
Ali Bahri, N., Mohammad Ali Ebrahimi, F., Golam Reza, S., 2015. A fuzzy logic model to predict the out-of-seam dilution in longwall mining. Int. J. Min. Sci. Technol. 25, 91–98. https://doi.org/10.1016/j.ijmst.2014.12.002.
Fan, Fan (b0060) 2015; 3
Gong, Liu, Zhang (b0075) 2016; 57
Pandey, Mukhopadhyay, Chattopadhyaya (b0115) 2018; 40
Barabady, Kumar (b0030) 2008; 93
Frenzel, Käsling, Thuro (b0065) 2008; 1
Samanta, Sarkar, Mukherjee (b0125) 2004; 104
Amini Khoshalan, Torabi, Maleki (b0020) 2015; 8
Dewangan, Jha, Banjare (b0050) 2014; 3
10.1016/j.tust.2021.104337_b0040
Lalropuia (10.1016/j.tust.2021.104337_b0100) 2019; 181
Agrawal (10.1016/j.tust.2021.104337_b0005) 2020; 12
10.1016/j.tust.2021.104337_b0085
Singh (10.1016/j.tust.2021.104337_b0140) 2019; 99
Sinha (10.1016/j.tust.2021.104337_b0145) 2016; 38
Agrawal (10.1016/j.tust.2021.104337_b0010) 2019; 105
Kapur (10.1016/j.tust.2021.104337_b0080) 2001
Barabady (10.1016/j.tust.2021.104337_b0025) 2005
Dewangan (10.1016/j.tust.2021.104337_b0050) 2014; 3
Samanta (10.1016/j.tust.2021.104337_b0125) 2004; 104
Gong (10.1016/j.tust.2021.104337_b0075) 2016; 57
Kumar (10.1016/j.tust.2021.104337_b0095) 1989; 26
Bilgin (10.1016/j.tust.2021.104337_b0035) 2016
10.1016/j.tust.2021.104337_b0015
Köppl (10.1016/j.tust.2021.104337_b0090) 2015; 49
Frenzel (10.1016/j.tust.2021.104337_b0065) 2008; 1
10.1016/j.tust.2021.104337_b0055
Gong (10.1016/j.tust.2021.104337_b0070) 2020
10.1016/j.tust.2021.104337_b0110
Sinha (10.1016/j.tust.2021.104337_b0150) 2015; 6
Barabady (10.1016/j.tust.2021.104337_b0030) 2008; 93
Thewes (10.1016/j.tust.2021.104337_b0155) 2017
Pandey (10.1016/j.tust.2021.104337_b0115) 2018; 40
Roy (10.1016/j.tust.2021.104337_b0120) 2001; 110
Amini Khoshalan (10.1016/j.tust.2021.104337_b0020) 2015; 8
Secara (10.1016/j.tust.2021.104337_b0130) 2015
Moosazadeh (10.1016/j.tust.2021.104337_b0105) 2018; 9
Sharifzadeh (10.1016/j.tust.2021.104337_b0135) 2013; 35
Demirel (10.1016/j.tust.2021.104337_b0045) 2014
Fan (10.1016/j.tust.2021.104337_b0060) 2015; 3
Vidyasagar (10.1016/j.tust.2021.104337_b0160) 2016; 06
References_xml – volume: 99
  start-page: 180
  year: 2019
  end-page: 191
  ident: b0140
  article-title: Distribution transformer failure modes, effects and criticality analysis (FMECA)
  publication-title: Eng. Fail. Anal.
– volume: 40
  year: 2018
  ident: b0115
  article-title: Reliability analysis and failure rate evaluation for critical subsystems of the dragline
  publication-title: J. Brazilian Soc. Mech. Sci. Eng.
– volume: 3
  start-page: 203
  year: 2015
  end-page: 210
  ident: b0060
  article-title: Reliability Analysis and Failure Prediction of Construction Equipment with Time Series Models
  publication-title: J. Adv. Manag. Sci.
– volume: 06
  start-page: 24
  year: 2016
  end-page: 27
  ident: b0160
  article-title: Maintenance and Performance Analysis of Draglines Used In Mines
  publication-title: Int. J. Comput. Eng. Res. Maint.
– volume: 3
  start-page: 14915
  year: 2014
  end-page: 14923
  ident: b0050
  article-title: Reliability investigation of steam turbine used in thermal power plant
  publication-title: Int. J. Innov. Res. Sci. Eng. Technol.
– volume: 35
  start-page: 178
  year: 2013
  end-page: 188
  ident: b0135
  article-title: Design of sequential excavation method for large span urban tunnels in soft ground - Niayesh tunnel
  publication-title: Tunn. Undergr. Sp. Technol.
– volume: 105
  start-page: 477
  year: 2019
  end-page: 489
  ident: b0010
  article-title: Investigations into reliability, maintainability and availability of tunnel boring machine operating in mixed ground condition using Markov chains
  publication-title: Eng. Fail. Anal.
– reference: Khetwal, A., Rostami, J., Frough, O., 2019. Simulation of TBM operation to assess the impact of geology on the muck transportation. Tunnels Undergr. Cities Eng. Innov. meet Archaeol. Archit. Art- Proc. WTC 2019 ITA-AITES World Tunn. Congr. 3895–3903. https://doi.org/10.1201/9780429424441-412.
– reference: Dhillon, B.S. (Balbir S.., 1999. Engineering Maintainability:: How to Design for Reliability and Easy Maintenance. Gulf Professional Publishing.
– volume: 104
  start-page: 1
  year: 2004
  end-page: 8
  ident: b0125
  article-title: Reliability modelling and performance analyses of an LHD system in mining
  publication-title: J. South African Inst. Min. Metall.
– reference: Ali Bahri, N., Mohammad Ali Ebrahimi, F., Golam Reza, S., 2015. A fuzzy logic model to predict the out-of-seam dilution in longwall mining. Int. J. Min. Sci. Technol. 25, 91–98. https://doi.org/10.1016/j.ijmst.2014.12.002.
– start-page: 109
  year: 2005
  end-page: 115
  ident: b0025
  article-title: Reliability and maintainability analysis of crushing plants in Jajarm bauxite mine of Iran, in
  publication-title: Proceedings - Annual Reliability and Maintainability Symposium. IEEE
– start-page: 143
  year: 2015
  end-page: 150
  ident: b0130
  article-title: Study of Reliability Modeling and Performance Analysis of Haul Trucks in Quarries
  publication-title: Adv. Inf. Sci. Comput. Eng.
– reference: Clark, J., 2019. Challenging mixed face tunneling at India’s sleemanabad carrier canal. Tunnels Undergr. Cities Eng. Innov. meet Archaeol. Archit. Art- Proc. WTC 2019 ITA-AITES World Tunn. Congr. 3605–3615. https://doi.org/10.1201/9780429424441-382.
– start-page: 1
  year: 2017
  end-page: 16
  ident: b0155
  article-title: Prozesssimulation für maschinelle Tunnelvortriebe - Leistungsanalysen unter Berücksichtigung von Logistik
– volume: 49
  start-page: 287
  year: 2015
  end-page: 294
  ident: b0090
  article-title: Suggestion of an empirical prognosis model for cutting tool wear of Hydroshield TBM
  publication-title: Tunn. Undergr. Sp. Technol.
– volume: 26
  start-page: 341
  year: 1989
  end-page: 361
  ident: b0095
  article-title: Reliability investigation for a fleet of load haul dump machines in a Swedish mine
  publication-title: Reliab. Eng. Syst. Saf.
– volume: 181
  start-page: 28
  year: 2019
  end-page: 37
  ident: b0100
  article-title: Modeling cyber-physical attacks based on stochastic game and Markov processes
  publication-title: Reliab. Eng. Syst. Saf.
– reference: Mosavat, K., 2015. Examination of excavation chamber pressure behavior on a 17.5 m diameter earth pressure balance tunnel boring machine. Colorado School of Mines.
– start-page: 1921
  year: 2001
  end-page: 1955
  ident: b0080
  article-title: Reliability and maintainability
  publication-title: Handb. Ind. Eng. Technol. Oper. Manag.
– volume: 1
  start-page: 55
  year: 2008
  end-page: 60
  ident: b0065
  article-title: Factors Influencing Disc Cutter Wear
  publication-title: Geomech. und Tunnelbau
– volume: 110
  start-page: 163
  year: 2001
  end-page: 171
  ident: b0120
  article-title: Maintainability and reliability analysis of a fleet of shovels
  publication-title: Inst Min. Metall. Trans. Sect. A Min. Technol.
– volume: 9
  start-page: 53
  year: 2018
  end-page: 60
  ident: b0105
  article-title: Simulation of tunnel boring machine utilization: A case study
  publication-title: J. Min. Environ.
– volume: 38
  start-page: 665
  year: 2016
  end-page: 678
  ident: b0145
  article-title: Failure analysis of jaw crusher and its components using ANOVA
  publication-title: J. Brazilian Soc. Mech. Sci. Eng.
– year: 2020
  ident: b0070
  article-title: Determination of key components in automobile braking systems based on ABC classification and FMECA
  publication-title: Journal of Traffic and Transportation Engineering (English Edition)
– volume: 8
  start-page: 173
  year: 2015
  end-page: 185
  ident: b0020
  article-title: RAM Analysis of Hydraulic System of Earth Pressure Balance Tunnel Boring Machine
  publication-title: Indian J. Sci. Technol.
– volume: 57
  start-page: 1
  year: 2016
  end-page: 3
  ident: b0075
  article-title: Tunnel boring machines (TBMs) in difficult grounds
  publication-title: Tunn. Undergr. Sp. Technol.
– volume: 12
  start-page: 1
  year: 2020
  end-page: 15
  ident: b0005
  article-title: A Novel Method of laser coating process on worn-out cutter rings of tunnel boring machine for eco-friendly reuse
  publication-title: Symmetry (Basel).
– start-page: 1151
  year: 2014
  end-page: 1158
  ident: b0045
  publication-title: Mine Planning and Equipment Selection
– volume: 6
  start-page: 32
  year: 2015
  end-page: 35
  ident: b0150
  article-title: Reliability centered maintenance of cone crusher: a case study
  publication-title: Int. J. Syst. Assur. Eng. Manag.
– volume: 93
  start-page: 647
  year: 2008
  end-page: 653
  ident: b0030
  article-title: Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran
  publication-title: Reliab. Eng. Syst. Saf.
– year: 2016
  ident: b0035
  article-title: TBM Excavation in Difficult Ground Conditions, TBM Excavation in Difficult Ground Conditions
  publication-title: John Wiley & Sons.
– volume: 8
  start-page: 173
  year: 2015
  ident: 10.1016/j.tust.2021.104337_b0020
  article-title: RAM Analysis of Hydraulic System of Earth Pressure Balance Tunnel Boring Machine
  publication-title: Indian J. Sci. Technol.
  doi: 10.17485/ijst/2015/v8i28/83916
– start-page: 143
  year: 2015
  ident: 10.1016/j.tust.2021.104337_b0130
  article-title: Study of Reliability Modeling and Performance Analysis of Haul Trucks in Quarries
  publication-title: Adv. Inf. Sci. Comput. Eng.
– volume: 3
  start-page: 203
  year: 2015
  ident: 10.1016/j.tust.2021.104337_b0060
  article-title: Reliability Analysis and Failure Prediction of Construction Equipment with Time Series Models
  publication-title: J. Adv. Manag. Sci.
  doi: 10.12720/joams.3.3.203-210
– start-page: 1
  year: 2017
  ident: 10.1016/j.tust.2021.104337_b0155
– volume: 104
  start-page: 1
  year: 2004
  ident: 10.1016/j.tust.2021.104337_b0125
  article-title: Reliability modelling and performance analyses of an LHD system in mining
  publication-title: J. South African Inst. Min. Metall.
– volume: 35
  start-page: 178
  year: 2013
  ident: 10.1016/j.tust.2021.104337_b0135
  article-title: Design of sequential excavation method for large span urban tunnels in soft ground - Niayesh tunnel
  publication-title: Tunn. Undergr. Sp. Technol.
  doi: 10.1016/j.tust.2013.01.002
– volume: 57
  start-page: 1
  year: 2016
  ident: 10.1016/j.tust.2021.104337_b0075
  article-title: Tunnel boring machines (TBMs) in difficult grounds
  publication-title: Tunn. Undergr. Sp. Technol.
  doi: 10.1016/j.tust.2016.05.010
– volume: 49
  start-page: 287
  year: 2015
  ident: 10.1016/j.tust.2021.104337_b0090
  article-title: Suggestion of an empirical prognosis model for cutting tool wear of Hydroshield TBM
  publication-title: Tunn. Undergr. Sp. Technol.
  doi: 10.1016/j.tust.2015.04.017
– volume: 3
  start-page: 14915
  year: 2014
  ident: 10.1016/j.tust.2021.104337_b0050
  article-title: Reliability investigation of steam turbine used in thermal power plant
  publication-title: Int. J. Innov. Res. Sci. Eng. Technol.
– volume: 9
  start-page: 53
  year: 2018
  ident: 10.1016/j.tust.2021.104337_b0105
  article-title: Simulation of tunnel boring machine utilization: A case study
  publication-title: J. Min. Environ.
– ident: 10.1016/j.tust.2021.104337_b0085
  doi: 10.1201/9780429424441-412
– ident: 10.1016/j.tust.2021.104337_b0110
– volume: 40
  issue: 2
  year: 2018
  ident: 10.1016/j.tust.2021.104337_b0115
  article-title: Reliability analysis and failure rate evaluation for critical subsystems of the dragline
  publication-title: J. Brazilian Soc. Mech. Sci. Eng.
  doi: 10.1007/s40430-018-1016-9
– volume: 181
  start-page: 28
  year: 2019
  ident: 10.1016/j.tust.2021.104337_b0100
  article-title: Modeling cyber-physical attacks based on stochastic game and Markov processes
  publication-title: Reliab. Eng. Syst. Saf.
  doi: 10.1016/j.ress.2018.08.014
– volume: 6
  start-page: 32
  issue: 1
  year: 2015
  ident: 10.1016/j.tust.2021.104337_b0150
  article-title: Reliability centered maintenance of cone crusher: a case study
  publication-title: Int. J. Syst. Assur. Eng. Manag.
  doi: 10.1007/s13198-014-0240-7
– volume: 105
  start-page: 477
  year: 2019
  ident: 10.1016/j.tust.2021.104337_b0010
  article-title: Investigations into reliability, maintainability and availability of tunnel boring machine operating in mixed ground condition using Markov chains
  publication-title: Eng. Fail. Anal.
  doi: 10.1016/j.engfailanal.2019.07.013
– year: 2020
  ident: 10.1016/j.tust.2021.104337_b0070
  article-title: Determination of key components in automobile braking systems based on ABC classification and FMECA
  publication-title: Journal of Traffic and Transportation Engineering (English Edition)
– volume: 99
  start-page: 180
  year: 2019
  ident: 10.1016/j.tust.2021.104337_b0140
  article-title: Distribution transformer failure modes, effects and criticality analysis (FMECA)
  publication-title: Eng. Fail. Anal.
  doi: 10.1016/j.engfailanal.2019.02.014
– volume: 12
  start-page: 1
  year: 2020
  ident: 10.1016/j.tust.2021.104337_b0005
  article-title: A Novel Method of laser coating process on worn-out cutter rings of tunnel boring machine for eco-friendly reuse
  publication-title: Symmetry (Basel).
– volume: 26
  start-page: 341
  issue: 4
  year: 1989
  ident: 10.1016/j.tust.2021.104337_b0095
  article-title: Reliability investigation for a fleet of load haul dump machines in a Swedish mine
  publication-title: Reliab. Eng. Syst. Saf.
  doi: 10.1016/0951-8320(89)90004-5
– volume: 93
  start-page: 647
  issue: 4
  year: 2008
  ident: 10.1016/j.tust.2021.104337_b0030
  article-title: Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran
  publication-title: Reliab. Eng. Syst. Saf.
  doi: 10.1016/j.ress.2007.10.006
– start-page: 1921
  year: 2001
  ident: 10.1016/j.tust.2021.104337_b0080
  article-title: Reliability and maintainability
  publication-title: Handb. Ind. Eng. Technol. Oper. Manag.
– volume: 38
  start-page: 665
  issue: 2
  year: 2016
  ident: 10.1016/j.tust.2021.104337_b0145
  article-title: Failure analysis of jaw crusher and its components using ANOVA
  publication-title: J. Brazilian Soc. Mech. Sci. Eng.
  doi: 10.1007/s40430-015-0393-6
– ident: 10.1016/j.tust.2021.104337_b0040
  doi: 10.1201/9780429424441-382
– volume: 1
  start-page: 55
  issue: 1
  year: 2008
  ident: 10.1016/j.tust.2021.104337_b0065
  article-title: Factors Influencing Disc Cutter Wear
  publication-title: Geomech. und Tunnelbau
  doi: 10.1002/geot.200800006
– volume: 06
  start-page: 24
  year: 2016
  ident: 10.1016/j.tust.2021.104337_b0160
  article-title: Maintenance and Performance Analysis of Draglines Used In Mines
  publication-title: Int. J. Comput. Eng. Res. Maint.
– start-page: 109
  year: 2005
  ident: 10.1016/j.tust.2021.104337_b0025
  article-title: Reliability and maintainability analysis of crushing plants in Jajarm bauxite mine of Iran, in
  publication-title: Proceedings - Annual Reliability and Maintainability Symposium. IEEE
– year: 2016
  ident: 10.1016/j.tust.2021.104337_b0035
  article-title: TBM Excavation in Difficult Ground Conditions, TBM Excavation in Difficult Ground Conditions
  publication-title: John Wiley & Sons.
– start-page: 1151
  year: 2014
  ident: 10.1016/j.tust.2021.104337_b0045
– ident: 10.1016/j.tust.2021.104337_b0015
  doi: 10.1016/j.ijmst.2014.12.002
– ident: 10.1016/j.tust.2021.104337_b0055
  doi: 10.1016/B978-088415257-6/50009-0
– volume: 110
  start-page: 163
  issue: 3
  year: 2001
  ident: 10.1016/j.tust.2021.104337_b0120
  article-title: Maintainability and reliability analysis of a fleet of shovels
  publication-title: Inst Min. Metall. Trans. Sect. A Min. Technol.
SSID ssj0005229
Score 2.3310273
Snippet •EPBTBM are used in soft or mixed ground condition.•TBF and TTR data are found independent and identically distributed (IID).•MTBF and MTTR were calculated as...
Earth pressure balance tunnel boring machines (EPBTBM) are used in soft or mixed ground conditions often encountered in tunneling operations. The performance...
SourceID proquest
crossref
elsevier
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 104337
SubjectTerms Availability
Boring machines
Data analysis
Disc cutters
Downtime
Drilling & boring machinery
Earth pressure
EPBTBM
Failure analysis
Failure modes
FMECA
Idling
Lognormal
Maintainability
Maintenance
Preventive maintenance
Probability distribution (Gamma
Probability distribution functions
Reliability
Reliability analysis
Repair
Statistical analysis
System reliability
Time management
Tunnel construction
Tunnels
Underground construction
Weibull
Title Assessment of reliability and maintainability of earth pressure balance tunnel boring machine (EPBTBM) – An approach
URI https://dx.doi.org/10.1016/j.tust.2021.104337
https://www.proquest.com/docview/2640799894
Volume 121
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LSwMxEA5FL3oQn1itJQcPiqzdV7K7x7a0VKVFsIXeQjabYqVuS90KXsT_4D_0lzizj1JFevAaJtkl8ybfzBByzrXi4OggU40UN8BDKSNQLjO0G0kmLWXzdExnt8c7A_d2yIYl0ixqYRBWmdv-zKan1jpfqeW3WZuNx7UH0A_ueYEPSYvJIG_ACnbXQym_fl-FeaSTypDYQOq8cCbDeCVY1gDpv4VPnQ7OQv_bOf0y06nvae-SnTxopPXsv_ZIScf7ZHulleABea0vW2zS6YjO9WScdeB-ozKO6LMcx1mhVLYGJCDiySNNcbCLuaYhYhyVpskCkS80TIF5sA-xlppetO4b_Ub3kn59fNJ6TItW5Idk0G71mx0jn6lgKMf2EwMyBIhofGaOfC_AMh0dRXCFrsv0yPYsBeGiZUp8jAVFBgaPuBlKraQTOpqb0naOyEY8jfUxoR4PpMl1pCBCdH0zkJJ5tmRByOFE-ECZWMVlCpU3HMe5FxNRIMueBDJAIANExoAyuVrumWXtNtZSs4JH4ofQCPAHa_dVCoaKXGVfhI1PmgH2oz_557GnZMvG4ogUoVYhG8l8oc8gZEnCaiqTVbJZv7nr9L4BZ7jq2g
linkProvider Elsevier
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LS8NAEF60HtSD-MRH1T14UCQ2r90kx7ZU6qMiWMHbstlsMFJjqangRfwP_kN_iTN5lCriwesyuwk7b_abGUIOuFYcHB1kqpHiBngoZQTKZYZ2I8mkpWyej-nsXfHurXt-x-5mSLuqhUFYZWn7C5ueW-typVHeZmOYJI0b0A_ueYEPSYvJIG-YJXMuqC-OMTh5m8Z55KPKkNpA8rJypgB5ZVjXAPm_hW-dDg5D_907_bDTufM5XSZLZdRIm8WPrZAZna6SxalegmvkpTnpsUmfYjrSg6Rowf1KZRrRR5mkRaVUsQYkIOPZPc2BsOORpiGCHJWm2RihLzTMkXmwD8GWmh52rlv9Vu-Ifr5_0GZKq17k6-T2tNNvd41yqIKhHNvPDEgRIKTxmRn7XoB1OjqK4A5dl-nY9iwF8aJlSnyNBU0GDsfcDKVW0gkdzU1pOxuklj6lepNQjwfS5DpSECK6vhlIyTxbsiDkcCJ8YItY1WUKVXYcx8EXA1FByx4EMkAgA0TBgC1yPNkzLPpt_EnNKh6Jb1IjwCH8ua9eMVSUOvssbHzTDLAh_fY_j90n891-71Jcnl1d7JAFGyslcrhandSy0VjvQvyShXu5fH4B0XzsaA
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Assessment+of+reliability+and+maintainability+of+earth+pressure+balance+tunnel+boring+machine+%28EPBTBM%29+%E2%80%93+An+approach&rft.jtitle=Tunnelling+and+underground+space+technology&rft.au=Kumar+Agrawal%2C+Anil&rft.au=Chattopadhyaya%2C+Somnath&rft.au=Murthy%2C+V.M.S.R.&rft.au=Kumar+Adesh%2C+Adesh&rft.date=2022-03-01&rft.pub=Elsevier+Ltd&rft.issn=0886-7798&rft.eissn=1878-4364&rft.volume=121&rft_id=info:doi/10.1016%2Fj.tust.2021.104337&rft.externalDocID=S0886779821005289
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0886-7798&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0886-7798&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0886-7798&client=summon