Zhang, Y., & Yuan, J. (2019). A note on a two-agent scheduling problem related to the total weighted late work. Journal of combinatorial optimization, 37(3), 989-999. https://doi.org/10.1007/s10878-018-0337-z
Chicago Style (17th ed.) CitationZhang, Yuan, and Jinjiang Yuan. "A Note on a Two-agent Scheduling Problem Related to the Total Weighted Late Work." Journal of Combinatorial Optimization 37, no. 3 (2019): 989-999. https://doi.org/10.1007/s10878-018-0337-z.
MLA (9th ed.) CitationZhang, Yuan, and Jinjiang Yuan. "A Note on a Two-agent Scheduling Problem Related to the Total Weighted Late Work." Journal of Combinatorial Optimization, vol. 37, no. 3, 2019, pp. 989-999, https://doi.org/10.1007/s10878-018-0337-z.
Warning: These citations may not always be 100% accurate.