Project management challenges for post-disaster reconstruction projects in Angola: a public sector perspective
PurposeDespite the extensive research on post-disaster reconstruction projects (PDRP), there is a paucity of studies that examine critical challenges for the project practices in post-war-developing countries, particularly, Africa. The purpose of this research is to investigate the key project manag...
Saved in:
Published in | International journal of managing projects in business Vol. 14; no. 3; pp. 767 - 787 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Bingley
Emerald Publishing Limited
06.04.2021
Emerald Group Publishing Limited |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | PurposeDespite the extensive research on post-disaster reconstruction projects (PDRP), there is a paucity of studies that examine critical challenges for the project practices in post-war-developing countries, particularly, Africa. The purpose of this research is to investigate the key project management challenges impacting the post-disaster reconstruction projects (PDRP) during the construction and planning stages in Angola, with an aim to fill the knowledge gap.Design/methodology/approachThe primary data was collected from 130 project management practitioners working with planning, provincial government organisations including consultants, and contractors within the Angolan public sectors organisations. Response data was subjected to descriptive statistics, mean scores, and inferential statistics (One sample t-tests) and Kendall's concordance.FindingsThe descriptive and empirical analysis demonstrated a disparity of the ranking of the 21challenges affecting the PDRP among the groups; with statistically significant differences amongst the 10 challenges. Based on the overall sample, 6 out of 10 critical challenges are between (24–25) levels of agreement close to the mean. The results of the mean score ranking indicate that “working with poor or restricted access to location”, “project culture that fits the needs of local people”; “improving the capacity of local government”, “minimizing the negative effects of local people” and “relocation issues by establishing property rights during the reconstruction project” were the five critical challenges to managing PDRP whereas “improving information and communication processes”, “securing adequate resources (material and machinery)”, “dealing with rising costs of materials and labour” were considered to be the least critical.Research limitations/implicationsThe study was restricted to one province and Country (out of 18) namely, Luanda, Angola. Therefore, the findings may not be generalized to public sector organisations operating in different countries with different contexts, political settings and disaster complexities.Practical implicationsThe establishment of challenges in PDRPs helps the key stakeholders by providing the foundation to project teams to address the challenges during planning and construction stages, and thus improving project delivery in the future. Understanding the uniqueness of PDRPs and interdependency of project management from the implementing organization is of particular value for the managers of future projects and other decision-makers, especially in the emerging countries. Moreover, the findings could be used to reflect on the need to formulate policies appropriate to post disaster environments, which among other issues could address building policies, which could include land ownership regulations and procedures together with property rights.Originality/valueThis study contributes to the body of knowledge on the subject within a previously unexplored post-war context with a focus on public organizations perspective. The study provides insights on the challenges affecting the post-disaster reconstruction across the Angolan public sector. |
---|---|
AbstractList | PurposeDespite the extensive research on post-disaster reconstruction projects (PDRP), there is a paucity of studies that examine critical challenges for the project practices in post-war-developing countries, particularly, Africa. The purpose of this research is to investigate the key project management challenges impacting the post-disaster reconstruction projects (PDRP) during the construction and planning stages in Angola, with an aim to fill the knowledge gap.Design/methodology/approachThe primary data was collected from 130 project management practitioners working with planning, provincial government organisations including consultants, and contractors within the Angolan public sectors organisations. Response data was subjected to descriptive statistics, mean scores, and inferential statistics (One sample t-tests) and Kendall's concordance.FindingsThe descriptive and empirical analysis demonstrated a disparity of the ranking of the 21challenges affecting the PDRP among the groups; with statistically significant differences amongst the 10 challenges. Based on the overall sample, 6 out of 10 critical challenges are between (24–25) levels of agreement close to the mean. The results of the mean score ranking indicate that “working with poor or restricted access to location”, “project culture that fits the needs of local people”; “improving the capacity of local government”, “minimizing the negative effects of local people” and “relocation issues by establishing property rights during the reconstruction project” were the five critical challenges to managing PDRP whereas “improving information and communication processes”, “securing adequate resources (material and machinery)”, “dealing with rising costs of materials and labour” were considered to be the least critical.Research limitations/implicationsThe study was restricted to one province and Country (out of 18) namely, Luanda, Angola. Therefore, the findings may not be generalized to public sector organisations operating in different countries with different contexts, political settings and disaster complexities.Practical implicationsThe establishment of challenges in PDRPs helps the key stakeholders by providing the foundation to project teams to address the challenges during planning and construction stages, and thus improving project delivery in the future. Understanding the uniqueness of PDRPs and interdependency of project management from the implementing organization is of particular value for the managers of future projects and other decision-makers, especially in the emerging countries. Moreover, the findings could be used to reflect on the need to formulate policies appropriate to post disaster environments, which among other issues could address building policies, which could include land ownership regulations and procedures together with property rights.Originality/valueThis study contributes to the body of knowledge on the subject within a previously unexplored post-war context with a focus on public organizations perspective. The study provides insights on the challenges affecting the post-disaster reconstruction across the Angolan public sector. |
Author | Sospeter, Nyamagere Gladys Gimbi, Joaqium Rwelamila, Pantaleo M.D. |
Author_xml | – sequence: 1 givenname: Nyamagere Gladys surname: Sospeter fullname: Sospeter, Nyamagere Gladys email: nyamagere@yahoo.com – sequence: 2 givenname: Pantaleo M.D. orcidid: 0000-0002-1794-7255 surname: Rwelamila fullname: Rwelamila, Pantaleo M.D. email: Rwelapmd@unisa.ac.za – sequence: 3 givenname: Joaqium surname: Gimbi fullname: Gimbi, Joaqium email: joaqgimbi@hotmail.com |
BookMark | eNp9kV1LwzAUhoNMcJv-Aa8CXleTpm1S7-bwYzJxF3od0vR0dnRJTVLBf29rRVDEq_PCyXNy8mSGJsYaQOiUknNKibhY3T9sriLCopjEJCJE8AM0pTxlkWAim3xnLo7QzPsdIVmeUDpFZuPsDnTAe2XUFvZgAtYvqmnAbMHjyjrcWh-isvbKB3DYgbbGB9fpUFuD2xH3uDZ4Yba2UZdY4bYrmlpj33eGAeB828f6DY7RYaUaDydfdY6eb66flnfR-vF2tVysI80oD5GiKcsopEKQTKScVwWPFQeAkmgBwAloUsQ6yTllDFLQuSiTigPVmhU6z9gcnY1z-_1eO_BB7mznTH-ljFOWUMZ5L2SOxHhKO-u9g0rqOqjhXcGpupGUyMGu_LQrCZODXTnY7dH4F9q6eq_c-_8QHaHes1NN-Tfz4xvZBynMkGQ |
CitedBy_id | crossref_primary_10_1080_15578771_2022_2094506 crossref_primary_10_3390_app11104668 crossref_primary_10_1016_j_ijdrr_2024_104491 crossref_primary_10_1108_ECAM_07_2023_0655 crossref_primary_10_3390_su14010393 crossref_primary_10_1108_JEDT_02_2023_0040 |
Cites_doi | 10.3390/economies5040046 10.1016/j.ijproman.2012.03.001 10.3846/1648715X.2016.1189975 10.1016/j.habitatint.2010.08.003 10.1108/IJDRBE-07-2019-0050 10.1108/17595901011056631 10.1108/ECAM-01-2013-0001 10.1108/DPM-01-2016-0006 10.1108/09653560610669882 10.1108/IJDRBE-03-2017-0018 10.1016/j.ijproman.2016.09.005 10.1108/17595901011026508 10.1016/j.iatssr.2012.07.001 10.1108/MRR-02-2013-0027 10.1177/0956247807082819 10.1108/IJMPB-10-2013-0054 10.1108/ECAM-10-2016-0232 10.1108/17595901111149141 10.1007/s13753-017-0155-4 10.1016/j.ijproman.2011.03.005 10.1108/ECAM-11-2017-0240 10.1108/IJDRBE-09-2018-0037 10.1177/1747493017711815 10.1108/17595901211263611 10.1016/j.habitatint.2013.10.005 10.1016/0007-6813(95)90054-3 10.1108/01443570210414310 10.1080/09613211003693945 10.1016/j.worlddev.2008.01.006 10.1002/pmj.21278 10.3126/jie.v14i1.20068 |
ContentType | Journal Article |
Copyright | Emerald Publishing Limited Emerald Publishing Limited 2020 |
Copyright_xml | – notice: Emerald Publishing Limited – notice: Emerald Publishing Limited 2020 |
DBID | AAYXX CITATION 0U~ 1-H 7WY 7WZ 7XB AFKRA BENPR BEZIV CCPQU DWQXO F~G K6~ K8~ L.- L.0 M0C PHGZM PHGZT PKEHL PQBIZ PQEST PQQKQ PQUKI Q9U |
DOI | 10.1108/IJMPB-03-2020-0087 |
DatabaseName | CrossRef Global News & ABI/Inform Professional Trade PRO ProQuest ABI/INFORM Collection ABI/INFORM Global (PDF only) ProQuest Central (purchase pre-March 2016) ProQuest Central UK/Ireland ProQuest Central Business Premium Collection ProQuest One Community College ProQuest Central Korea ABI/INFORM Global (Corporate) ProQuest Business Collection DELNET Management Collection ABI/INFORM Professional Advanced ABI/INFORM Professional Standard ABI/INFORM Global ProQuest Central Premium ProQuest One Academic ProQuest One Academic Middle East (New) ProQuest One Business ProQuest One Academic Eastern Edition (DO NOT USE) ProQuest One Academic ProQuest One Academic UKI Edition ProQuest Central Basic |
DatabaseTitle | CrossRef Business Premium Collection ABI/INFORM Global (Corporate) ProQuest One Business ABI/INFORM Global ProQuest Central Basic ProQuest One Academic Middle East (New) ProQuest One Academic Eastern Edition ProQuest One Community College Trade PRO ProQuest Business Collection ABI/INFORM Complete ProQuest Central Global News & ABI/Inform Professional ABI/INFORM Professional Advanced ProQuest One Academic UKI Edition ABI/INFORM Professional Standard ProQuest Central Korea ProQuest DELNET Management Collection ProQuest One Academic ProQuest Central (New) ProQuest One Academic (New) |
DatabaseTitleList | Business Premium Collection |
Database_xml | – sequence: 1 dbid: BENPR name: ProQuest Central url: https://www.proquest.com/central sourceTypes: Aggregation Database |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Business |
EISSN | 1753-8386 |
EndPage | 787 |
ExternalDocumentID | 10_1108_IJMPB_03_2020_0087 10.1108/IJMPB-03-2020-0087 |
GeographicLocations | Angola |
GeographicLocations_xml | – name: Angola |
GroupedDBID | .WS 0R~ 29J 3FY 4.4 5GY 5VS 70U 7WY 8R4 8R5 9F- AADTA AADXL AAGMD AAMCF AAPBV AAPSD AAUDR ABIJV ABMQT ABSDC ACGFS ACMTK ADOMW AEBZA AEUCW AFKRA AFNZV AHSMT AJEBP ALMA_UNASSIGNED_HOLDINGS ASMFL ATGMP AUCOK AVELQ BENPR BEZIV BLEHN BPHCQ CS3 DWQXO EBS FNNZZ GEI GMX GQ. H13 HZ~ IPNFZ J1Y JL0 K6~ K8~ M0C M42 MS~ O9- P2P PQBIZ PQEST PQQKQ PQUKI PROAC Q2X RIG TDY TGG TMF V1G VP9 Z11 Z12 ZYZAG AAGBP AAKOT AARQV AAXBI AAYXX ABJNI ABYQI ACPVR ACTSA ADQHX ADWNT AFNTC AGTVX AHMHQ AILOG AODMV CCPQU CITATION PHGZM PHGZT 0U~ 1-H 7XB L.- L.0 PKEHL Q9U |
ID | FETCH-LOGICAL-c317t-a15361e588068577fb72a7eeed0c8ee70ec0b2c497133e5ec98d4f7e1cc3bc963 |
IEDL.DBID | BENPR |
ISSN | 1753-8378 |
IngestDate | Mon Jun 30 14:35:39 EDT 2025 Wed Jul 30 23:57:42 EDT 2025 Thu Apr 24 23:09:47 EDT 2025 Thu Feb 16 12:19:44 EST 2023 |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 3 |
Keywords | Angola Post-disaster reconstruction (PDR) Challenges Project management Public sector |
Language | English |
License | Licensed re-use rights only https://www.emerald.com/insight/site-policies |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c317t-a15361e588068577fb72a7eeed0c8ee70ec0b2c497133e5ec98d4f7e1cc3bc963 |
Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
ORCID | 0000-0002-1794-7255 |
PQID | 2534137775 |
PQPubID | 38494 |
PageCount | 21 |
ParticipantIDs | crossref_citationtrail_10_1108_IJMPB_03_2020_0087 emerald_primary_10_1108_IJMPB-03-2020-0087 crossref_primary_10_1108_IJMPB_03_2020_0087 proquest_journals_2534137775 |
PublicationCentury | 2000 |
PublicationDate | 2021-04-06 |
PublicationDateYYYYMMDD | 2021-04-06 |
PublicationDate_xml | – month: 04 year: 2021 text: 2021-04-06 day: 06 |
PublicationDecade | 2020 |
PublicationPlace | Bingley |
PublicationPlace_xml | – name: Bingley |
PublicationTitle | International journal of managing projects in business |
PublicationYear | 2021 |
Publisher | Emerald Publishing Limited Emerald Group Publishing Limited |
Publisher_xml | – name: Emerald Publishing Limited – name: Emerald Group Publishing Limited |
References | (key2022092113194371300_ref005) 2018; 7 (key2022092113194371300_ref014) 2007; 22 (key2022092113194371300_ref025) 2012; 3 UNDP (key2022092113194371300_ref056) 2009 (key2022092113194371300_ref046) 2020; ahead-of-print (key2022092113194371300_ref020) 2010 (key2022092113194371300_ref011) 2014; 21 (key2022092113194371300_ref051) 2012; 43 (key2022092113194371300_ref037) 2014 (key2022092113194371300_ref057) 2012 (key2022092113194371300_ref503) 2017; 35 (key2022092113194371300_ref053) 2012 (key2022092113194371300_ref035) 2012; 36 (key2022092113194371300_ref504) 2017; 12 PMI (key2022092113194371300_ref043) 2013 (key2022092113194371300_ref502) 2017 (key2022092113194371300_ref009) 2010; 38 (key2022092113194371300_ref010) 2011; 35 (key2022092113194371300_ref054) 2016 (key2022092113194371300_ref036) 2006; 15 (key2022092113194371300_fur2) 2013 (key2022092113194371300_ref030) 2006 (key2022092113194371300_ref021) 2012; 30 (key2022092113194371300_ref018) 2019; 10 (key2022092113194371300_fur9) 2007 (key2022092113194371300_ref015) 2002; 22 (key2022092113194371300_fur8) 2010 (key2022092113194371300_ref027) 2008; 16 UNDP (key2022092113194371300_fur10) 2007 (key2022092113194371300_ref024) 2010 (key2022092113194371300_ref008) 2007; 19 (key2022092113194371300_ref003) 2011 (key2022092113194371300_fur5) 2011 (key2022092113194371300_ref007) 2006 (key2022092113194371300_ref023) 2013 (key2022092113194371300_fur11) 2014 (key2022092113194371300_ref017) 2018; 25 (key2022092113194371300_ref013) 2017; 8 (key2022092113194371300_fur1) 2012 (key2022092113194371300_ref016) 2007; 32 (key2022092113194371300_ref028) 2013; 31 (key2022092113194371300_ref059) 2002 (key2022092113194371300_ref501) 2017 World Bank (key2022092113194371300_ref058) 2013 (key2022092113194371300_ref060) 2014; 42 (key2022092113194371300_ref031) 2016; 25 ADB (key2022092113194371300_ref001) 2011 (key2022092113194371300_ref041) 2005 (key2022092113194371300_ref006) 2019; 10 (key2022092113194371300_ref012) 2012 (key2022092113194371300_ref019) 2010; 1 (key2022092113194371300_ref022) 2014 (key2022092113194371300_ref042) 2007; IX (key2022092113194371300_ref047) 2019; 11 (key2022092113194371300_ref004) 2016; 20 (key2022092113194371300_ref039) 2013 (key2022092113194371300_ref045) 2009 (key2022092113194371300_ref038) 2007 (key2022092113194371300_ref040) 1978 (key2022092113194371300_ref061) 2009; 2 (key2022092113194371300_ref044) 2004; 22 key2022092113194371300_fur4 key2022092113194371300_fur6 (key2022092113194371300_ref050) 2008 (key2022092113194371300_ref002) 2011; 2 (key2022092113194371300_ref049) 2017; 17 (key2022092113194371300_ref052) 1999; 6 (key2022092113194371300_ref032) 2009; 37 (key2022092113194371300_fur3) 2018 (key2022092113194371300_ref048) 2014; 37 (key2022092113194371300_ref033) 2014; 7 (key2022092113194371300_ref055) 2018; 14 (key2022092113194371300_ref034) 2019; 26 (key2022092113194371300_ref029) 2009 (key2022092113194371300_ref026) 2010; 1 (key2022092113194371300_fur7) 1995; 38 |
References_xml | – start-page: 889 year: 2017 ident: key2022092113194371300_ref502 article-title: Inter-organizational disaster management projects: finding the middle way between trust and control – start-page: 46 year: 2017 ident: key2022092113194371300_ref501 article-title: Analysis of variance of the effects of a project’s location on key issues and challenges in post-disaster reconstruction projects doi: 10.3390/economies5040046 – volume: 17 start-page: 238 issue: 8 year: 2017 ident: key2022092113194371300_ref049 article-title: Research on management model of post-disaster reconstruction based on contingency Theory-taking the post-disaster reconstruction project in Lushan as an example publication-title: Journal of Scientific and Engineering Research – volume: 31 start-page: 147 issue: 1 year: 2013 ident: key2022092113194371300_ref028 article-title: Breaking the vicious cycle of flood disasters: goals of project management in post-disaster rebuild projects publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2012.03.001 – volume: 20 start-page: 265 year: 2016 ident: key2022092113194371300_ref004 article-title: An analysis of issues for the management of post-disaster housing reconstruction publication-title: International Journal of Strategic Property Management doi: 10.3846/1648715X.2016.1189975 – ident: key2022092113194371300_fur4 – volume: 35 start-page: 199 year: 2011 ident: key2022092113194371300_ref010 article-title: Donor-driven resource procurement for post-disaster reconstruction: constraints and actions publication-title: Habitat International doi: 10.1016/j.habitatint.2010.08.003 – start-page: 1 year: 2013 ident: key2022092113194371300_ref039 article-title: Effective time management in post-disaster reconstruction – volume: ahead-of-print issue: ahead-of-print year: 2020 ident: key2022092113194371300_ref046 article-title: Barriers and enablers of coastal disaster resilience – lessons learned from tsunami in Sri Lanka publication-title: International Journal of Disaster Resilience in the Built Environment doi: 10.1108/IJDRBE-07-2019-0050 – volume: 1 start-page: 173 year: 2010 ident: key2022092113194371300_ref026 article-title: Post-disaster housing reconstruction: comparative study of donor vs owner-driven approaches publication-title: International Journal of Disaster Resilience in the Built Environment doi: 10.1108/17595901011056631 – volume: 21 start-page: 291 issue: 3 year: 2014 ident: key2022092113194371300_ref011 article-title: Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry publication-title: Engineering, Construction and Architectural Management doi: 10.1108/ECAM-01-2013-0001 – volume: 7 start-page: 29 issue: 2 year: 2018 ident: key2022092113194371300_ref005 article-title: Practice framework for the management of post disaster housing reconstruction programmes publication-title: Sustainability Journal – volume: 32 start-page: 37 issue: 5 year: 2007 ident: key2022092113194371300_ref016 article-title: Allocation of post-disaster reconstruction financing to housing publication-title: Building Research and Information – volume-title: Building Resilience: Integrating Climate and Disaster Risk into Development year: 2013 ident: key2022092113194371300_ref058 – volume: 25 start-page: 685 issue: 5 year: 2016 ident: key2022092113194371300_ref031 article-title: Critical success factors for post-disaster infrastructure recovery: learning from the Canterbury (NZ) earthquake recovery publication-title: Disaster Prevention and Management doi: 10.1108/DPM-01-2016-0006 – volume: 15 start-page: 396 issue: 3 year: 2006 ident: key2022092113194371300_ref036 article-title: An integrated approach to natural disaster management: public project management and its critical success factors publication-title: Disaster Prevention and Management doi: 10.1108/09653560610669882 – volume: 10 start-page: 151 issue: 2/3 year: 2019 ident: key2022092113194371300_ref018 article-title: A framework for reconstruction of road infrastructure after a disaster publication-title: International Journal of Disaster Resilience in the Built Environment doi: 10.1108/IJDRBE-03-2017-0018 – volume: 35 start-page: 913 issue: 5 year: 2017 ident: key2022092113194371300_ref503 article-title: The role of community leadership in disaster recovery projects: Tsunami lessons from Japan publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2016.09.005 – volume-title: The Study on Paradigm Shift of Project Management Based on Complexity Science – project Management Innovations in Shanghai 2010 EXPO Construction Program year: 2009 ident: key2022092113194371300_ref045 – volume-title: Cheetah Project Management year: 2006 ident: key2022092113194371300_ref030 – volume-title: From Vision to Implementation: Enhancing the Recovery Process through Integrated Knowledge, Planning, and Project Management year: 2011 ident: key2022092113194371300_fur5 – volume: 22 start-page: 26 issue: 1 year: 2007 ident: key2022092113194371300_ref014 article-title: Lessons learned from the housing re-construction following the Bam earthquake in Iran publication-title: The Australian Journal of Emergency Management – volume: 1 start-page: 103 issue: 1 year: 2010 ident: key2022092113194371300_ref019 article-title: An examination of decision making in post disaster housing reconstruction publication-title: Journal of Disaster Resilience in the Built Environment doi: 10.1108/17595901011026508 – volume: 36 start-page: 11 issue: 1 year: 2012 ident: key2022092113194371300_ref035 article-title: Reconstruction of the Aceh Region following the 2004 Indian Ocean tsunami disaster: a transportation perspective publication-title: IATSS Research doi: 10.1016/j.iatssr.2012.07.001 – volume: 37 start-page: 308 issue: 3 year: 2014 ident: key2022092113194371300_ref048 article-title: Designing and using research questionnaires publication-title: Management Research Review doi: 10.1108/MRR-02-2013-0027 – volume: 11 issue: 3 year: 2019 ident: key2022092113194371300_ref047 article-title: Identification and categorization of policy and legal barriers to long-term timely post disaster reconstruction publication-title: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction – volume-title: Social Research Methods year: 2012 ident: key2022092113194371300_fur1 – volume: 19 start-page: 361 year: 2007 ident: key2022092113194371300_ref008 article-title: Housing microfinance in post-conflict Angola, Overcoming socioeconomic exclusion through land tenure and access to credit publication-title: Environment and Urbanization doi: 10.1177/0956247807082819 – volume: 7 start-page: 327 issue: 3 year: 2014 ident: key2022092113194371300_ref033 article-title: Re-conceptualising ‘Building Back Better’ to improve post disaster recovery publication-title: International Journal of Managing Projects in Business doi: 10.1108/IJMPB-10-2013-0054 – volume: 25 start-page: 113 issue: 1 year: 2018 ident: key2022092113194371300_ref017 article-title: Fcators affecting the accuracy of cost estimate: case of Jordan publication-title: Engineering, Construction and Architecural Management doi: 10.1108/ECAM-10-2016-0232 – start-page: 28 year: 2007 ident: key2022092113194371300_fur9 article-title: Critical success factors in project management globally and how they may be applied to aid projects – volume: 2 start-page: 148 issue: 2 year: 2011 ident: key2022092113194371300_ref002 article-title: An overview of post-disaster permanent housing reconstruction in developing countries publication-title: International Journal of Disaster Resilience in the Built Environment doi: 10.1108/17595901111149141 – volume: 8 start-page: 402 year: 2017 ident: key2022092113194371300_ref013 article-title: Factors influencing post-disaster reconstruction project management for housing provision in the Gaza Strip, Occupied Palestinian Territories publication-title: International Journal of Disaster Risk Science doi: 10.1007/s13753-017-0155-4 – volume: 30 start-page: 105 issue: 1 year: 2012 ident: key2022092113194371300_ref021 article-title: Critical success factors for World Bank projects: an empirical investigation publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2011.03.005 – volume: 26 start-page: 1962 issue: 9 year: 2019 ident: key2022092113194371300_ref034 article-title: Infrastructure procurement capacity gaps in Nigeria public sector institutions publication-title: Engineering, Construction and Architectural Management doi: 10.1108/ECAM-11-2017-0240 – volume: 10 start-page: 14 issue: 1 year: 2019 ident: key2022092113194371300_ref006 article-title: Exploring Indian post-disaster temporary housing strategy through a comparative review publication-title: International Journal of Disaster Resilience in the Built Environment doi: 10.1108/IJDRBE-09-2018-0037 – volume-title: Survey: Housing Projects Delayed for more than 10,000 Evacuees year: 2013 ident: key2022092113194371300_ref023 – volume: 12 start-page: 472 issue: 5 year: 2017 ident: key2022092113194371300_ref504 article-title: Improving the development, monitoring and reporting of stroke rehabilitation research: consensus-based core recommendations from the stroke recovery and rehabilitation roundtable publication-title: International Journal of Stroke doi: 10.1177/1747493017711815 – volume: 2 start-page: 386 year: 2009 ident: key2022092113194371300_ref061 article-title: A project management prospective in achieving a sustainable supply chain for timber procurement in Banda Aceh, Indonesia publication-title: International Journal of Managing Projects in Business – volume: 3 start-page: 220 issue: 3 year: 2012 ident: key2022092113194371300_ref025 article-title: The sense of place in the new homes of post-Bam earthquake reconstruction publication-title: International Journal of Disaster Resilience in the Built Environment doi: 10.1108/17595901211263611 – start-page: 292 year: 2012 ident: key2022092113194371300_ref053 article-title: Rebuilding housing after a disaster: factors for failure – volume-title: Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006 year: 2007 ident: key2022092113194371300_ref038 – start-page: 1269 year: 2010 ident: key2022092113194371300_ref020 article-title: A literature review of the role of project management in post-disaster reconstruction – volume-title: A Guide to the Project Management Body of Knowledge (PMBOK) year: 2013 ident: key2022092113194371300_ref043 – volume-title: Angola 2011-2015 Country Strategy Paper and 2010 Country Portfolio Performance Review year: 2011 ident: key2022092113194371300_ref001 – start-page: 4 volume-title: Haitians Still Homeless, “Suffering in Despair” 4 yrs after Quake – Amnesty year: 2014 ident: key2022092113194371300_ref037 – year: 2008 ident: key2022092113194371300_ref050 article-title: Houses or homes? The patterns of design – volume-title: Research Design: Qualitative, Quantitative, and Mixed Methods Approaches year: 2018 ident: key2022092113194371300_fur3 – volume-title: Research Methods for Business Students year: 2016 ident: key2022092113194371300_ref054 – volume: 42 start-page: 21 year: 2014 ident: key2022092113194371300_ref060 article-title: Research trends of post disaster reconstruction: the past and the future publication-title: Habitat International doi: 10.1016/j.habitatint.2013.10.005 – volume: 38 start-page: 41 issue: 2 year: 1995 ident: key2022092113194371300_fur7 article-title: Lessons for an accidental profession publication-title: Bus Horizons doi: 10.1016/0007-6813(95)90054-3 – ident: key2022092113194371300_fur6 – volume: 22 start-page: 152 issue: 2 year: 2002 ident: key2022092113194371300_ref015 article-title: Survey research in operations management: a process-based perspective publication-title: International Journal of Operations and Production Management doi: 10.1108/01443570210414310 – start-page: 120 year: 2014 ident: key2022092113194371300_ref022 article-title: Project management success for post-disaster reconstruction projects: international NGOs perspectives – volume: 38 start-page: 247 issue: 3 year: 2010 ident: key2022092113194371300_ref009 article-title: Resourcing challenges for post-disaster housing reconstruction: a comparative analysis publication-title: Building Research and Information doi: 10.1080/09613211003693945 – volume-title: SPSS Survival Manual: A Step by Step Guide to Data Analysis Using Version 12 year: 2005 ident: key2022092113194371300_ref041 – start-page: 1 year: 2002 ident: key2022092113194371300_ref059 article-title: Integrated relief and reconstruction management following A natural disaster. Second annual IIASA-DPRI meeting – start-page: 123 year: 2012 ident: key2022092113194371300_ref012 article-title: Building capability for disaster resilience – volume: 37 start-page: 385 issue: 2 year: 2009 ident: key2022092113194371300_ref032 article-title: Building back better: the large-scale impact of small-scale Approaches to reconstruction publication-title: World Development doi: 10.1016/j.worlddev.2008.01.006 – volume-title: Psychometric Theory year: 1978 ident: key2022092113194371300_ref040 – volume-title: Participatory Reconstruction Process at Work: Re-building Homes in Aceh and Nias, UN-habitat and UNDP Joint Programme in Aceh year: 2007 ident: key2022092113194371300_fur10 – volume: 43 start-page: 5 issue: 4 year: 2012 ident: key2022092113194371300_ref051 article-title: Project management trilogy challenges in Africa –where to from here? publication-title: Project Management Journal doi: 10.1002/pmj.21278 – start-page: 292 year: 2012 ident: key2022092113194371300_ref057 article-title: Rebuilding housing after a disaster: factors for failure – volume-title: Lessons from Aceh: Key Considerations in Post-disaster Reconstruction year: 2010 ident: key2022092113194371300_fur8 – start-page: 17 year: 2011 ident: key2022092113194371300_ref003 article-title: A project management approach to disaster response and recovery operations – volume: IX start-page: 1 issue: IX year: 2007 ident: key2022092113194371300_ref042 article-title: Project management for emergency response and disaster recovery – a call to arms! publication-title: PM World Today Journal – volume: 16 start-page: 25 issue: 1 year: 2008 ident: key2022092113194371300_ref027 article-title: The meaning of ‘build back better’: evidence from post-tsunami Aceh and Sri Lanka publication-title: Journal of Contingencies and Crisis Management – volume-title: Knowledge Transfer in Post-Disaster Reconstruction: The Problem of Post-Post-Disaster Reconstruction year: 2009 ident: key2022092113194371300_ref029 – volume-title: Safer Homes, Stronger Communities: A Handbook for Reconstructing after Natural Disasters year: 2010 ident: key2022092113194371300_ref024 – volume: 6 start-page: 335 issue: 4 year: 1999 ident: key2022092113194371300_ref052 article-title: Tracing the african project failure syndrome: the significance of ‘ubuntu’ publication-title: Engineering Construction and Architectural Management Journal – volume: 14 start-page: 52 issue: 1 year: 2018 ident: key2022092113194371300_ref055 article-title: Post-disaster reconstruction after 2015 gorkha earthquake: challenges and influencing factors publication-title: Journal of the Institute of Engineering doi: 10.3126/jie.v14i1.20068 – volume-title: Capacity Development: A UNDP Primer year: 2009 ident: key2022092113194371300_ref056 – volume: 22 start-page: 787e797 year: 2004 ident: key2022092113194371300_ref044 article-title: Analysing construction project coalition: exploring the application of social network analysis publication-title: Construction Management and Economics – volume-title: Qualitative Inquiry and Research Design: Choosing Among Five Approaches year: 2013 ident: key2022092113194371300_fur2 – volume-title: Case Study Research Design and Methods year: 2014 ident: key2022092113194371300_fur11 – year: 2006 ident: key2022092113194371300_ref007 article-title: Building A safer Aceh, reconstruction of houses, one year after the December 26, 2004 Tsunami |
SSID | ssj0069411 |
Score | 2.2814784 |
Snippet | PurposeDespite the extensive research on post-disaster reconstruction projects (PDRP), there is a paucity of studies that examine critical challenges for the... |
SourceID | proquest crossref emerald |
SourceType | Aggregation Database Enrichment Source Index Database Publisher |
StartPage | 767 |
SubjectTerms | Civil war Disasters Failure Flexibility International organizations Operations management Project management Public sector Strategic planning Success War |
SummonAdditionalLinks | – databaseName: Emerald Management eJournals dbid: ZYZAG link: http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LS8QwEB58gHjxLa4vcvCkxE3TpMl6W8UnKHtQUC-lTVNd1LrSevHXm0nbFUU8eW5aSDJ88-g33wDshCYItcgDaozOqMiYpNryiMpUMCucAxa-SezyKjq7ERe38nYCBm0vjKdV1uUYj9PDosQktYvEbYfCY8EBnF5zfnE5OEQ-EMccCMXVuliz7j5WL8-TMM2DiDk7n76_u--ftuiMfZs-CXNhOkUx9baR5tfvfXNWPzp2v1Dbu6KTeXhrN1EzUJ7236t033z80Hf8z10uwFwTt5J-bWiLMGGLJZhpafPLUAzqkg55GfNpiGkHtZTEhcZk9FpWNBuWCWozEJ-Jj9VrSVMRKsmwIP3iwSXcByQhtQg3Kf2vBTL6agxdgZuT4-ujM9rMcqDGRSgVTRyyRoGVDi4iLZXKU8UTZZ2HZkZbq5g1LOVG9DBpttKans5ErmxgTJgahxKrMFW8FnYNiFZZmjMtemEeiiTjCUtyrVwYKXNudaI7ELSXFptG6BznbTzHPuFhOvZHGrMwxiON8Ug7sDd-Z1TLfPy5ere5vd8Xf7utDmy25hI3-FDGXGL0oJSS638_3oBZjiwa5ApFmzDlrsVuuTCoSrcby_4EA5QBrA priority: 102 providerName: Emerald |
Title | Project management challenges for post-disaster reconstruction projects in Angola: a public sector perspective |
URI | https://www.emerald.com/insight/content/doi/10.1108/IJMPB-03-2020-0087/full/html https://www.proquest.com/docview/2534137775 |
Volume | 14 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV3NS8MwFA-6gXgRP3E6JQdPSliaJk3mRTbZnIONIQ7mLiVNUxloV-n-f0zadGMiO_XQ9PJe3u999L3fA-DOV54vaOIhpUSMaIwZEpoEiEUUa2ocMC2GxEbjYDClwxmbuYJb7toqK0wsgDpeKlsjbxFm8ZZzzp6yH2S3Rtm_q26Fxj6oGwgWogbq3d548lZhsZ3SLFIuE5QjS51ejc1g0XodjiZd201EbAZlqdm2XNOf-dwNRheOp38MjlzECDulik_Ank5PwUHVsH4G0klZTIHf604WqKoVKTk0QSnMlvkKxYtcWlYEWOTAa95Y6GoxOVyksJN-mlT3EUpY0l_DvCjqw2wzknkOpv3e-_MAuS0KSJnYYIWkwbTA08wYaiAY50nEieTa-EashNYca4UjomjbpquaadUWMU249pTyI2Xs8wLU0mWqLwEUPI4SLGjbT3wqYyKxTAQ3ARxLiBZSNIBXCTBUjmLcbrr4CotUA4uwEHqI_dAKPbRCb4CH9TdZSbCx8_S908v_h7f02QDNSnWhs8w83Nyjq92vr8Ehsf0rtksnaIKaUYu-MQHIKrp1t8w85x_zzssvGIXY6g |
linkProvider | ProQuest |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3fT9swED5BkQYvaD-YVmCbH8YLyMJx7NidNE2wgVqgVYVA4s1LHGdCgrQolRD_FH_jfEncCjTxxnOcPNxd7u47330H8C22UaxFEVFrdU5FziTVjidUZoI54QOwqIfEhqOkfylOruTVEjyGWRhsqww-sXbU-cRijXyfS_S3Sin5c3pHcWsU3q6GFRqNWZy6h3sP2aofg99evzucHx9d_OrTdqsAtT5Wzmjq__EkctIbbqKlUkWmeKqcjxXMaucUc5Zl3Ioewjcnne3pXBTKRdbGmfX26r-7DCsiThjvwMrh0Wh8Hnw_ToXWEM-DAIpU7WFMh-n9wclwfIjdSxwRG1LBPQmFz-aBFzGhDnTHb2G9zVDJQWNS72DJle_hTWiQ_wDluCnekNt55wyxYSVLRXwSTKaTakbz6ypFFgZSY-45Ty1paz8VuS7JQfnXQ-vvJCUN3Tap6ksEMl2MgG7A5avI9yN0yknpPgHRKs8KpkUvLmKR5jxlaaGVTxhlwZ1OdReiIEBjW0pz3KxxY2pow7SphW5YbFDoBoXehb35O9OG0OPF07utXv5_-Ik-u7AdVGdaT1CZhd1uvvz4K6z2L4Zn5mwwOt2CNY69M9ghlGxDx6vIffbJzyz70locgT-vbeT_ADBjFMo |
linkToPdf | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3dT9swED-xVkJ7mWADreNjftheNll1HDt2JyFEgYrCqCoEEm9e4jgIaUuLUgntX9tfN18St2KaeOM5Th7ufrm73_k-AD7FNoq1KCJqrc6pyJmk2vGEykwwJ7wDFnWT2OUkObsR57fydg3-hF4YLKsMNrE21PnMYo68zyXaW6WU7BdtWcT0ZHQ4f6C4QQpvWsM6jQYiF-73o6dv1cH4xOv6M-ej0-vjM9puGKDW-80FTf3_nkROehAnWipVZIqnynm_wax2TjFnWcatGCCVc9LZgc5FoVxkbZxZj13_3VfQVciKOtAdnk6mV8EPYIdoTfc8IaA4tj207DDdH59fTodYycSRveFYuCdu8Z_e4JV_qJ3eaAPetNEqOWrgtQlrrnwL66FY_h2U0yaRQ34tq2iIDetZKuIDYjKfVQua31cpTmQgNf9ezqwlbR6oIvclOSrvPM3-RlLSjN4mVX2hQOardtAtuHkR-W5Dp5yV7j0QrfKsYFoM4iIWac5TlhZa-eBRFtzpVPcgCgI0th1vjls2fpqa5jBtaqEbFhsUukGh9-Dr8p15M9zj2dNfWr38__ATffZgN6jOtFahMisMf3j-8UdY9-A238eTix14zbGMBouFkl3oeA25PR8HLbL9FnAEfrw0xv8C_CUY_w |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Project+management+challenges+for+post-disaster+reconstruction+projects+in+Angola%3A+a+public+sector+perspective&rft.jtitle=International+journal+of+managing+projects+in+business&rft.au=Nyamagere+Gladys+Sospeter&rft.au=Pantaleo+MD+Rwelamila&rft.au=Gimbi%2C+Joaqium&rft.date=2021-04-06&rft.pub=Emerald+Group+Publishing+Limited&rft.issn=1753-8378&rft.eissn=1753-8386&rft.volume=14&rft.issue=3&rft.spage=767&rft.epage=787&rft_id=info:doi/10.1108%2FIJMPB-03-2020-0087&rft.externalDBID=HAS_PDF_LINK |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1753-8378&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1753-8378&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1753-8378&client=summon |