Structural equation modelling for subcontracting practice: Malaysia chapter
Purpose Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on th...
Saved in:
Published in | Engineering, construction, and architectural management Vol. 25; no. 7; pp. 835 - 860 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Bradford
Emerald Publishing Limited
10.08.2018
Emerald Group Publishing Limited |
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | Purpose
Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on the basis of that reason, the purpose of this paper is to link the gap between different phases of subcontracting practice. This study also attempts to explore the relationships between the key criteria used by general contractors in selecting subcontractors before job awarding (CSSC) and the key criteria used for monitoring subcontractors during construction work (CMSC); which will then include an investigation of the effects these criteria have on project performance (PP).
Design/methodology/approach
The data obtained from a total of 162 G7 contractors in Malaysia were analysed. The interrelationships between the criteria and the effects of these criteria on PP were investigated simultaneously by employing a single model based on structural equation modelling (SEM) method.
Findings
The final model has discovered four major criteria that are often considered during the selection of subcontractors namely, “communication”, “relationship”, “general obligation” and “resource management” of a subcontractor. Meanwhile, the major criteria that are referred to in the monitoring of subcontractors are “workmanship”, “awareness of environment, health and safety” and “communication and relationship”. The four CSSC were found to be interrelated among themselves and affected CMSC during the construction stage. The research also revealed that the criteria used in monitoring subcontractor do affect the performance of a project. Thus, based on the result of this investigation, the monitoring of subcontractor is essential in discerning the performance level of a project.
Originality/value
An established SEM improves a subcontracting practice by creating platforms for CSSC, CMSC and PP to influence each other. With the gap between selection and monitoring subcontractors are filled, then the prediction of the subcontractors’ performance can be made possible. |
---|---|
AbstractList | PurposeMost of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on the basis of that reason, the purpose of this paper is to link the gap between different phases of subcontracting practice. This study also attempts to explore the relationships between the key criteria used by general contractors in selecting subcontractors before job awarding (CSSC) and the key criteria used for monitoring subcontractors during construction work (CMSC); which will then include an investigation of the effects these criteria have on project performance (PP).Design/methodology/approachThe data obtained from a total of 162 G7 contractors in Malaysia were analysed. The interrelationships between the criteria and the effects of these criteria on PP were investigated simultaneously by employing a single model based on structural equation modelling (SEM) method.FindingsThe final model has discovered four major criteria that are often considered during the selection of subcontractors namely, “communication”, “relationship”, “general obligation” and “resource management” of a subcontractor. Meanwhile, the major criteria that are referred to in the monitoring of subcontractors are “workmanship”, “awareness of environment, health and safety” and “communication and relationship”. The four CSSC were found to be interrelated among themselves and affected CMSC during the construction stage. The research also revealed that the criteria used in monitoring subcontractor do affect the performance of a project. Thus, based on the result of this investigation, the monitoring of subcontractor is essential in discerning the performance level of a project.Originality/valueAn established SEM improves a subcontracting practice by creating platforms for CSSC, CMSC and PP to influence each other. With the gap between selection and monitoring subcontractors are filled, then the prediction of the subcontractors’ performance can be made possible. Purpose Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on registration, selection of subcontractors or on monitoring of subcontractors without much integration to other different phases involved. Thus, on the basis of that reason, the purpose of this paper is to link the gap between different phases of subcontracting practice. This study also attempts to explore the relationships between the key criteria used by general contractors in selecting subcontractors before job awarding (CSSC) and the key criteria used for monitoring subcontractors during construction work (CMSC); which will then include an investigation of the effects these criteria have on project performance (PP). Design/methodology/approach The data obtained from a total of 162 G7 contractors in Malaysia were analysed. The interrelationships between the criteria and the effects of these criteria on PP were investigated simultaneously by employing a single model based on structural equation modelling (SEM) method. Findings The final model has discovered four major criteria that are often considered during the selection of subcontractors namely, “communication”, “relationship”, “general obligation” and “resource management” of a subcontractor. Meanwhile, the major criteria that are referred to in the monitoring of subcontractors are “workmanship”, “awareness of environment, health and safety” and “communication and relationship”. The four CSSC were found to be interrelated among themselves and affected CMSC during the construction stage. The research also revealed that the criteria used in monitoring subcontractor do affect the performance of a project. Thus, based on the result of this investigation, the monitoring of subcontractor is essential in discerning the performance level of a project. Originality/value An established SEM improves a subcontracting practice by creating platforms for CSSC, CMSC and PP to influence each other. With the gap between selection and monitoring subcontractors are filled, then the prediction of the subcontractors’ performance can be made possible. |
Author | Muniandy, Ratnasamy Hua, Law Teik Hassim, Salihudin Lew, Yoke-Lian |
Author_xml | – sequence: 1 givenname: Yoke-Lian surname: Lew fullname: Lew, Yoke-Lian email: yoke7611@gmail.com – sequence: 2 givenname: Salihudin surname: Hassim fullname: Hassim, Salihudin email: hsalih@upm.edu.my – sequence: 3 givenname: Ratnasamy surname: Muniandy fullname: Muniandy, Ratnasamy email: ratnas@upm.edu.my – sequence: 4 givenname: Law Teik surname: Hua fullname: Hua, Law Teik email: lawteik@upm.edu.my |
BookMark | eNp9kT1PwzAQhi1UJNrCD2CLxGw4f8SJ2aqqfIhWDIDEZjmOA6nSuLWdof-epGUBISafrHvu9D43QaPWtRahSwLXhEB-s5jPVhg4pkAyDJCxEzQmTKSYMvo-QmOQQmIp8_wMTUJYA5Ccp2yMnl6i70zsvG4Su-t0rF2bbFxpm6ZuP5LK-SR0hXFt9NrE4Wt7KIy9TVa60ftQ68R86m20_hydVroJ9uL7naK3u8Xr_AEvn-8f57MlNozwiAutM0pByoKnWco1SbklwlbCSkp5XumqgLRimdTaCGDSyFJwInJeFiUwrtkUXR3nbr3bdTZEtXadb_uVikIuKKF9uL4rO3YZ70LwtlKmjod8fZS6UQTUYE4N5hRwNZhTg7meJL_Ira832u__ZeDI2I3tXZZ_Ij8OxL4AFeiBQQ |
CitedBy_id | crossref_primary_10_1080_01446193_2022_2110272 crossref_primary_10_1016_j_jobe_2021_103644 crossref_primary_10_1080_01446193_2022_2124528 crossref_primary_10_18400_tekderg_731728 crossref_primary_10_3390_buildings13051351 crossref_primary_10_1061__ASCE_ME_1943_5479_0000997 crossref_primary_10_1088_1755_1315_1067_1_012066 crossref_primary_10_1108_CI_05_2020_0087 crossref_primary_10_1108_ECAM_11_2019_0631 crossref_primary_10_1051_e3sconf_202340905003 crossref_primary_10_1108_ECAM_05_2019_0265 crossref_primary_10_3390_buildings11080375 |
Cites_doi | 10.1061/(ASCE)0733-9364(2000)126:4(268) 10.1016/j.ssci.2015.10.016 10.1080/01446190701874405 10.1016/j.proeng.2015.10.081 10.1016/j.ijproman.2008.01.005 10.1016/j.buildenv.2003.09.009 10.3846/13923730.2013.801900 10.1061/(ASCE)0733-9364(2008)134:11(842) 10.1016/j.ijproman.2010.01.005 10.1016/j.ijproman.2010.03.003 10.1080/01446190903286564 10.1016/j.proeng.2015.10.036 10.1080/014461999371529 10.1016/0969-7012(94)90003-5 10.1080/01446190801918730 10.1080/01446193.2013.828843 10.1016/j.ijproman.2015.06.006 10.1016/S0263-7863(97)00007-0 10.1016/j.autcon.2006.09.005 10.1016/j.autcon.2008.02.015 10.1016/S0263-7863(98)00069-6 10.1108/JFMPC-04-2013-0009 10.1108/02630800510586907 10.1016/S0360-1323(99)00069-4 10.1016/j.ijproman.2007.08.002 10.1016/j.eswa.2009.01.032 10.1080/0144619042000301384 10.1016/j.ssci.2014.10.009 10.1080/15623599.2013.10773217 10.1016/j.autcon.2007.08.004 10.1108/eb021119 10.3846/13923730.2014.897983 10.1061/(ASCE)0733-9364(2007)133:3(262) 10.1061/(ASCE)0733-9364(2009)135:9(826) 10.1080/01446190010020390 10.1016/j.ijproman.2012.11.011 10.1080/0144619032000049656 |
ContentType | Journal Article |
Copyright | Emerald Publishing Limited Emerald Publishing Limited 2018 |
Copyright_xml | – notice: Emerald Publishing Limited – notice: Emerald Publishing Limited 2018 |
DBID | AAYXX CITATION 7TA 7WY 7WZ 7XB 8FD 8FE 8FG ABJCF AFKRA AZQEC BENPR BEZIV BGLVJ CCPQU DWQXO FR3 F~G GNUQQ HCIFZ JG9 K6~ KR7 L.- L.0 L6V M0C M2P M7S PHGZM PHGZT PKEHL PQBIZ PQEST PQGLB PQQKQ PQUKI PRINS PTHSS Q9U |
DOI | 10.1108/ECAM-04-2017-0073 |
DatabaseName | CrossRef Materials Business File ABI/INFORM Collection ABI/INFORM Global (PDF only) ProQuest Central (purchase pre-March 2016) Technology Research Database ProQuest SciTech Collection ProQuest Technology Collection Materials Science & Engineering Collection ProQuest Central UK/Ireland ProQuest Central Essentials ProQuest Central Business Premium Collection Technology Collection ProQuest One Community College ProQuest Central Korea Engineering Research Database ABI/INFORM Global (Corporate) ProQuest Central Student SciTech Premium Collection Materials Research Database ProQuest Business Collection Civil Engineering Abstracts ABI/INFORM Professional Advanced ABI/INFORM Professional Standard ProQuest Engineering Collection ABI/INFORM Global Science Database Engineering Database ProQuest Central Premium ProQuest One Academic (New) ProQuest One Academic Middle East (New) ProQuest One Business ProQuest One Academic Eastern Edition (DO NOT USE) ProQuest One Applied & Life Sciences ProQuest One Academic ProQuest One Academic UKI Edition ProQuest Central China Engineering Collection ProQuest Central Basic |
DatabaseTitle | CrossRef Materials Research Database ABI/INFORM Global (Corporate) ProQuest One Business ProQuest Central Student Technology Collection Technology Research Database ProQuest One Academic Middle East (New) ProQuest Central Essentials SciTech Premium Collection ProQuest One Community College ProQuest Central China ABI/INFORM Complete Materials Business File ProQuest Central ABI/INFORM Professional Advanced ProQuest One Applied & Life Sciences ProQuest Engineering Collection ABI/INFORM Professional Standard ProQuest Central Korea ProQuest Central (New) Engineering Collection Business Premium Collection Civil Engineering Abstracts ABI/INFORM Global Engineering Database ProQuest Central Basic ProQuest Science Journals ProQuest One Academic Eastern Edition ProQuest Technology Collection ProQuest SciTech Collection ProQuest Business Collection ProQuest One Academic UKI Edition Materials Science & Engineering Collection Engineering Research Database ProQuest One Academic ProQuest One Academic (New) |
DatabaseTitleList | Materials Research Database |
Database_xml | – sequence: 1 dbid: 8FG name: ProQuest Technology Collection url: https://search.proquest.com/technologycollection1 sourceTypes: Aggregation Database |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Economics Engineering |
EISSN | 1365-232X |
EndPage | 860 |
ExternalDocumentID | 10_1108_ECAM_04_2017_0073 10.1108/ECAM-04-2017-0073 |
GeographicLocations | Malaysia |
GeographicLocations_xml | – name: Malaysia |
GroupedDBID | .WX 0R~ 1OC 1WG 29G 3FY 3SW 4.4 5GY 5VS 70U 7WY 8FE 8FG 8R4 8R5 9E0 9F- AADTA AADXL AAGBP AAMCF AAPBV AAPSD AAUDR ABEAN ABIJV ABJCF ABSDC ACGFS ACGOD ACIWK ACMTK ADOMW AEBZA AEDOK AEMMR AETHF AEUCW AEUWZ AFKRA AFNZV AFZLO AHUOY AIAFM AJEBP ALMA_UNASSIGNED_HOLDINGS ASMFL ATGMP AUCOK AVELQ AZQEC BENPR BEZIV BGLVJ BHNDJ BLEHN BPHCQ BUONS CS3 DU5 DWQXO EBS EBU ECCUG EJD FNNZZ GEC GEI GMM GMN GMX GNUQQ GQ. GROUPED_ABI_INFORM_COMPLETE H13 HCIFZ HZ~ IJT IPNFZ J1Y JI- JL0 K6~ KBGRL L6V L7B M0C M2P M42 M7S O9- P2P PQBIZ PQEST PQQKQ PQUKI PRINS PROAC PTHSS Q2X RIG TEM TET TGG TMD TMF TMK TMT UMP V1G Z11 Z12 Z21 ZYZAG AAKOT AAYXX ABJNI ABXQL ABYQI ADWNT AFNTC AHMHQ AILOG AKXVL AODMV CCPQU CITATION PHGZM PHGZT PQGLB SCAQC SDURG 7TA 7XB 8FD FR3 JG9 KR7 L.- L.0 PKEHL Q9U |
ID | FETCH-LOGICAL-c314t-baa722099b45754a154e16ef6e92248fafb05f379aac6039c9d641684dbd034a3 |
IEDL.DBID | BENPR |
ISSN | 0969-9988 |
IngestDate | Sun Jul 13 04:03:15 EDT 2025 Thu Jul 31 00:16:06 EDT 2025 Thu Apr 24 23:03:31 EDT 2025 Mon Sep 12 19:12:19 EDT 2022 |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 7 |
Keywords | Questionnaire survey Construction Management |
Language | English |
License | Licensed re-use rights only https://www.emerald.com/insight/site-policies |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c314t-baa722099b45754a154e16ef6e92248fafb05f379aac6039c9d641684dbd034a3 |
Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
PQID | 2086212184 |
PQPubID | 32462 |
PageCount | 26 |
ParticipantIDs | crossref_citationtrail_10_1108_ECAM_04_2017_0073 proquest_journals_2086212184 crossref_primary_10_1108_ECAM_04_2017_0073 emerald_primary_10_1108_ECAM-04-2017-0073 |
PublicationCentury | 2000 |
PublicationDate | 2018-08-10 |
PublicationDateYYYYMMDD | 2018-08-10 |
PublicationDate_xml | – month: 08 year: 2018 text: 2018-08-10 day: 10 |
PublicationDecade | 2010 |
PublicationPlace | Bradford |
PublicationPlace_xml | – name: Bradford |
PublicationTitle | Engineering, construction, and architectural management |
PublicationYear | 2018 |
Publisher | Emerald Publishing Limited Emerald Group Publishing Limited |
Publisher_xml | – name: Emerald Publishing Limited – name: Emerald Group Publishing Limited |
References | (key2021041413145868200_ref027) 2007; 16 (key2021041413145868200_ref030) 2009; 99 (key2021041413145868200_ref001) 2016; 22 (key2021041413145868200_ref025) 2005; 23 (key2021041413145868200_ref047) 2015; 22 (key2021041413145868200_ref501) 2016 (key2021041413145868200_ref059) 2000 (key2021041413145868200_ref055) 1993; 21 (key2021041413145868200_ref500) 2010; 29 (key2021041413145868200_ref003) 1998; 16 (key2021041413145868200_ref019) 2006 (key2021041413145868200_ref039) 1996 (key2021041413145868200_ref505) 2012; 19 (key2021041413145868200_ref020) 2009; 135 (key2021041413145868200_ref023) 2009; 4 (key2021041413145868200_ref041) 1998; 56 (key2021041413145868200_ref043) 2001; 36 (key2021041413145868200_ref034) 2008; 17 (key2021041413145868200_ref056) 1994 (key2021041413145868200_ref006) 1999; 17 (key2021041413145868200_ref053) 2013; 31 key2021041413145868200_ref012 (key2021041413145868200_ref048) 2015; 123 (key2021041413145868200_ref052) 2014; 20 (key2021041413145868200_ref022) 2005; 23 (key2021041413145868200_ref026) 2011 (key2021041413145868200_ref014) 1999; 6 key2021041413145868200_ref042 CIDB (key2021041413145868200_ref057) 2004 (key2021041413145868200_ref029) 2015; 33 (key2021041413145868200_ref018) 2012 (key2021041413145868200_ref021) 1994; 1 (key2021041413145868200_ref050) 2011; 29 (key2021041413145868200_ref040) 1999; 17 (key2021041413145868200_ref046) 2015; 122 (key2021041413145868200_ref015) 2007; 133 (key2021041413145868200_ref033) 2000; 126 (key2021041413145868200_ref017) 2008; 134 (key2021041413145868200_ref024) 2009; 1 (key2021041413145868200_ref051) 2004; 39 (key2021041413145868200_ref054) 2011; 29 (key2021041413145868200_ref004) 2008 (key2021041413145868200_ref011) 2009; 36 (key2021041413145868200_ref045) 2013; 13 (key2021041413145868200_ref502) 2008; 26 (key2021041413145868200_ref010) 1998; 22 (key2021041413145868200_ref016) 2003; 21 (key2021041413145868200_ref009) 2009; 27 (key2021041413145868200_ref036) 2008; 26 (key2021041413145868200_ref044) 2011 (key2021041413145868200_ref005) 2008; 17 (key2021041413145868200_ref049) 2014; 19 (key2021041413145868200_ref058) 2009; 27 (key2021041413145868200_ref007) 2016; 83 (key2021041413145868200_ref013) 2001; 19 (key2021041413145868200_ref032) 2008; 26 (key2021041413145868200_ref035) 2015; 20 (key2021041413145868200_ref028) 2015; 72 (key2021041413145868200_ref031) 2013; 31 (key2021041413145868200_ref037) 2003 BuildInfo (key2021041413145868200_ref008) 2010; 9 (key2021041413145868200_ref002) 2008; 1 |
References_xml | – volume: 126 start-page: 268 issue: 4 year: 2000 ident: key2021041413145868200_ref033 article-title: Structural equation model of construction contract dispute potential publication-title: Journal of Construction Engineering and Management doi: 10.1061/(ASCE)0733-9364(2000)126:4(268) – volume: 83 start-page: 1 year: 2016 ident: key2021041413145868200_ref007 article-title: Construction safety practices and challenges in a Middle Eastern developing country publication-title: Safety Science doi: 10.1016/j.ssci.2015.10.016 – volume-title: Master Plan for Occupational Safety & Health in Construction Industry Year 2005–2010 year: 2004 ident: key2021041413145868200_ref057 – volume: 26 start-page: 249 issue: 3 year: 2008 ident: key2021041413145868200_ref502 article-title: Delineating the predominant criteria for subcontractor appraisal and their latent relationships publication-title: Construction Management and Economics doi: 10.1080/01446190701874405 – volume: 123 start-page: 432 year: 2015 ident: key2021041413145868200_ref048 article-title: Subcontractor selection using genetic algorithm publication-title: Procedia Engineering doi: 10.1016/j.proeng.2015.10.081 – volume: 27 start-page: 80 issue: 1 year: 2009 ident: key2021041413145868200_ref009 article-title: Subcontracting and its ramifications: a survey of the building industry in Hong Kong publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2008.01.005 – volume: 39 start-page: 469 issue: 4 year: 2004 ident: key2021041413145868200_ref051 article-title: A decision model proposal for construction contractor selection in Turkey publication-title: Building and Environment doi: 10.1016/j.buildenv.2003.09.009 – volume: 99 start-page: 1 year: 2009 ident: key2021041413145868200_ref030 article-title: Subcontracting versus health and safety: an inverse relationship publication-title: Proceedings of CIB – volume: 20 start-page: 389 issue: 3 year: 2014 ident: key2021041413145868200_ref052 article-title: An improved approach to the subcontracting procurement process in a lean construction setting publication-title: Journal of Civil Engineering and Management doi: 10.3846/13923730.2013.801900 – volume-title: Project Management for Engineering and Construction year: 2000 ident: key2021041413145868200_ref059 – ident: key2021041413145868200_ref042 – volume: 134 start-page: 842 issue: 11 year: 2008 ident: key2021041413145868200_ref017 article-title: Subcontractor evaluation and management framework for strategic partnering publication-title: Journal of Construction Engineering and Management doi: 10.1061/(ASCE)0733-9364(2008)134:11(842) – volume: 29 start-page: 108 issue: 1 year: 2011 ident: key2021041413145868200_ref050 article-title: Impacts of multi-layer chain subcontracting on project management performance publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2010.01.005 – volume: 29 start-page: 337 issue: 3 year: 2011 ident: key2021041413145868200_ref054 article-title: Future criteria for success of building projects in Malaysia publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2010.03.003 – volume: 27 start-page: 1099 issue: 11 year: 2009 ident: key2021041413145868200_ref058 article-title: Relational partnerships: the importance of communication, trust and confidence and joint risk management in achieving project success publication-title: Construction Management and Economics doi: 10.1080/01446190903286564 – volume-title: Multivariate Data Analysis year: 2006 ident: key2021041413145868200_ref019 – volume: 122 start-page: 274 year: 2015 ident: key2021041413145868200_ref046 article-title: Selection of subcontractors as the quality improvement tool in housing construction publication-title: Procedia Engineering doi: 10.1016/j.proeng.2015.10.036 – volume: 17 start-page: 315 issue: 3 year: 1999 ident: key2021041413145868200_ref040 article-title: A model for subcontractor selection in refurbishment projects publication-title: Construction Management and Economics doi: 10.1080/014461999371529 – ident: key2021041413145868200_ref012 – volume: 1 start-page: 139 issue: 3 year: 1994 ident: key2021041413145868200_ref021 article-title: Applying multi-attribute analysis to contractor selection decisions publication-title: European Journal of Purchasing and Supply Management doi: 10.1016/0969-7012(94)90003-5 – year: 1996 ident: key2021041413145868200_ref039 article-title: A knowledge based decision support and risk management system for the selection of sub-contractors for refurbishment projects – volume: 1 start-page: 76 issue: 1 year: 2008 ident: key2021041413145868200_ref002 article-title: Risk management assessment for partnering projects in the Malaysian construction industry publication-title: Journal of Politics & Law – year: 2008 ident: key2021041413145868200_ref004 article-title: Logistics and supply chain in Malaysia: issues and challenges – volume: 26 start-page: 471 issue: 5 year: 2008 ident: key2021041413145868200_ref032 article-title: Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry publication-title: Construction Management and Economics doi: 10.1080/01446190801918730 – volume: 21 start-page: 230 issue: 2 year: 1993 ident: key2021041413145868200_ref055 article-title: Alternative ways of assessing model fit publication-title: Sociological Methods & Research – volume: 4 issue: 9 year: 2009 ident: key2021041413145868200_ref023 article-title: The operationalisation of safety culture for the Malaysian construction organisations publication-title: International Journal of Business and Management – volume-title: SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS year: 2011 ident: key2021041413145868200_ref044 – volume: 31 start-page: 959 issue: 9 year: 2013 ident: key2021041413145868200_ref053 article-title: Critical success factors for Malaysian construction projects: an empirical assessment publication-title: Construction Management and Economics doi: 10.1080/01446193.2013.828843 – volume: 33 start-page: 1495 issue: 7 year: 2015 ident: key2021041413145868200_ref029 article-title: Trust influencing factors in main contractor and subcontractor relationships during projects publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2015.06.006 – volume: 16 start-page: 9 issue: 1 year: 1998 ident: key2021041413145868200_ref003 article-title: A neural network application to subcontractor rating in construction firms publication-title: International Journal of Project Management doi: 10.1016/S0263-7863(97)00007-0 – volume: 1 start-page: 94 issue: 4 year: 2009 ident: key2021041413145868200_ref024 article-title: Partnering project success criteria in Malaysia publication-title: International Business Research – year: 2003 ident: key2021041413145868200_ref037 article-title: Ten basic factors to identify suitable subcontractors for construction projects – volume: 16 start-page: 525 issue: 4 year: 2007 ident: key2021041413145868200_ref027 article-title: Evaluating sub-contractors performance using EFNIM publication-title: Automation in Construction doi: 10.1016/j.autcon.2006.09.005 – volume: 17 start-page: 873 issue: 7 year: 2008 ident: key2021041413145868200_ref034 article-title: Modelling subcontractor registration decisions through case-based reasoning approach publication-title: Automation in Construction doi: 10.1016/j.autcon.2008.02.015 – volume: 17 start-page: 337 issue: 6 year: 1999 ident: key2021041413145868200_ref006 article-title: Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria publication-title: International Journal of Project Management doi: 10.1016/S0263-7863(98)00069-6 – volume: 19 start-page: 55 issue: 1 year: 2014 ident: key2021041413145868200_ref049 article-title: Factors contributing to project time and hence cost overrun in the Malaysian construction industry publication-title: Journal of Financial Management of Property and Construction doi: 10.1108/JFMPC-04-2013-0009 – volume: 23 start-page: 42 issue: 1 year: 2005 ident: key2021041413145868200_ref025 article-title: Factors affecting construction labour productivity for Malaysian residential projects publication-title: Structural Survey doi: 10.1108/02630800510586907 – volume-title: A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM) year: 2016 ident: key2021041413145868200_ref501 – volume: 56 start-page: 503 year: 1998 ident: key2021041413145868200_ref041 article-title: Subcontract coordination in construction publication-title: International Journal of Production Economics – volume: 36 start-page: 73 issue: 1 year: 2001 ident: key2021041413145868200_ref043 article-title: Recent advances and proposed improvements in contractor prequalification methodologies publication-title: Building and Environment doi: 10.1016/S0360-1323(99)00069-4 – volume: 26 start-page: 448 issue: 4 year: 2008 ident: key2021041413145868200_ref036 article-title: Delineating criteria for subcontractors registration considering divergence in skill base and scales publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2007.08.002 – volume-title: Structural Equation Modeling with EQS and EQS/Windows: Basic Concepts, Applications, and Programming year: 1994 ident: key2021041413145868200_ref056 – volume: 36 start-page: 10461 issue: 7 year: 2009 ident: key2021041413145868200_ref011 article-title: Effect of project characteristics on project performance in construction projects based on structural equation model publication-title: Expert Systems with Applications doi: 10.1016/j.eswa.2009.01.032 – volume-title: Handbook of Construction Management and Organization year: 2012 ident: key2021041413145868200_ref018 – volume: 23 start-page: 215 issue: 2 year: 2005 ident: key2021041413145868200_ref022 article-title: Structural equation model of project planning effectiveness publication-title: Construction Management and Economics doi: 10.1080/0144619042000301384 – volume: 72 start-page: 363 year: 2015 ident: key2021041413145868200_ref028 article-title: The examination of workers’ compensation for occupational fatalities in the construction industry publication-title: Safety Science doi: 10.1016/j.ssci.2014.10.009 – volume: 13 start-page: 77 issue: 3 year: 2013 ident: key2021041413145868200_ref045 article-title: Evaluating document quality in construction projects–subcontractors’ perspective publication-title: International Journal of Construction Management doi: 10.1080/15623599.2013.10773217 – volume: 17 start-page: 480 issue: 4 year: 2008 ident: key2021041413145868200_ref005 article-title: Improving subcontractor selection process in construction projects: Web-based subcontractor evaluation system (WEBSES) publication-title: Automation in Construction doi: 10.1016/j.autcon.2007.08.004 – volume: 19 start-page: 543 issue: 5 year: 2012 ident: key2021041413145868200_ref505 article-title: Analysis of factors critical to construction project success in Malaysia publication-title: Engineering – volume: 6 start-page: 287 issue: 3 year: 1999 ident: key2021041413145868200_ref014 article-title: Evaluation of factors affecting time and cost performance in Hong Kong building projects publication-title: Engineering Construction and Architectural Management doi: 10.1108/eb021119 – volume: 22 start-page: 346 issue: 3 year: 2016 ident: key2021041413145868200_ref001 article-title: A new approach for subcontractor selection in the construction industry based on portfolio theory publication-title: Journal of Civil Engineering and Management doi: 10.3846/13923730.2014.897983 – volume: 9 start-page: 1 issue: 12 year: 2010 ident: key2021041413145868200_ref008 article-title: Contractors urged to employ model terms for subcontract work contracts publication-title: CIBD Malaysia – volume: 133 start-page: 262 issue: 3 year: 2007 ident: key2021041413145868200_ref015 article-title: Subcontractor schedule control method publication-title: Journal of Construction Engineering and Management doi: 10.1061/(ASCE)0733-9364(2007)133:3(262) – volume: 22 start-page: 1 issue: 8 year: 2015 ident: key2021041413145868200_ref047 article-title: Subcontractor selection using the integration of the AHP and PROMETHEE methods publication-title: Journal of Civil Engineering and Management – volume: 20 start-page: 149 issue: 2 year: 2015 ident: key2021041413145868200_ref035 article-title: Developing a framework for subcontractor appraisal using a balanced scorecard publication-title: Journal of Civil Engineering and Management – volume: 135 start-page: 826 year: 2009 ident: key2021041413145868200_ref020 article-title: Relative importance of subcontractor selection criteria: evidence from Singapore publication-title: Journal of Construction Engineering and Management doi: 10.1061/(ASCE)0733-9364(2009)135:9(826) – volume: 19 start-page: 439 issue: 4 year: 2001 ident: key2021041413145868200_ref013 article-title: Subcontracting in commercial and residential construction: an empirical investigation publication-title: Construction Management and Economics doi: 10.1080/01446190010020390 – volume: 29 start-page: 687 issue: 6 year: 2010 ident: key2021041413145868200_ref500 article-title: Structural equation model for assessing impacts of contractor’s performance on project success publication-title: International Journal of Project Management – volume-title: Principles and Practice of Structural Equation Modeling year: 2011 ident: key2021041413145868200_ref026 – volume: 31 start-page: 1017 issue: 7 year: 2013 ident: key2021041413145868200_ref031 article-title: Mitigating the health and safety influence of subcontracting in construction: the approach of main contractors publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2012.11.011 – volume: 22 start-page: vii issue: 1 year: 1998 ident: key2021041413145868200_ref010 article-title: Issues and opinion on structural equation modeling publication-title: MIS Quarterly – volume: 21 start-page: 197 issue: 2 year: 2003 ident: key2021041413145868200_ref016 article-title: Accounting for rater credibility when evaluating AEC subcontractors publication-title: Construction Management and Economics doi: 10.1080/0144619032000049656 |
SSID | ssj0018453 |
Score | 2.228684 |
Snippet | Purpose
Most of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on... PurposeMost of the previous studies conducted on the subject of subcontractors often focussed on a single phase of subcontracting practice; either on... |
SourceID | proquest crossref emerald |
SourceType | Aggregation Database Enrichment Source Index Database Publisher |
StartPage | 835 |
SubjectTerms | Communication Construction Construction industry Contractors Criteria Estimates General contractors Investigations Mathematical models Modelling Performance evaluation Resource management Structural equation modeling Subcontracting Subcontractors |
SummonAdditionalLinks | – databaseName: Emerald Management eJournals Collection dbid: ZYZAG link: http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LTwJBDG4QDurBB2pE0ezBiybAPobdHW-EgESDHpQEuWxmZmeDEREDXPz1tvtAIYST1300mWnT9ptpvwJcSU8qW3q6wjVdMxLckYJY97nyIhF5kV2nbuTuo9vpsft-vZ-Dp6wXJi6rTI5jYj_9Np4SSK1R4TZ64QXhAE2vaTUbXTrYt8nT0pVTjY6sa8PZx2gLCrblmn4eCoPXQeNucbHgs4SYkru8gkjDTy8614pbClUr_bq_PjsORO19mGRLSOpP3qvzmayq7xV2x39c4wHspUmr0Uis7BByelyE7ayneVqE3T-0hkfw8ByT0hKhh6G_Ei5xIx65Q73vBqbJxnQu4yJ5aqvAR1mv1q3RFSOBliMMNRQT1Pkx9Nqtl2ankg5tqCjHYjPUtPBs6seVDDNBJjBF05arI1dzzBZ81L8065HjcSGUazpc8dDFpNBnoQxNhwnnBPLjz7E-BUNapmCRhfLqGGuVJxAa8TAKHcw5EeVFJTAz_QQqZTSnwRqjIEY2ph_Q7gUmC2j3Atq9EtwsfpkkdB6bPr5O1bT22yW1lKCcmUWQeoEpSkK8aBGIPtv8-hx2UBJRhWNYLEMetaQvMNmZycvUgH8A0Jj3EQ priority: 102 providerName: Emerald |
Title | Structural equation modelling for subcontracting practice: Malaysia chapter |
URI | https://www.emerald.com/insight/content/doi/10.1108/ECAM-04-2017-0073/full/html https://www.proquest.com/docview/2086212184 |
Volume | 25 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwfV1LT8MwDLZgOwAHBAPEYEw9cAGpUh9Z23BBY9pDoE0ImDR2qZI0FYdpD3X8f-wu3RhCO1Vq0hzs1P4cx58BbmUolSdDbXNNaUYKd6Qg1n2uwlSkYeo1qBq5Pwh6Q_Y8aozMgVtmrlUWNjE31MlM0Rk5BumIvV0KSB7nC5u6RlF21bTQ2IcyjkUYfJWf2oPXt3UeIWIrHkoecBsDi8jkNan3TbvV7FNawCM7TQmrLc_0pzx3Y6Jzv9M5gWMDGK3mSsOnsKenFTgo6omzChz9ohQ8g5f3nBCWyDQsvVjxeFt5uxuqO7cQolrZt8wvqFNJA74q6qQerL6YCNSasNSXmKO8z2HYaX-0erZpmGAr32VLlLIIPaqFlQxRGBMIj7Qb6DTQHD11hLKXTiP1Qy6EChyfK54ECMgilsjE8ZnwL6A0nU31JVjSdQRLXVyvgX5OhQLDEp6kiY94DyOstApOIaxYGTZxamoxifOowolikm_ssJjkG5N8q3C__mS-otLYNfnOaODfuVuKq0Kt0FFs_sAs3uyXq93D13CIKxFNN7qkGpRQS_oGgcZS1mE_6nTrZk_hc_w5bnZ_AAgmz_A |
linkProvider | ProQuest |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1LT8MwDLZgHAYHxFMMBuQAB5Aq9ZG1DRJCCDYGe1wY0m4hSVNxmLahgRB_it-I3QcvIW5c2zSKbCf2V8efAQ50pI2vI-sIS2lGgjtaEeu-MFGq0ij1G1SN3OuH7Tt-M2wM5-CtrIWha5XlmZgd1MnE0D9yBOkYe3sESM6mjw51jaLsatlCIzeLjn19Qcg2O72-RP0e-n6rObhoO0VXAccEHn_CpajIp4JRzTFU4QpjCOuFNg2tQHcW4wK120iDSChlQjcQRiQhRi0xT3TiBlwFOO88LPAgELSj4tbVR9Yi5jnrpQiFgzAmLrKo1GmneXHeoySET16B0mPf_OCPYuBPh5B5udYKLBfhKTvP7WkV5ux4Dapl9fJsDZa-EBiuQ-c2o58l6g5mH3PWcJY116Eqd4YBMZs96-w6PBVQ4KOyKuuE9dRIoY0oZh7UFLW7AXf_IshNqIwnY7sFTHuu4qmH8zXQq5pIIQgSSZoEGF0inktr4JbCkqbgLqcWGiOZYRg3liRf6XJJ8pUk3xocf3wyzYk7_hp8VGjg17HfFFeDeqkjWez3mfy0zu2_X-9DtT3odWX3ut_ZgUWclQjC0RnWoYIas7sY4jzpvcyuGNz_tyG_A0jDCD8 |
linkToPdf | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV3JSsRAEC10BJeDuOK49kEPCsEsPUlaEHGZQR1nEBfw1nZ3uvEg48go4q_5dVZlcUO8ec3ShKpKql6q3yuAdZ1oE-rEesJSm5Hgjlakui9M4pRLXNggNnKnGx9f89Obxs0QvFVcGNpWWX0T8w919mDoHzmCdKy9AwIk267cFnF-1NrrP3o0QYo6rdU4jSJE2vb1BeHbYPfkCH29EYat5tXhsVdOGPBMFPAnfCyVhEQe1RzLFq6wnrBBbF1sBaa2FB9W-w0XJUIpE_uRMCKLsYJJeaYzP-IqwnWHYSRBVOTXYOSg2T2_-OhhpLzQwBSx8BDUpGVPlebuNA_3O9SSCClHULPsW1b8QQ3-TA95zmtNwWRZrLL9IrqmYcj2ZmCs4jIPZmDii5zhLLQvczFaEvJg9rHQEGf5qB3ivDMsj9ngWeeb44lOgYcqjtYO66h7hRGjmLlTffT1HFz_iynnodZ76NkFYDrwFXcBrtfAHGsShZBIZC6LsNZEdOfq4FfGkqZUMqeBGvcyRzR-Ksm-0ueS7CvJvnXY-rilX8h4_HXxZumBX6_95rg6LFc-kuXbP5Cfsbr49-k1GMUglmcn3fYSjOOipBaOmXEZaugwu4L1zpNeLQOLwe1_x_I7Oj8N0Q |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Structural+equation+modelling+for+subcontracting+practice%3A+Malaysia+chapter&rft.jtitle=Engineering%2C+construction%2C+and+architectural+management&rft.au=Yoke-Lian+Lew&rft.au=Hassim%2C+Salihudin&rft.au=Muniandy%2C+Ratnasamy&rft.au=Law+Teik+Hua&rft.date=2018-08-10&rft.pub=Emerald+Group+Publishing+Limited&rft.issn=0969-9988&rft.eissn=1365-232X&rft.volume=25&rft.issue=7&rft.spage=835&rft.epage=860&rft_id=info:doi/10.1108%2FECAM-04-2017-0073&rft.externalDBID=HAS_PDF_LINK |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0969-9988&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0969-9988&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0969-9988&client=summon |