Structural equation modelling for subcontracting practice: Malaysia chapter

Purpose Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on th...

Full description

Saved in:
Bibliographic Details
Published inEngineering, construction, and architectural management Vol. 25; no. 7; pp. 835 - 860
Main Authors Lew, Yoke-Lian, Hassim, Salihudin, Muniandy, Ratnasamy, Hua, Law Teik
Format Journal Article
LanguageEnglish
Published Bradford Emerald Publishing Limited 10.08.2018
Emerald Group Publishing Limited
Subjects
Online AccessGet full text

Cover

Loading…
Abstract Purpose Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on the basis of that reason, the purpose of this paper is to link the gap between different phases of subcontracting practice. This study also attempts to explore the relationships between the key criteria used by general contractors in selecting subcontractors before job awarding (CSSC) and the key criteria used for monitoring subcontractors during construction work (CMSC); which will then include an investigation of the effects these criteria have on project performance (PP). Design/methodology/approach The data obtained from a total of 162 G7 contractors in Malaysia were analysed. The interrelationships between the criteria and the effects of these criteria on PP were investigated simultaneously by employing a single model based on structural equation modelling (SEM) method. Findings The final model has discovered four major criteria that are often considered during the selection of subcontractors namely, “communication”, “relationship”, “general obligation” and “resource management” of a subcontractor. Meanwhile, the major criteria that are referred to in the monitoring of subcontractors are “workmanship”, “awareness of environment, health and safety” and “communication and relationship”. The four CSSC were found to be interrelated among themselves and affected CMSC during the construction stage. The research also revealed that the criteria used in monitoring subcontractor do affect the performance of a project. Thus, based on the result of this investigation, the monitoring of subcontractor is essential in discerning the performance level of a project. Originality/value An established SEM improves a subcontracting practice by creating platforms for CSSC, CMSC and PP to influence each other. With the gap between selection and monitoring subcontractors are filled, then the prediction of the subcontractors’ performance can be made possible.
AbstractList PurposeMost of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on the basis of that reason, the purpose of this paper is to link the gap between different phases of subcontracting practice. This study also attempts to explore the relationships between the key criteria used by general contractors in selecting subcontractors before job awarding (CSSC) and the key criteria used for monitoring subcontractors during construction work (CMSC); which will then include an investigation of the effects these criteria have on project performance (PP).Design/methodology/approachThe data obtained from a total of 162 G7 contractors in Malaysia were analysed. The interrelationships between the criteria and the effects of these criteria on PP were investigated simultaneously by employing a single model based on structural equation modelling (SEM) method.FindingsThe final model has discovered four major criteria that are often considered during the selection of subcontractors namely, “communication”, “relationship”, “general obligation” and “resource management” of a subcontractor. Meanwhile, the major criteria that are referred to in the monitoring of subcontractors are “workmanship”, “awareness of environment, health and safety” and “communication and relationship”. The four CSSC were found to be interrelated among themselves and affected CMSC during the construction stage. The research also revealed that the criteria used in monitoring subcontractor do affect the performance of a project. Thus, based on the result of this investigation, the monitoring of subcontractor is essential in discerning the performance level of a project.Originality/valueAn established SEM improves a subcontracting practice by creating platforms for CSSC, CMSC and PP to influence each other. With the gap between selection and monitoring subcontractors are filled, then the prediction of the subcontractors’ performance can be made possible.
Purpose Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on the basis of that reason, the purpose of this paper is to link the gap between different phases of subcontracting practice. This study also attempts to explore the relationships between the key criteria used by general contractors in selecting subcontractors before job awarding (CSSC) and the key criteria used for monitoring subcontractors during construction work (CMSC); which will then include an investigation of the effects these criteria have on project performance (PP). Design/methodology/approach The data obtained from a total of 162 G7 contractors in Malaysia were analysed. The interrelationships between the criteria and the effects of these criteria on PP were investigated simultaneously by employing a single model based on structural equation modelling (SEM) method. Findings The final model has discovered four major criteria that are often considered during the selection of subcontractors namely, “communication”, “relationship”, “general obligation” and “resource management” of a subcontractor. Meanwhile, the major criteria that are referred to in the monitoring of subcontractors are “workmanship”, “awareness of environment, health and safety” and “communication and relationship”. The four CSSC were found to be interrelated among themselves and affected CMSC during the construction stage. The research also revealed that the criteria used in monitoring subcontractor do affect the performance of a project. Thus, based on the result of this investigation, the monitoring of subcontractor is essential in discerning the performance level of a project. Originality/value An established SEM improves a subcontracting practice by creating platforms for CSSC, CMSC and PP to influence each other. With the gap between selection and monitoring subcontractors are filled, then the prediction of the subcontractors’ performance can be made possible.
Author Muniandy, Ratnasamy
Hua, Law Teik
Hassim, Salihudin
Lew, Yoke-Lian
Author_xml – sequence: 1
  givenname: Yoke-Lian
  surname: Lew
  fullname: Lew, Yoke-Lian
  email: yoke7611@gmail.com
– sequence: 2
  givenname: Salihudin
  surname: Hassim
  fullname: Hassim, Salihudin
  email: hsalih@upm.edu.my
– sequence: 3
  givenname: Ratnasamy
  surname: Muniandy
  fullname: Muniandy, Ratnasamy
  email: ratnas@upm.edu.my
– sequence: 4
  givenname: Law Teik
  surname: Hua
  fullname: Hua, Law Teik
  email: lawteik@upm.edu.my
BookMark eNp9kT1PwzAQhi1UJNrCD2CLxGw4f8SJ2aqqfIhWDIDEZjmOA6nSuLWdof-epGUBISafrHvu9D43QaPWtRahSwLXhEB-s5jPVhg4pkAyDJCxEzQmTKSYMvo-QmOQQmIp8_wMTUJYA5Ccp2yMnl6i70zsvG4Su-t0rF2bbFxpm6ZuP5LK-SR0hXFt9NrE4Wt7KIy9TVa60ftQ68R86m20_hydVroJ9uL7naK3u8Xr_AEvn-8f57MlNozwiAutM0pByoKnWco1SbklwlbCSkp5XumqgLRimdTaCGDSyFJwInJeFiUwrtkUXR3nbr3bdTZEtXadb_uVikIuKKF9uL4rO3YZ70LwtlKmjod8fZS6UQTUYE4N5hRwNZhTg7meJL_Ira832u__ZeDI2I3tXZZ_Ij8OxL4AFeiBQQ
CitedBy_id crossref_primary_10_1080_01446193_2022_2110272
crossref_primary_10_1016_j_jobe_2021_103644
crossref_primary_10_1080_01446193_2022_2124528
crossref_primary_10_18400_tekderg_731728
crossref_primary_10_3390_buildings13051351
crossref_primary_10_1061__ASCE_ME_1943_5479_0000997
crossref_primary_10_1088_1755_1315_1067_1_012066
crossref_primary_10_1108_CI_05_2020_0087
crossref_primary_10_1108_ECAM_11_2019_0631
crossref_primary_10_1051_e3sconf_202340905003
crossref_primary_10_1108_ECAM_05_2019_0265
crossref_primary_10_3390_buildings11080375
Cites_doi 10.1061/(ASCE)0733-9364(2000)126:4(268)
10.1016/j.ssci.2015.10.016
10.1080/01446190701874405
10.1016/j.proeng.2015.10.081
10.1016/j.ijproman.2008.01.005
10.1016/j.buildenv.2003.09.009
10.3846/13923730.2013.801900
10.1061/(ASCE)0733-9364(2008)134:11(842)
10.1016/j.ijproman.2010.01.005
10.1016/j.ijproman.2010.03.003
10.1080/01446190903286564
10.1016/j.proeng.2015.10.036
10.1080/014461999371529
10.1016/0969-7012(94)90003-5
10.1080/01446190801918730
10.1080/01446193.2013.828843
10.1016/j.ijproman.2015.06.006
10.1016/S0263-7863(97)00007-0
10.1016/j.autcon.2006.09.005
10.1016/j.autcon.2008.02.015
10.1016/S0263-7863(98)00069-6
10.1108/JFMPC-04-2013-0009
10.1108/02630800510586907
10.1016/S0360-1323(99)00069-4
10.1016/j.ijproman.2007.08.002
10.1016/j.eswa.2009.01.032
10.1080/0144619042000301384
10.1016/j.ssci.2014.10.009
10.1080/15623599.2013.10773217
10.1016/j.autcon.2007.08.004
10.1108/eb021119
10.3846/13923730.2014.897983
10.1061/(ASCE)0733-9364(2007)133:3(262)
10.1061/(ASCE)0733-9364(2009)135:9(826)
10.1080/01446190010020390
10.1016/j.ijproman.2012.11.011
10.1080/0144619032000049656
ContentType Journal Article
Copyright Emerald Publishing Limited
Emerald Publishing Limited 2018
Copyright_xml – notice: Emerald Publishing Limited
– notice: Emerald Publishing Limited 2018
DBID AAYXX
CITATION
7TA
7WY
7WZ
7XB
8FD
8FE
8FG
ABJCF
AFKRA
AZQEC
BENPR
BEZIV
BGLVJ
CCPQU
DWQXO
FR3
F~G
GNUQQ
HCIFZ
JG9
K6~
KR7
L.-
L.0
L6V
M0C
M2P
M7S
PHGZM
PHGZT
PKEHL
PQBIZ
PQEST
PQGLB
PQQKQ
PQUKI
PRINS
PTHSS
Q9U
DOI 10.1108/ECAM-04-2017-0073
DatabaseName CrossRef
Materials Business File
ABI/INFORM Collection
ABI/INFORM Global (PDF only)
ProQuest Central (purchase pre-March 2016)
Technology Research Database
ProQuest SciTech Collection
ProQuest Technology Collection
Materials Science & Engineering Collection
ProQuest Central UK/Ireland
ProQuest Central Essentials
ProQuest Central
Business Premium Collection
Technology Collection
ProQuest One Community College
ProQuest Central Korea
Engineering Research Database
ABI/INFORM Global (Corporate)
ProQuest Central Student
SciTech Premium Collection
Materials Research Database
ProQuest Business Collection
Civil Engineering Abstracts
ABI/INFORM Professional Advanced
ABI/INFORM Professional Standard
ProQuest Engineering Collection
ABI/INFORM Global
Science Database
Engineering Database
ProQuest Central Premium
ProQuest One Academic (New)
ProQuest One Academic Middle East (New)
ProQuest One Business
ProQuest One Academic Eastern Edition (DO NOT USE)
ProQuest One Applied & Life Sciences
ProQuest One Academic
ProQuest One Academic UKI Edition
ProQuest Central China
Engineering Collection
ProQuest Central Basic
DatabaseTitle CrossRef
Materials Research Database
ABI/INFORM Global (Corporate)
ProQuest One Business
ProQuest Central Student
Technology Collection
Technology Research Database
ProQuest One Academic Middle East (New)
ProQuest Central Essentials
SciTech Premium Collection
ProQuest One Community College
ProQuest Central China
ABI/INFORM Complete
Materials Business File
ProQuest Central
ABI/INFORM Professional Advanced
ProQuest One Applied & Life Sciences
ProQuest Engineering Collection
ABI/INFORM Professional Standard
ProQuest Central Korea
ProQuest Central (New)
Engineering Collection
Business Premium Collection
Civil Engineering Abstracts
ABI/INFORM Global
Engineering Database
ProQuest Central Basic
ProQuest Science Journals
ProQuest One Academic Eastern Edition
ProQuest Technology Collection
ProQuest SciTech Collection
ProQuest Business Collection
ProQuest One Academic UKI Edition
Materials Science & Engineering Collection
Engineering Research Database
ProQuest One Academic
ProQuest One Academic (New)
DatabaseTitleList Materials Research Database

Database_xml – sequence: 1
  dbid: 8FG
  name: ProQuest Technology Collection
  url: https://search.proquest.com/technologycollection1
  sourceTypes: Aggregation Database
DeliveryMethod fulltext_linktorsrc
Discipline Economics
Engineering
EISSN 1365-232X
EndPage 860
ExternalDocumentID 10_1108_ECAM_04_2017_0073
10.1108/ECAM-04-2017-0073
GeographicLocations Malaysia
GeographicLocations_xml – name: Malaysia
GroupedDBID .WX
0R~
1OC
1WG
29G
3FY
3SW
4.4
5GY
5VS
70U
7WY
8FE
8FG
8R4
8R5
9E0
9F-
AADTA
AADXL
AAGBP
AAMCF
AAPBV
AAPSD
AAUDR
ABEAN
ABIJV
ABJCF
ABSDC
ACGFS
ACGOD
ACIWK
ACMTK
ADOMW
AEBZA
AEDOK
AEMMR
AETHF
AEUCW
AEUWZ
AFKRA
AFNZV
AFZLO
AHUOY
AIAFM
AJEBP
ALMA_UNASSIGNED_HOLDINGS
ASMFL
ATGMP
AUCOK
AVELQ
AZQEC
BENPR
BEZIV
BGLVJ
BHNDJ
BLEHN
BPHCQ
BUONS
CS3
DU5
DWQXO
EBS
EBU
ECCUG
EJD
FNNZZ
GEC
GEI
GMM
GMN
GMX
GNUQQ
GQ.
GROUPED_ABI_INFORM_COMPLETE
H13
HCIFZ
HZ~
IJT
IPNFZ
J1Y
JI-
JL0
K6~
KBGRL
L6V
L7B
M0C
M2P
M42
M7S
O9-
P2P
PQBIZ
PQEST
PQQKQ
PQUKI
PRINS
PROAC
PTHSS
Q2X
RIG
TEM
TET
TGG
TMD
TMF
TMK
TMT
UMP
V1G
Z11
Z12
Z21
ZYZAG
AAKOT
AAYXX
ABJNI
ABXQL
ABYQI
ADWNT
AFNTC
AHMHQ
AILOG
AKXVL
AODMV
CCPQU
CITATION
PHGZM
PHGZT
PQGLB
SCAQC
SDURG
7TA
7XB
8FD
FR3
JG9
KR7
L.-
L.0
PKEHL
Q9U
ID FETCH-LOGICAL-c314t-baa722099b45754a154e16ef6e92248fafb05f379aac6039c9d641684dbd034a3
IEDL.DBID BENPR
ISSN 0969-9988
IngestDate Sun Jul 13 04:03:15 EDT 2025
Thu Jul 31 00:16:06 EDT 2025
Thu Apr 24 23:03:31 EDT 2025
Mon Sep 12 19:12:19 EDT 2022
IsPeerReviewed true
IsScholarly true
Issue 7
Keywords Questionnaire survey
Construction
Management
Language English
License Licensed re-use rights only
https://www.emerald.com/insight/site-policies
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c314t-baa722099b45754a154e16ef6e92248fafb05f379aac6039c9d641684dbd034a3
Notes ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
PQID 2086212184
PQPubID 32462
PageCount 26
ParticipantIDs crossref_citationtrail_10_1108_ECAM_04_2017_0073
proquest_journals_2086212184
crossref_primary_10_1108_ECAM_04_2017_0073
emerald_primary_10_1108_ECAM-04-2017-0073
PublicationCentury 2000
PublicationDate 2018-08-10
PublicationDateYYYYMMDD 2018-08-10
PublicationDate_xml – month: 08
  year: 2018
  text: 2018-08-10
  day: 10
PublicationDecade 2010
PublicationPlace Bradford
PublicationPlace_xml – name: Bradford
PublicationTitle Engineering, construction, and architectural management
PublicationYear 2018
Publisher Emerald Publishing Limited
Emerald Group Publishing Limited
Publisher_xml – name: Emerald Publishing Limited
– name: Emerald Group Publishing Limited
References (key2021041413145868200_ref027) 2007; 16
(key2021041413145868200_ref030) 2009; 99
(key2021041413145868200_ref001) 2016; 22
(key2021041413145868200_ref025) 2005; 23
(key2021041413145868200_ref047) 2015; 22
(key2021041413145868200_ref501) 2016
(key2021041413145868200_ref059) 2000
(key2021041413145868200_ref055) 1993; 21
(key2021041413145868200_ref500) 2010; 29
(key2021041413145868200_ref003) 1998; 16
(key2021041413145868200_ref019) 2006
(key2021041413145868200_ref039) 1996
(key2021041413145868200_ref505) 2012; 19
(key2021041413145868200_ref020) 2009; 135
(key2021041413145868200_ref023) 2009; 4
(key2021041413145868200_ref041) 1998; 56
(key2021041413145868200_ref043) 2001; 36
(key2021041413145868200_ref034) 2008; 17
(key2021041413145868200_ref056) 1994
(key2021041413145868200_ref006) 1999; 17
(key2021041413145868200_ref053) 2013; 31
key2021041413145868200_ref012
(key2021041413145868200_ref048) 2015; 123
(key2021041413145868200_ref052) 2014; 20
(key2021041413145868200_ref022) 2005; 23
(key2021041413145868200_ref026) 2011
(key2021041413145868200_ref014) 1999; 6
key2021041413145868200_ref042
CIDB (key2021041413145868200_ref057) 2004
(key2021041413145868200_ref029) 2015; 33
(key2021041413145868200_ref018) 2012
(key2021041413145868200_ref021) 1994; 1
(key2021041413145868200_ref050) 2011; 29
(key2021041413145868200_ref040) 1999; 17
(key2021041413145868200_ref046) 2015; 122
(key2021041413145868200_ref015) 2007; 133
(key2021041413145868200_ref033) 2000; 126
(key2021041413145868200_ref017) 2008; 134
(key2021041413145868200_ref024) 2009; 1
(key2021041413145868200_ref051) 2004; 39
(key2021041413145868200_ref054) 2011; 29
(key2021041413145868200_ref004) 2008
(key2021041413145868200_ref011) 2009; 36
(key2021041413145868200_ref045) 2013; 13
(key2021041413145868200_ref502) 2008; 26
(key2021041413145868200_ref010) 1998; 22
(key2021041413145868200_ref016) 2003; 21
(key2021041413145868200_ref009) 2009; 27
(key2021041413145868200_ref036) 2008; 26
(key2021041413145868200_ref044) 2011
(key2021041413145868200_ref005) 2008; 17
(key2021041413145868200_ref049) 2014; 19
(key2021041413145868200_ref058) 2009; 27
(key2021041413145868200_ref007) 2016; 83
(key2021041413145868200_ref013) 2001; 19
(key2021041413145868200_ref032) 2008; 26
(key2021041413145868200_ref035) 2015; 20
(key2021041413145868200_ref028) 2015; 72
(key2021041413145868200_ref031) 2013; 31
(key2021041413145868200_ref037) 2003
BuildInfo (key2021041413145868200_ref008) 2010; 9
(key2021041413145868200_ref002) 2008; 1
References_xml – volume: 126
  start-page: 268
  issue: 4
  year: 2000
  ident: key2021041413145868200_ref033
  article-title: Structural equation model of construction contract dispute potential
  publication-title: Journal of Construction Engineering and Management
  doi: 10.1061/(ASCE)0733-9364(2000)126:4(268)
– volume: 83
  start-page: 1
  year: 2016
  ident: key2021041413145868200_ref007
  article-title: Construction safety practices and challenges in a Middle Eastern developing country
  publication-title: Safety Science
  doi: 10.1016/j.ssci.2015.10.016
– volume-title: Master Plan for Occupational Safety & Health in Construction Industry Year 2005–2010
  year: 2004
  ident: key2021041413145868200_ref057
– volume: 26
  start-page: 249
  issue: 3
  year: 2008
  ident: key2021041413145868200_ref502
  article-title: Delineating the predominant criteria for subcontractor appraisal and their latent relationships
  publication-title: Construction Management and Economics
  doi: 10.1080/01446190701874405
– volume: 123
  start-page: 432
  year: 2015
  ident: key2021041413145868200_ref048
  article-title: Subcontractor selection using genetic algorithm
  publication-title: Procedia Engineering
  doi: 10.1016/j.proeng.2015.10.081
– volume: 27
  start-page: 80
  issue: 1
  year: 2009
  ident: key2021041413145868200_ref009
  article-title: Subcontracting and its ramifications: a survey of the building industry in Hong Kong
  publication-title: International Journal of Project Management
  doi: 10.1016/j.ijproman.2008.01.005
– volume: 39
  start-page: 469
  issue: 4
  year: 2004
  ident: key2021041413145868200_ref051
  article-title: A decision model proposal for construction contractor selection in Turkey
  publication-title: Building and Environment
  doi: 10.1016/j.buildenv.2003.09.009
– volume: 99
  start-page: 1
  year: 2009
  ident: key2021041413145868200_ref030
  article-title: Subcontracting versus health and safety: an inverse relationship
  publication-title: Proceedings of CIB
– volume: 20
  start-page: 389
  issue: 3
  year: 2014
  ident: key2021041413145868200_ref052
  article-title: An improved approach to the subcontracting procurement process in a lean construction setting
  publication-title: Journal of Civil Engineering and Management
  doi: 10.3846/13923730.2013.801900
– volume-title: Project Management for Engineering and Construction
  year: 2000
  ident: key2021041413145868200_ref059
– ident: key2021041413145868200_ref042
– volume: 134
  start-page: 842
  issue: 11
  year: 2008
  ident: key2021041413145868200_ref017
  article-title: Subcontractor evaluation and management framework for strategic partnering
  publication-title: Journal of Construction Engineering and Management
  doi: 10.1061/(ASCE)0733-9364(2008)134:11(842)
– volume: 29
  start-page: 108
  issue: 1
  year: 2011
  ident: key2021041413145868200_ref050
  article-title: Impacts of multi-layer chain subcontracting on project management performance
  publication-title: International Journal of Project Management
  doi: 10.1016/j.ijproman.2010.01.005
– volume: 29
  start-page: 337
  issue: 3
  year: 2011
  ident: key2021041413145868200_ref054
  article-title: Future criteria for success of building projects in Malaysia
  publication-title: International Journal of Project Management
  doi: 10.1016/j.ijproman.2010.03.003
– volume: 27
  start-page: 1099
  issue: 11
  year: 2009
  ident: key2021041413145868200_ref058
  article-title: Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success
  publication-title: Construction Management and Economics
  doi: 10.1080/01446190903286564
– volume-title: Multivariate Data Analysis
  year: 2006
  ident: key2021041413145868200_ref019
– volume: 122
  start-page: 274
  year: 2015
  ident: key2021041413145868200_ref046
  article-title: Selection of subcontractors as the quality improvement tool in housing construction
  publication-title: Procedia Engineering
  doi: 10.1016/j.proeng.2015.10.036
– volume: 17
  start-page: 315
  issue: 3
  year: 1999
  ident: key2021041413145868200_ref040
  article-title: A model for subcontractor selection in refurbishment projects
  publication-title: Construction Management and Economics
  doi: 10.1080/014461999371529
– ident: key2021041413145868200_ref012
– volume: 1
  start-page: 139
  issue: 3
  year: 1994
  ident: key2021041413145868200_ref021
  article-title: Applying multi-attribute analysis to contractor selection decisions
  publication-title: European Journal of Purchasing and Supply Management
  doi: 10.1016/0969-7012(94)90003-5
– year: 1996
  ident: key2021041413145868200_ref039
  article-title: A knowledge based decision support and risk management system for the selection of sub-contractors for refurbishment projects
– volume: 1
  start-page: 76
  issue: 1
  year: 2008
  ident: key2021041413145868200_ref002
  article-title: Risk management assessment for partnering projects in the Malaysian construction industry
  publication-title: Journal of Politics & Law
– year: 2008
  ident: key2021041413145868200_ref004
  article-title: Logistics and supply chain in Malaysia: issues and challenges
– volume: 26
  start-page: 471
  issue: 5
  year: 2008
  ident: key2021041413145868200_ref032
  article-title: Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry
  publication-title: Construction Management and Economics
  doi: 10.1080/01446190801918730
– volume: 21
  start-page: 230
  issue: 2
  year: 1993
  ident: key2021041413145868200_ref055
  article-title: Alternative ways of assessing model fit
  publication-title: Sociological Methods & Research
– volume: 4
  issue: 9
  year: 2009
  ident: key2021041413145868200_ref023
  article-title: The operationalisation of safety culture for the Malaysian construction organisations
  publication-title: International Journal of Business and Management
– volume-title: SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS
  year: 2011
  ident: key2021041413145868200_ref044
– volume: 31
  start-page: 959
  issue: 9
  year: 2013
  ident: key2021041413145868200_ref053
  article-title: Critical success factors for Malaysian construction projects: an empirical assessment
  publication-title: Construction Management and Economics
  doi: 10.1080/01446193.2013.828843
– volume: 33
  start-page: 1495
  issue: 7
  year: 2015
  ident: key2021041413145868200_ref029
  article-title: Trust influencing factors in main contractor and subcontractor relationships during projects
  publication-title: International Journal of Project Management
  doi: 10.1016/j.ijproman.2015.06.006
– volume: 16
  start-page: 9
  issue: 1
  year: 1998
  ident: key2021041413145868200_ref003
  article-title: A neural network application to subcontractor rating in construction firms
  publication-title: International Journal of Project Management
  doi: 10.1016/S0263-7863(97)00007-0
– volume: 1
  start-page: 94
  issue: 4
  year: 2009
  ident: key2021041413145868200_ref024
  article-title: Partnering project success criteria in Malaysia
  publication-title: International Business Research
– year: 2003
  ident: key2021041413145868200_ref037
  article-title: Ten basic factors to identify suitable subcontractors for construction projects
– volume: 16
  start-page: 525
  issue: 4
  year: 2007
  ident: key2021041413145868200_ref027
  article-title: Evaluating sub-contractors performance using EFNIM
  publication-title: Automation in Construction
  doi: 10.1016/j.autcon.2006.09.005
– volume: 17
  start-page: 873
  issue: 7
  year: 2008
  ident: key2021041413145868200_ref034
  article-title: Modelling subcontractor registration decisions through case-based reasoning approach
  publication-title: Automation in Construction
  doi: 10.1016/j.autcon.2008.02.015
– volume: 17
  start-page: 337
  issue: 6
  year: 1999
  ident: key2021041413145868200_ref006
  article-title: Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
  publication-title: International Journal of Project Management
  doi: 10.1016/S0263-7863(98)00069-6
– volume: 19
  start-page: 55
  issue: 1
  year: 2014
  ident: key2021041413145868200_ref049
  article-title: Factors contributing to project time and hence cost overrun in the Malaysian construction industry
  publication-title: Journal of Financial Management of Property and Construction
  doi: 10.1108/JFMPC-04-2013-0009
– volume: 23
  start-page: 42
  issue: 1
  year: 2005
  ident: key2021041413145868200_ref025
  article-title: Factors affecting construction labour productivity for Malaysian residential projects
  publication-title: Structural Survey
  doi: 10.1108/02630800510586907
– volume-title: A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM)
  year: 2016
  ident: key2021041413145868200_ref501
– volume: 56
  start-page: 503
  year: 1998
  ident: key2021041413145868200_ref041
  article-title: Subcontract coordination in construction
  publication-title: International Journal of Production Economics
– volume: 36
  start-page: 73
  issue: 1
  year: 2001
  ident: key2021041413145868200_ref043
  article-title: Recent advances and proposed improvements in contractor prequalification methodologies
  publication-title: Building and Environment
  doi: 10.1016/S0360-1323(99)00069-4
– volume: 26
  start-page: 448
  issue: 4
  year: 2008
  ident: key2021041413145868200_ref036
  article-title: Delineating criteria for subcontractors registration considering divergence in skill base and scales
  publication-title: International Journal of Project Management
  doi: 10.1016/j.ijproman.2007.08.002
– volume-title: Structural Equation Modeling with EQS and EQS/Windows: Basic Concepts, Applications, and Programming
  year: 1994
  ident: key2021041413145868200_ref056
– volume: 36
  start-page: 10461
  issue: 7
  year: 2009
  ident: key2021041413145868200_ref011
  article-title: Effect of project characteristics on project performance in construction projects based on structural equation model
  publication-title: Expert Systems with Applications
  doi: 10.1016/j.eswa.2009.01.032
– volume-title: Handbook of Construction Management and Organization
  year: 2012
  ident: key2021041413145868200_ref018
– volume: 23
  start-page: 215
  issue: 2
  year: 2005
  ident: key2021041413145868200_ref022
  article-title: Structural equation model of project planning effectiveness
  publication-title: Construction Management and Economics
  doi: 10.1080/0144619042000301384
– volume: 72
  start-page: 363
  year: 2015
  ident: key2021041413145868200_ref028
  article-title: The examination of workers’ compensation for occupational fatalities in the construction industry
  publication-title: Safety Science
  doi: 10.1016/j.ssci.2014.10.009
– volume: 13
  start-page: 77
  issue: 3
  year: 2013
  ident: key2021041413145868200_ref045
  article-title: Evaluating document quality in construction projects–subcontractors’ perspective
  publication-title: International Journal of Construction Management
  doi: 10.1080/15623599.2013.10773217
– volume: 17
  start-page: 480
  issue: 4
  year: 2008
  ident: key2021041413145868200_ref005
  article-title: Improving subcontractor selection process in construction projects: Web-based subcontractor evaluation system (WEBSES)
  publication-title: Automation in Construction
  doi: 10.1016/j.autcon.2007.08.004
– volume: 19
  start-page: 543
  issue: 5
  year: 2012
  ident: key2021041413145868200_ref505
  article-title: Analysis of factors critical to construction project success in Malaysia
  publication-title: Engineering
– volume: 6
  start-page: 287
  issue: 3
  year: 1999
  ident: key2021041413145868200_ref014
  article-title: Evaluation of factors affecting time and cost performance in Hong Kong building projects
  publication-title: Engineering Construction and Architectural Management
  doi: 10.1108/eb021119
– volume: 22
  start-page: 346
  issue: 3
  year: 2016
  ident: key2021041413145868200_ref001
  article-title: A new approach for subcontractor selection in the construction industry based on portfolio theory
  publication-title: Journal of Civil Engineering and Management
  doi: 10.3846/13923730.2014.897983
– volume: 9
  start-page: 1
  issue: 12
  year: 2010
  ident: key2021041413145868200_ref008
  article-title: Contractors urged to employ model terms for subcontract work contracts
  publication-title: CIBD Malaysia
– volume: 133
  start-page: 262
  issue: 3
  year: 2007
  ident: key2021041413145868200_ref015
  article-title: Subcontractor schedule control method
  publication-title: Journal of Construction Engineering and Management
  doi: 10.1061/(ASCE)0733-9364(2007)133:3(262)
– volume: 22
  start-page: 1
  issue: 8
  year: 2015
  ident: key2021041413145868200_ref047
  article-title: Subcontractor selection using the integration of the AHP and PROMETHEE methods
  publication-title: Journal of Civil Engineering and Management
– volume: 20
  start-page: 149
  issue: 2
  year: 2015
  ident: key2021041413145868200_ref035
  article-title: Developing a framework for subcontractor appraisal using a balanced scorecard
  publication-title: Journal of Civil Engineering and Management
– volume: 135
  start-page: 826
  year: 2009
  ident: key2021041413145868200_ref020
  article-title: Relative importance of subcontractor selection criteria: evidence from Singapore
  publication-title: Journal of Construction Engineering and Management
  doi: 10.1061/(ASCE)0733-9364(2009)135:9(826)
– volume: 19
  start-page: 439
  issue: 4
  year: 2001
  ident: key2021041413145868200_ref013
  article-title: Subcontracting in commercial and residential construction: an empirical investigation
  publication-title: Construction Management and Economics
  doi: 10.1080/01446190010020390
– volume: 29
  start-page: 687
  issue: 6
  year: 2010
  ident: key2021041413145868200_ref500
  article-title: Structural equation model for assessing impacts of contractor’s performance on project success
  publication-title: International Journal of Project Management
– volume-title: Principles and Practice of Structural Equation Modeling
  year: 2011
  ident: key2021041413145868200_ref026
– volume: 31
  start-page: 1017
  issue: 7
  year: 2013
  ident: key2021041413145868200_ref031
  article-title: Mitigating the health and safety influence of subcontracting in construction: the approach of main contractors
  publication-title: International Journal of Project Management
  doi: 10.1016/j.ijproman.2012.11.011
– volume: 22
  start-page: vii
  issue: 1
  year: 1998
  ident: key2021041413145868200_ref010
  article-title: Issues and opinion on structural equation modeling
  publication-title: MIS Quarterly
– volume: 21
  start-page: 197
  issue: 2
  year: 2003
  ident: key2021041413145868200_ref016
  article-title: Accounting for rater credibility when evaluating AEC subcontractors
  publication-title: Construction Management and Economics
  doi: 10.1080/0144619032000049656
SSID ssj0018453
Score 2.228684
Snippet Purpose Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on...
PurposeMost of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on...
SourceID proquest
crossref
emerald
SourceType Aggregation Database
Enrichment Source
Index Database
Publisher
StartPage 835
SubjectTerms Communication
Construction
Construction industry
Contractors
Criteria
Estimates
General contractors
Investigations
Mathematical models
Modelling
Performance evaluation
Resource management
Structural equation modeling
Subcontracting
Subcontractors
SummonAdditionalLinks – databaseName: Emerald Management eJournals Collection
  dbid: ZYZAG
  link: http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LTwJBDG4QDurBB2pE0ezBiybAPobdHW-EgESDHpQEuWxmZmeDEREDXPz1tvtAIYST1300mWnT9ptpvwJcSU8qW3q6wjVdMxLckYJY97nyIhF5kV2nbuTuo9vpsft-vZ-Dp6wXJi6rTI5jYj_9Np4SSK1R4TZ64QXhAE2vaTUbXTrYt8nT0pVTjY6sa8PZx2gLCrblmn4eCoPXQeNucbHgs4SYkru8gkjDTy8614pbClUr_bq_PjsORO19mGRLSOpP3qvzmayq7xV2x39c4wHspUmr0Uis7BByelyE7ayneVqE3T-0hkfw8ByT0hKhh6G_Ei5xIx65Q73vBqbJxnQu4yJ5aqvAR1mv1q3RFSOBliMMNRQT1Pkx9Nqtl2ankg5tqCjHYjPUtPBs6seVDDNBJjBF05arI1dzzBZ81L8065HjcSGUazpc8dDFpNBnoQxNhwnnBPLjz7E-BUNapmCRhfLqGGuVJxAa8TAKHcw5EeVFJTAz_QQqZTSnwRqjIEY2ph_Q7gUmC2j3Atq9EtwsfpkkdB6bPr5O1bT22yW1lKCcmUWQeoEpSkK8aBGIPtv8-hx2UBJRhWNYLEMetaQvMNmZycvUgH8A0Jj3EQ
  priority: 102
  providerName: Emerald
Title Structural equation modelling for subcontracting practice: Malaysia chapter
URI https://www.emerald.com/insight/content/doi/10.1108/ECAM-04-2017-0073/full/html
https://www.proquest.com/docview/2086212184
Volume 25
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1LT8MwDLZgOwAHBAPEYEw9cAGpUh9Z23BBY9pDoE0ImDR2qZI0FYdpD3X8f-wu3RhCO1Vq0hzs1P4cx58BbmUolSdDbXNNaUYKd6Qg1n2uwlSkYeo1qBq5Pwh6Q_Y8aozMgVtmrlUWNjE31MlM0Rk5BumIvV0KSB7nC5u6RlF21bTQ2IcyjkUYfJWf2oPXt3UeIWIrHkoecBsDi8jkNan3TbvV7FNawCM7TQmrLc_0pzx3Y6Jzv9M5gWMDGK3mSsOnsKenFTgo6omzChz9ohQ8g5f3nBCWyDQsvVjxeFt5uxuqO7cQolrZt8wvqFNJA74q6qQerL6YCNSasNSXmKO8z2HYaX-0erZpmGAr32VLlLIIPaqFlQxRGBMIj7Qb6DTQHD11hLKXTiP1Qy6EChyfK54ECMgilsjE8ZnwL6A0nU31JVjSdQRLXVyvgX5OhQLDEp6kiY94DyOstApOIaxYGTZxamoxifOowolikm_ssJjkG5N8q3C__mS-otLYNfnOaODfuVuKq0Kt0FFs_sAs3uyXq93D13CIKxFNN7qkGpRQS_oGgcZS1mE_6nTrZk_hc_w5bnZ_AAgmz_A
linkProvider ProQuest
linkToHtml http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1LT8MwDLZgHAYHxFMMBuQAB5Aq9ZG1DRJCCDYGe1wY0m4hSVNxmLahgRB_it-I3QcvIW5c2zSKbCf2V8efAQ50pI2vI-sIS2lGgjtaEeu-MFGq0ij1G1SN3OuH7Tt-M2wM5-CtrIWha5XlmZgd1MnE0D9yBOkYe3sESM6mjw51jaLsatlCIzeLjn19Qcg2O72-RP0e-n6rObhoO0VXAccEHn_CpajIp4JRzTFU4QpjCOuFNg2tQHcW4wK120iDSChlQjcQRiQhRi0xT3TiBlwFOO88LPAgELSj4tbVR9Yi5jnrpQiFgzAmLrKo1GmneXHeoySET16B0mPf_OCPYuBPh5B5udYKLBfhKTvP7WkV5ux4Dapl9fJsDZa-EBiuQ-c2o58l6g5mH3PWcJY116Eqd4YBMZs96-w6PBVQ4KOyKuuE9dRIoY0oZh7UFLW7AXf_IshNqIwnY7sFTHuu4qmH8zXQq5pIIQgSSZoEGF0inktr4JbCkqbgLqcWGiOZYRg3liRf6XJJ8pUk3xocf3wyzYk7_hp8VGjg17HfFFeDeqkjWez3mfy0zu2_X-9DtT3odWX3ut_ZgUWclQjC0RnWoYIas7sY4jzpvcyuGNz_tyG_A0jDCD8
linkToPdf http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3JSsRAEC10BJeDuOK49kEPCsEsPUlaEHGZQR1nEBfw1nZ3uvEg48go4q_5dVZlcUO8ec3ShKpKql6q3yuAdZ1oE-rEesJSm5Hgjlakui9M4pRLXNggNnKnGx9f89Obxs0QvFVcGNpWWX0T8w919mDoHzmCdKy9AwIk267cFnF-1NrrP3o0QYo6rdU4jSJE2vb1BeHbYPfkCH29EYat5tXhsVdOGPBMFPAnfCyVhEQe1RzLFq6wnrBBbF1sBaa2FB9W-w0XJUIpE_uRMCKLsYJJeaYzP-IqwnWHYSRBVOTXYOSg2T2_-OhhpLzQwBSx8BDUpGVPlebuNA_3O9SSCClHULPsW1b8QQ3-TA95zmtNwWRZrLL9IrqmYcj2ZmCs4jIPZmDii5zhLLQvczFaEvJg9rHQEGf5qB3ivDMsj9ngWeeb44lOgYcqjtYO66h7hRGjmLlTffT1HFz_iynnodZ76NkFYDrwFXcBrtfAHGsShZBIZC6LsNZEdOfq4FfGkqZUMqeBGvcyRzR-Ksm-0ueS7CvJvnXY-rilX8h4_HXxZumBX6_95rg6LFc-kuXbP5Cfsbr49-k1GMUglmcn3fYSjOOipBaOmXEZaugwu4L1zpNeLQOLwe1_x_I7Oj8N0Q
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Structural+equation+modelling+for+subcontracting+practice%3A+Malaysia+chapter&rft.jtitle=Engineering%2C+construction%2C+and+architectural+management&rft.au=Yoke-Lian+Lew&rft.au=Hassim%2C+Salihudin&rft.au=Muniandy%2C+Ratnasamy&rft.au=Law+Teik+Hua&rft.date=2018-08-10&rft.pub=Emerald+Group+Publishing+Limited&rft.issn=0969-9988&rft.eissn=1365-232X&rft.volume=25&rft.issue=7&rft.spage=835&rft.epage=860&rft_id=info:doi/10.1108%2FECAM-04-2017-0073&rft.externalDBID=HAS_PDF_LINK
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0969-9988&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0969-9988&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0969-9988&client=summon