APA (7th ed.) Citation

Pulkkinen, P., & Ritala, R. (2008). TMP production scheduling under uncertainty: Methodology and case studies. Chemical engineering and processing, 47(9), 1492-1503. https://doi.org/10.1016/j.cep.2007.06.017

Chicago Style (17th ed.) Citation

Pulkkinen, Petteri, and Risto Ritala. "TMP Production Scheduling Under Uncertainty: Methodology and Case Studies." Chemical Engineering and Processing 47, no. 9 (2008): 1492-1503. https://doi.org/10.1016/j.cep.2007.06.017.

MLA (9th ed.) Citation

Pulkkinen, Petteri, and Risto Ritala. "TMP Production Scheduling Under Uncertainty: Methodology and Case Studies." Chemical Engineering and Processing, vol. 47, no. 9, 2008, pp. 1492-1503, https://doi.org/10.1016/j.cep.2007.06.017.

Warning: These citations may not always be 100% accurate.