Integrated distribution network expansion planning incorporating distributed generation considering uncertainties, reliability, and operational conditions
•An integrated DNEP is proposed considering renewable and non-renewable DGs.•Reliability and operational considerations are regarded.•Uncertainties of wind energy, load demand, and energy price have been considered.•Possibility of islanding has been regarded in reliability evaluation.•Required condi...
Saved in:
Published in | International journal of electrical power & energy systems Vol. 73; pp. 56 - 70 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Elsevier Ltd
01.12.2015
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | •An integrated DNEP is proposed considering renewable and non-renewable DGs.•Reliability and operational considerations are regarded.•Uncertainties of wind energy, load demand, and energy price have been considered.•Possibility of islanding has been regarded in reliability evaluation.•Required conditions for safe islanding considering all the uncertainties have been checked out.
In this paper, an integrated methodology is proposed for distribution network expansion planning which considers most of the planning alternatives. The planning aims to determine the optimal reinforcement of existing medium voltage lines and high voltage/medium voltage substations, or installation of new ones to meet the load growth in the planning horizon subject to the technical and operational constraints. Also, to take the advantages of new technologies, the renewable and non-renewable distributed generations have been included in the problem as another alternative. The uncertainties related to renewable DGs, load demand, and energy price have been considered in the calculation of cost components. The load duration curve has been utilized for loads such that the results be more precise. The possibility of islanding and load transferring through the reserve feeders have been regarded in the problem to improve the reliability of the network. Also, the required condition for successful and safe operation of island considering all of uncertainty states have been checked out to accurately calculate the reliability. The genetic algorithm is employed to solve this integrated problem. Finally, the proposed method is applied to the 54-bus system and also a real large-scale distribution network, and the results are discussed. The results verify the effectiveness of the presented method. |
---|---|
AbstractList | •An integrated DNEP is proposed considering renewable and non-renewable DGs.•Reliability and operational considerations are regarded.•Uncertainties of wind energy, load demand, and energy price have been considered.•Possibility of islanding has been regarded in reliability evaluation.•Required conditions for safe islanding considering all the uncertainties have been checked out.
In this paper, an integrated methodology is proposed for distribution network expansion planning which considers most of the planning alternatives. The planning aims to determine the optimal reinforcement of existing medium voltage lines and high voltage/medium voltage substations, or installation of new ones to meet the load growth in the planning horizon subject to the technical and operational constraints. Also, to take the advantages of new technologies, the renewable and non-renewable distributed generations have been included in the problem as another alternative. The uncertainties related to renewable DGs, load demand, and energy price have been considered in the calculation of cost components. The load duration curve has been utilized for loads such that the results be more precise. The possibility of islanding and load transferring through the reserve feeders have been regarded in the problem to improve the reliability of the network. Also, the required condition for successful and safe operation of island considering all of uncertainty states have been checked out to accurately calculate the reliability. The genetic algorithm is employed to solve this integrated problem. Finally, the proposed method is applied to the 54-bus system and also a real large-scale distribution network, and the results are discussed. The results verify the effectiveness of the presented method. |
Author | Monsef, H. Lesani, H. Bagheri, A. |
Author_xml | – sequence: 1 givenname: A. surname: Bagheri fullname: Bagheri, A. – sequence: 2 givenname: H. surname: Monsef fullname: Monsef, H. email: hmonsef@ut.ac.ir – sequence: 3 givenname: H. surname: Lesani fullname: Lesani, H. |
BookMark | eNqFkEtOwzAQhi0EEm3hBixygCbYcV5lgYQqHpUqsenecuxJNSHYke0CvQqnJaEVCxawmofm-6X5puTUWAOEXDGaMMqK6zbBFnrwSUpZnlCeUEZPyIRV5SLmOStPyYSyLI1pwfJzMvW-pZSWiyydkM-VCbB1MoCONPrgsN4FtCYyEN6te4ngo5fGj5u-k8ag2UZolHW9HaBx-qGGhC0YGNfDtbIDpcGNJzujwAWJJiD4eeSgQ1ljh2E_j6TRke2PlOxGTuPY-wty1sjOw-Wxzsjm4X6zfIrXz4-r5d06VpwWIW4aXVRVkS2U0nWh8rJhvFJS1aquC5pCLrOKpyAhY6qqUl41CjKZLpqcQ6kLPiPZIVY5672DRvQOX6XbC0bFqFe04qBXjHoF5WLQO2A3vzCF4fuJ4CR2_8G3BxiGv94QnPAKYbCk0YEKQlv8O-ALZOOixA |
CitedBy_id | crossref_primary_10_1088_1757_899X_594_1_012016 crossref_primary_10_1109_JSYST_2017_2739640 crossref_primary_10_1007_s40313_020_00573_0 crossref_primary_10_1016_j_energy_2017_12_160 crossref_primary_10_1049_iet_gtd_2019_0698 crossref_primary_10_1002_2050_7038_13226 crossref_primary_10_1016_j_epsr_2021_107392 crossref_primary_10_1016_j_rser_2017_02_075 crossref_primary_10_1109_JSYST_2021_3089716 crossref_primary_10_1016_j_cie_2021_107900 crossref_primary_10_1016_j_egyr_2022_12_142 crossref_primary_10_1016_j_apenergy_2018_03_023 crossref_primary_10_1109_TIA_2020_2986980 crossref_primary_10_1016_j_energy_2022_123671 crossref_primary_10_1016_j_est_2019_04_024 crossref_primary_10_1016_j_ref_2024_100644 crossref_primary_10_1109_TPWRD_2022_3200869 crossref_primary_10_2174_2352096515666220506183107 crossref_primary_10_1049_iet_gtd_2018_0366 crossref_primary_10_1515_ijeeps_2015_0077 crossref_primary_10_1016_j_ijepes_2023_109043 crossref_primary_10_3390_en12244777 crossref_primary_10_1016_j_scs_2023_104787 crossref_primary_10_1002_2050_7038_12421 crossref_primary_10_1016_j_tej_2019_05_016 crossref_primary_10_1109_TSG_2020_2982129 crossref_primary_10_3390_su10124594 crossref_primary_10_1016_j_segan_2022_100897 crossref_primary_10_1016_j_egyr_2024_09_017 crossref_primary_10_1016_j_ijepes_2015_11_080 crossref_primary_10_1016_j_segan_2020_100372 crossref_primary_10_3390_electronics8121416 crossref_primary_10_1109_TSTE_2016_2598400 crossref_primary_10_35377_saucis_01_03_468380 crossref_primary_10_1016_j_ijepes_2022_108484 crossref_primary_10_1016_j_jclepro_2016_02_135 crossref_primary_10_3390_en81012147 crossref_primary_10_1016_j_aej_2021_09_063 crossref_primary_10_1016_j_ijepes_2023_109199 crossref_primary_10_3233_JIFS_169784 crossref_primary_10_1016_j_enconman_2015_08_055 crossref_primary_10_1049_iet_rpg_2019_1181 crossref_primary_10_1016_j_rser_2023_114062 crossref_primary_10_3390_en15062275 crossref_primary_10_1049_iet_rpg_2015_0461 crossref_primary_10_1016_j_rser_2019_01_050 crossref_primary_10_1016_j_ijepes_2018_10_002 crossref_primary_10_1109_TPWRS_2018_2823685 crossref_primary_10_1016_j_ijepes_2018_10_006 crossref_primary_10_1007_s00202_018_0748_y crossref_primary_10_1109_TSG_2016_2590425 crossref_primary_10_1155_2018_4790942 crossref_primary_10_1049_iet_gtd_2018_5037 crossref_primary_10_1109_ACCESS_2020_3042010 crossref_primary_10_1016_j_energy_2018_06_159 crossref_primary_10_1016_j_ijepes_2017_05_018 crossref_primary_10_1016_j_ijepes_2022_108177 crossref_primary_10_1016_j_ijepes_2018_01_013 crossref_primary_10_1016_j_apenergy_2025_125281 crossref_primary_10_3390_en13236189 crossref_primary_10_1016_j_ijepes_2018_12_027 crossref_primary_10_1016_j_ijepes_2021_107911 crossref_primary_10_1016_j_ijepes_2019_03_026 crossref_primary_10_1016_j_apenergy_2022_119438 crossref_primary_10_1016_j_est_2021_103092 crossref_primary_10_1049_iet_esi_2019_0013 crossref_primary_10_1155_2022_2267926 crossref_primary_10_1109_TPWRS_2017_2672798 crossref_primary_10_1109_TSG_2016_2533421 crossref_primary_10_1109_TSTE_2017_2680462 crossref_primary_10_1007_s13198_020_00969_w crossref_primary_10_3390_en10111715 crossref_primary_10_1002_cjce_22475 crossref_primary_10_3390_en15010118 crossref_primary_10_1007_s00202_020_01079_3 crossref_primary_10_1016_j_epsr_2017_12_032 crossref_primary_10_1007_s12667_023_00572_5 |
Cites_doi | 10.1109/TPWRS.2004.831699 10.1109/TPWRS.2006.881158 10.1016/j.ijepes.2011.06.031 10.1016/j.ijepes.2014.04.048 10.1109/TSMCC.2008.2001573 10.1016/j.ijepes.2005.11.016 10.1109/39.975662 10.1109/TPWRD.2011.2176964 10.1049/iet-gtd.2009.0019 10.1109/TPWRS.2008.2002178 10.1109/TPWRS.2005.846212 10.1049/iet-gtd:20070046 10.1109/TPWRS.2005.846114 10.1109/TPWRS.2006.876649 10.1049/iet-rpg.2011.0028 10.1109/TPWRS.2012.2213309 10.1016/S0142-0615(98)00059-3 10.1109/MPE.2008.931492 10.1109/TPWRS.2005.846219 10.1049/iet-rpg.2009.0011 10.1109/TPWRS.2004.840442 10.1109/TPWRS.2003.818738 10.1109/59.192932 10.1109/TPWRS.2012.2211626 10.1109/TPWRS.2005.846067 10.1049/iet-gtd.2011.0173 10.1109/TPWRS.2002.804998 10.1016/j.ijepes.2013.03.041 10.1016/j.apenergy.2012.07.010 10.1109/TPWRS.2011.2180933 10.1016/j.enconman.2010.06.003 10.1142/S0218126610005962 10.1016/j.epsr.2008.12.007 10.1109/TPWRS.2012.2230652 10.1109/MPE.2007.906304 10.1109/TPWRS.2009.2030276 10.1109/TPWRS.2011.2161349 10.1016/j.ijepes.2006.02.003 10.1016/j.ijepes.2012.11.029 10.1109/TPWRS.2006.873131 |
ContentType | Journal Article |
Copyright | 2015 |
Copyright_xml | – notice: 2015 |
DBID | AAYXX CITATION |
DOI | 10.1016/j.ijepes.2015.03.010 |
DatabaseName | CrossRef |
DatabaseTitle | CrossRef |
DatabaseTitleList | |
DeliveryMethod | fulltext_linktorsrc |
Discipline | Engineering |
EISSN | 1879-3517 |
EndPage | 70 |
ExternalDocumentID | 10_1016_j_ijepes_2015_03_010 S0142061515001453 |
GroupedDBID | --K --M .~1 0R~ 0SF 1B1 1~. 1~5 29J 4.4 457 4G. 5GY 5VS 7-5 71M 8P~ 9JN AACTN AAEDT AAEDW AAHCO AAIAV AAIKJ AAKOC AALRI AAOAW AAQFI AAQXK AARJD AAXUO AAYFN ABBOA ABFNM ABJNI ABMAC ABTAH ABXDB ABYKQ ACDAQ ACGFS ACNNM ACRLP ACZNC ADBBV ADEZE ADJOM ADMUD ADTZH AEBSH AECPX AEKER AENEX AFKWA AFTJW AGHFR AGUBO AGYEJ AHHHB AHIDL AHJVU AHZHX AI. AIALX AIEXJ AIKHN AITUG AJBFU AJOXV ALMA_UNASSIGNED_HOLDINGS AMFUW AMRAJ AOUOD ASPBG AVWKF AXJTR AZFZN BELTK BJAXD BKOJK BLXMC CS3 DU5 EBS EFJIC EFLBG EJD EO8 EO9 EP2 EP3 FDB FEDTE FGOYB FIRID FNPLU FYGXN G-2 G-Q GBLVA GBOLZ HVGLF HZ~ IHE J1W JARJE JJJVA K-O KOM LY6 LY7 M41 MO0 O-L O9- OAUVE OZT P-8 P-9 P2P PC. Q38 R2- RIG ROL RPZ SAC SDF SDG SDP SES SET SEW SPC SPCBC SSR SST SSV SSZ T5K VH1 WUQ ZMT ZY4 ~02 ~G- AATTM AAXKI AAYWO AAYXX ABWVN ACRPL ACVFH ADCNI ADNMO ADVLN AEIPS AEUPX AFJKZ AFPUW AFXIZ AGCQF AGQPQ AGRNS AIGII AIIUN AKBMS AKRWK AKYEP ANKPU APXCP BNPGV CITATION GROUPED_DOAJ SSH |
ID | FETCH-LOGICAL-c306t-ffd688649ccdb6c57f138cacbcbb602e5a4832eae41c88238fce4a29f53e7d63 |
IEDL.DBID | .~1 |
ISSN | 0142-0615 |
IngestDate | Thu Apr 24 22:59:15 EDT 2025 Tue Jul 01 03:58:59 EDT 2025 Fri Feb 23 02:46:34 EST 2024 |
IsPeerReviewed | true |
IsScholarly | true |
Keywords | Uncertainty Distributed generation Operational conditions Reliability Integrated expansion planning Distribution network |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c306t-ffd688649ccdb6c57f138cacbcbb602e5a4832eae41c88238fce4a29f53e7d63 |
PageCount | 15 |
ParticipantIDs | crossref_primary_10_1016_j_ijepes_2015_03_010 crossref_citationtrail_10_1016_j_ijepes_2015_03_010 elsevier_sciencedirect_doi_10_1016_j_ijepes_2015_03_010 |
ProviderPackageCode | CITATION AAYXX |
PublicationCentury | 2000 |
PublicationDate | December 2015 2015-12-00 |
PublicationDateYYYYMMDD | 2015-12-01 |
PublicationDate_xml | – month: 12 year: 2015 text: December 2015 |
PublicationDecade | 2010 |
PublicationTitle | International journal of electrical power & energy systems |
PublicationYear | 2015 |
Publisher | Elsevier Ltd |
Publisher_xml | – name: Elsevier Ltd |
References | Haghifam, Falaghi, Malik (b0195) 2008; 2 El-Khattam, Bhattacharya, Hegazy, Salama (b0040) 2004; 19 Pregelj, Begovic, Rohatgi (b0050) 2006; 21 El-Khattam, Hegazy, Salama (b0005) 2005; 20 Mendez, Rivier, de la Fuente, Gomez, Arceluz, Marin (b0060) 2006; 28 Borges, Falcao (b0080) 2006; 28 Shayeghi, Mahdavi, Kazemi, Shayanfar (b0215) 2010; 51 Shirmohammadi, Hong, Semlyen, Luo (b0200) 1988; 3 Greatbanks JA, Popovic DH, Begovic M, Pregelj A, Green TC. On optimization for security and reliability of power systems with distributed generation. In: Proc. 2003 IEEE power tech conf., vol. 1. Jabr, Pal (b0075) 2009; 3 Wang, Singh (b0085) 2008; 38 Lavorato, Franco, Rider, Romero (b0165) 2012; 27 Delbem, de Carvalho, Bretas (b0175) 2005; 20 Willis (b0015) 2004 Gil, Joos (b0055) 2006; 21 Ramos, Exposito, Santos, Iborra (b0185) 2005; 20 Celli, Ghiani, Mocci, Pilo (b0135) 2005; 20 Thresher, Robinson, Veers (b0095) 2007; 5 El-Khattam, Hegazy, Salama (b0110) 2006; 25 Bae, Kim, Kim, Singh (b0140) 2004; 19 Jabr (b0030) 2013; 28 Soroudi, Caire, Hadjsaid, Ehsan (b0125) 2011; 5 Ault, Foote, McDonald (b0020) 2002; 22 Franco, Rider, Romero (b0035) 2014; 62 Gitizadeh, Vahed, Aghaei (b0150) 2013; 101 Hong, Ho (b0190) 2005; 20 Sorudi (b0120) 2012; 27 Gen, Cheng (b0205) 1997 Smith, Thresher, Zavadil, DeMeo, Piwko, Ernst (b0100) 2009; 7 Shayeghi, Bagheri (b0160) 2013; 48 Arora (b0210) 2012 Carreño, Romero, Padilha-Feltrin (b0180) 2008; 23 Gozel, Hocaoglu (b0070) 2009; 79 Atwa, El-Saadany, Salama, Seethapathy (b0105) 2010; 25 Attwa, El-Saadany (b0115) 2011; 5 Farrag, El-Metwally, El-Bages (b0010) 1999; 21 Shaaban, Attwa, El-Saadnay (b0025) 2013; 28 Sedghi, Golkar, Haghifam (b0155) 2013; 52 Miguez, Cidras, Diaz-Dorado, Garcia-Dornelas (b0170) 2002; 17 Falaghi, Singh, Haghifam, Ramezani (b0145) 2011; 33 Soroudi, Afrasiab (b0130) 2012; 6 Ziari, Ledwich, Ghosh, Platt (b0090) 2012; 27 Ziari, Ledvich, Ghosh, Platt (b0065) 2013; 28 Najafi Ravandagh (b0225) 2010; 19 10.1016/j.ijepes.2015.03.010_b0045 Gil (10.1016/j.ijepes.2015.03.010_b0055) 2006; 21 Shayeghi (10.1016/j.ijepes.2015.03.010_b0215) 2010; 51 Gen (10.1016/j.ijepes.2015.03.010_b0205) 1997 Arora (10.1016/j.ijepes.2015.03.010_b0210) 2012 El-Khattam (10.1016/j.ijepes.2015.03.010_b0005) 2005; 20 Attwa (10.1016/j.ijepes.2015.03.010_b0115) 2011; 5 Haghifam (10.1016/j.ijepes.2015.03.010_b0195) 2008; 2 Najafi Ravandagh (10.1016/j.ijepes.2015.03.010_b0225) 2010; 19 El-Khattam (10.1016/j.ijepes.2015.03.010_b0110) 2006; 25 Gozel (10.1016/j.ijepes.2015.03.010_b0070) 2009; 79 Ault (10.1016/j.ijepes.2015.03.010_b0020) 2002; 22 Soroudi (10.1016/j.ijepes.2015.03.010_b0125) 2011; 5 Soroudi (10.1016/j.ijepes.2015.03.010_b0130) 2012; 6 Celli (10.1016/j.ijepes.2015.03.010_b0135) 2005; 20 Pregelj (10.1016/j.ijepes.2015.03.010_b0050) 2006; 21 Farrag (10.1016/j.ijepes.2015.03.010_b0010) 1999; 21 Borges (10.1016/j.ijepes.2015.03.010_b0080) 2006; 28 Sorudi (10.1016/j.ijepes.2015.03.010_b0120) 2012; 27 Delbem (10.1016/j.ijepes.2015.03.010_b0175) 2005; 20 Atwa (10.1016/j.ijepes.2015.03.010_b0105) 2010; 25 Lavorato (10.1016/j.ijepes.2015.03.010_b0165) 2012; 27 Ramos (10.1016/j.ijepes.2015.03.010_b0185) 2005; 20 Hong (10.1016/j.ijepes.2015.03.010_b0190) 2005; 20 Franco (10.1016/j.ijepes.2015.03.010_b0035) 2014; 62 Gitizadeh (10.1016/j.ijepes.2015.03.010_b0150) 2013; 101 Miguez (10.1016/j.ijepes.2015.03.010_b0170) 2002; 17 Shirmohammadi (10.1016/j.ijepes.2015.03.010_b0200) 1988; 3 Willis (10.1016/j.ijepes.2015.03.010_b0015) 2004 Jabr (10.1016/j.ijepes.2015.03.010_b0075) 2009; 3 Bae (10.1016/j.ijepes.2015.03.010_b0140) 2004; 19 Sedghi (10.1016/j.ijepes.2015.03.010_b0155) 2013; 52 El-Khattam (10.1016/j.ijepes.2015.03.010_b0040) 2004; 19 Ziari (10.1016/j.ijepes.2015.03.010_b0065) 2013; 28 Ziari (10.1016/j.ijepes.2015.03.010_b0090) 2012; 27 Shayeghi (10.1016/j.ijepes.2015.03.010_b0160) 2013; 48 Jabr (10.1016/j.ijepes.2015.03.010_b0030) 2013; 28 Mendez (10.1016/j.ijepes.2015.03.010_b0060) 2006; 28 Shaaban (10.1016/j.ijepes.2015.03.010_b0025) 2013; 28 Wang (10.1016/j.ijepes.2015.03.010_b0085) 2008; 38 Thresher (10.1016/j.ijepes.2015.03.010_b0095) 2007; 5 Smith (10.1016/j.ijepes.2015.03.010_b0100) 2009; 7 Falaghi (10.1016/j.ijepes.2015.03.010_b0145) 2011; 33 Carreño (10.1016/j.ijepes.2015.03.010_b0180) 2008; 23 |
References_xml | – volume: 20 start-page: 750 year: 2005 end-page: 757 ident: b0135 article-title: A multiobjective evolutionary algorithm for the sizing and sitting of distributed generation publication-title: IEEE Trans Power Syst – volume: 28 start-page: 639 year: 2013 end-page: 649 ident: b0025 article-title: DG allocation for benefit maximization in distribution networks publication-title: IEEE Trans Power Syst – volume: 19 start-page: 1674 year: 2004 end-page: 1684 ident: b0040 article-title: Optimal investment planning for distributed generation in a competitive electricity market publication-title: IEEE Trans Power Syst – volume: 20 start-page: 1062 year: 2005 end-page: 1069 ident: b0190 article-title: Determination of network configuration considering multiobjective in distribution systems using genetic algorithms publication-title: IEEE Trans Power Syst – volume: 21 start-page: 523 year: 1999 end-page: 531 ident: b0010 article-title: A new model for distribution system planning publication-title: Electr Power Energy Syst – volume: 19 start-page: 287 year: 2004 end-page: 292 ident: b0140 article-title: Optimal operating strategy for distributed generation considering hourly reliability worth publication-title: IEEE Trans Power Syst – volume: 52 start-page: 221 year: 2013 end-page: 230 ident: b0155 article-title: Distribution network expansion considering distributed generation and storage units using modified PSO algorithm publication-title: Electr Power Energy Syst – volume: 28 start-page: 244 year: 2006 end-page: 252 ident: b0060 article-title: Impact of distributed generation on distribution investment deferral publication-title: Electr Power Energy Syst – volume: 101 start-page: 655 year: 2013 end-page: 666 ident: b0150 article-title: Multistage distribution system expansion planning considering distributed generation using hybrid evolutionary algorithms publication-title: Appl Energy – start-page: 643 year: 2012 end-page: 655 ident: b0210 article-title: Introduction to optimum design publication-title: Chapter 16: Genetic algorithms for optimum design – volume: 51 start-page: 2685 year: 2010 end-page: 2691 ident: b0215 article-title: Studying effect of bundle lines on TNEP considering network losses using decimal codification genetic algorithm publication-title: Energy Convers Manage – volume: 22 start-page: 60 year: 2002 end-page: 62 ident: b0020 article-title: Distribution system planning in focus publication-title: IEEE Power Eng Rev – volume: 21 start-page: 1592 year: 2006 end-page: 1599 ident: b0055 article-title: On the quantification of the network capacity deferral value of distributed generation publication-title: IEEE Trans Power Syst – volume: 6 start-page: 67 year: 2012 end-page: 78 ident: b0130 article-title: Binary PSO-based dynamic multi-objective model for distributed generation planning under uncertainty publication-title: IET Renew Power Gener – volume: 25 start-page: 360 year: 2010 end-page: 370 ident: b0105 article-title: Optimal renewable resources mix for distribution system energy loss minimization publication-title: IEEE Trans Power Syst – volume: 5 start-page: 34 year: 2007 end-page: 46 ident: b0095 article-title: To capture the wind publication-title: IEEE Power Energy Mag – volume: 27 start-page: 172 year: 2012 end-page: 180 ident: b0165 article-title: Imposing radiality constraints in distribution system optimization problems publication-title: IEEE Trans Power Syst – volume: 27 start-page: 757 year: 2012 end-page: 765 ident: b0090 article-title: Integrated distribution system planning to improve reliability under load growth publication-title: IEEE Trans Power Syst – volume: 79 start-page: 912 year: 2009 end-page: 918 ident: b0070 article-title: An analytical method for the sizing and sitting of distributed generators in radial systems publication-title: Electr Power Syst Res – volume: 38 start-page: 757 year: 2008 end-page: 764 ident: b0085 article-title: Reliability-constrained optimum placement of reclosers and distributed generators in distribution networks using an ant colony system algorithm publication-title: IEEE Trans Syst Man Cybern C Appl Rev – volume: 23 start-page: 1542 year: 2008 end-page: 1551 ident: b0180 article-title: An efficient codification to solve distribution network reconfiguration for loss reduction problem publication-title: IEEE Trans Power Syst – volume: 7 start-page: 41 year: 2009 end-page: 51 ident: b0100 article-title: A mighty wind publication-title: IEEE Power Energy Mag – volume: 3 start-page: 753 year: 1988 end-page: 762 ident: b0200 article-title: A compensation-based power flow method for weakly meshed distribution and transmission networks publication-title: IEEE Trans Power Syst – year: 1997 ident: b0205 article-title: Genetic algorithms and engineering design – volume: 28 start-page: 1888 year: 2013 end-page: 1897 ident: b0030 article-title: Polyhedral formulations and loop elimination constraints for distribution network expansion planning publication-title: IEEE Trans Power Syst – volume: 20 start-page: 1158 year: 2005 end-page: 1165 ident: b0005 article-title: An integrated distributed generation optimization model for distribution system planning publication-title: IEEE Trans Power Syst – volume: 20 start-page: 425 year: 2005 end-page: 436 ident: b0175 article-title: Main chain representation for evolutionary algorithms applied to distribution system reconfiguration publication-title: IEEE Trans Power Syst – volume: 19 start-page: 45 year: 2010 end-page: 58 ident: b0225 article-title: On optimal design and expansion of electrical power distribution systems publication-title: J Circ Syst Comput – reference: Greatbanks JA, Popovic DH, Begovic M, Pregelj A, Green TC. On optimization for security and reliability of power systems with distributed generation. In: Proc. 2003 IEEE power tech conf., vol. 1. – volume: 2 start-page: 252 year: 2008 end-page: 260 ident: b0195 article-title: Risk-based distributed generation placement publication-title: IET Gener Transm Distrib – volume: 33 start-page: 1489 year: 2011 end-page: 1497 ident: b0145 article-title: DG integrated multistage distribution system expansion planning publication-title: Electr Power Energy Syst – volume: 3 start-page: 713 year: 2009 end-page: 723 ident: b0075 article-title: Ordinal optimization approach for locating and sizing of distributed generation publication-title: IET Gener Transm Distrib – volume: 48 start-page: 111 year: 2013 end-page: 122 ident: b0160 article-title: Dynamic sub-transmission system expansion planning incorporating distributed generation using hybrid DCGA and LP technique publication-title: Electr Power Energy Syst – volume: 17 start-page: 931 year: 2002 end-page: 936 ident: b0170 article-title: An improved branch-exchange algorithm for large-scale distribution network planning publication-title: IEEE Trans Power Syst – volume: 20 start-page: 556 year: 2005 end-page: 564 ident: b0185 article-title: Path-based distribution network modeling: application to reconfiguration for loss reduction publication-title: IEEE Trans Power Syst – year: 2004 ident: b0015 article-title: Power distribution planning reference book – volume: 28 start-page: 587 year: 2013 end-page: 597 ident: b0065 article-title: Optimal distribution network reinforcement considering load growth, line loss, and reliability publication-title: IEEE Trans Power Syst – volume: 21 start-page: 1442 year: 2006 end-page: 1449 ident: b0050 article-title: Recloser allocation for improved reliability of DG-enhanced distribution networks publication-title: IEEE Trans Power Syst – volume: 27 start-page: 1283 year: 2012 end-page: 1293 ident: b0120 article-title: Possibilistic-scenario model for DG impact assessment on distribution networks in an uncertain environment publication-title: IEEE Trans Power Syst – volume: 25 start-page: 524 year: 2006 end-page: 532 ident: b0110 article-title: Investigating distributed generation systems performance using Monte Carlo simulation publication-title: IEEE Trans Power Syst – volume: 5 start-page: 1173 year: 2011 end-page: 1182 ident: b0125 article-title: Probabilistic dynamic multi-objective model for renewable and non-renewable distributed generation planning publication-title: IET Gener Transm Distrib – volume: 5 start-page: 79 year: 2011 end-page: 88 ident: b0115 article-title: Probabilistic approach for optimal allocation of wind-based distributed generation in distribution systems publication-title: IET Renew Power Gener – volume: 28 start-page: 413 year: 2006 end-page: 420 ident: b0080 article-title: Optimal distributed generation allocation for reliability, losses, and voltage improvement publication-title: Electr Power Energy Syst – volume: 62 start-page: 265 year: 2014 end-page: 272 ident: b0035 article-title: A mixed-integer quadratically-constrained programming model for the distribution system expansion planning publication-title: Electr Power Energy Syst – volume: 19 start-page: 1674 issue: 3 year: 2004 ident: 10.1016/j.ijepes.2015.03.010_b0040 article-title: Optimal investment planning for distributed generation in a competitive electricity market publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2004.831699 – volume: 21 start-page: 1592 issue: 4 year: 2006 ident: 10.1016/j.ijepes.2015.03.010_b0055 article-title: On the quantification of the network capacity deferral value of distributed generation publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2006.881158 – volume: 33 start-page: 1489 issue: 8 year: 2011 ident: 10.1016/j.ijepes.2015.03.010_b0145 article-title: DG integrated multistage distribution system expansion planning publication-title: Electr Power Energy Syst doi: 10.1016/j.ijepes.2011.06.031 – volume: 62 start-page: 265 year: 2014 ident: 10.1016/j.ijepes.2015.03.010_b0035 article-title: A mixed-integer quadratically-constrained programming model for the distribution system expansion planning publication-title: Electr Power Energy Syst doi: 10.1016/j.ijepes.2014.04.048 – volume: 38 start-page: 757 issue: 6 year: 2008 ident: 10.1016/j.ijepes.2015.03.010_b0085 article-title: Reliability-constrained optimum placement of reclosers and distributed generators in distribution networks using an ant colony system algorithm publication-title: IEEE Trans Syst Man Cybern C Appl Rev doi: 10.1109/TSMCC.2008.2001573 – volume: 28 start-page: 244 issue: 4 year: 2006 ident: 10.1016/j.ijepes.2015.03.010_b0060 article-title: Impact of distributed generation on distribution investment deferral publication-title: Electr Power Energy Syst doi: 10.1016/j.ijepes.2005.11.016 – volume: 22 start-page: 60 issue: 1 year: 2002 ident: 10.1016/j.ijepes.2015.03.010_b0020 article-title: Distribution system planning in focus publication-title: IEEE Power Eng Rev doi: 10.1109/39.975662 – year: 1997 ident: 10.1016/j.ijepes.2015.03.010_b0205 – volume: 27 start-page: 757 issue: 2 year: 2012 ident: 10.1016/j.ijepes.2015.03.010_b0090 article-title: Integrated distribution system planning to improve reliability under load growth publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRD.2011.2176964 – volume: 3 start-page: 713 issue: 8 year: 2009 ident: 10.1016/j.ijepes.2015.03.010_b0075 article-title: Ordinal optimization approach for locating and sizing of distributed generation publication-title: IET Gener Transm Distrib doi: 10.1049/iet-gtd.2009.0019 – volume: 23 start-page: 1542 issue: 4 year: 2008 ident: 10.1016/j.ijepes.2015.03.010_b0180 article-title: An efficient codification to solve distribution network reconfiguration for loss reduction problem publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2008.2002178 – volume: 20 start-page: 556 issue: 2 year: 2005 ident: 10.1016/j.ijepes.2015.03.010_b0185 article-title: Path-based distribution network modeling: application to reconfiguration for loss reduction publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2005.846212 – volume: 2 start-page: 252 issue: 2 year: 2008 ident: 10.1016/j.ijepes.2015.03.010_b0195 article-title: Risk-based distributed generation placement publication-title: IET Gener Transm Distrib doi: 10.1049/iet-gtd:20070046 – volume: 20 start-page: 1158 issue: 2 year: 2005 ident: 10.1016/j.ijepes.2015.03.010_b0005 article-title: An integrated distributed generation optimization model for distribution system planning publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2005.846114 – volume: 21 start-page: 1442 issue: 3 year: 2006 ident: 10.1016/j.ijepes.2015.03.010_b0050 article-title: Recloser allocation for improved reliability of DG-enhanced distribution networks publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2006.876649 – volume: 6 start-page: 67 issue: 2 year: 2012 ident: 10.1016/j.ijepes.2015.03.010_b0130 article-title: Binary PSO-based dynamic multi-objective model for distributed generation planning under uncertainty publication-title: IET Renew Power Gener doi: 10.1049/iet-rpg.2011.0028 – volume: 28 start-page: 639 issue: 2 year: 2013 ident: 10.1016/j.ijepes.2015.03.010_b0025 article-title: DG allocation for benefit maximization in distribution networks publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2012.2213309 – volume: 21 start-page: 523 issue: 7 year: 1999 ident: 10.1016/j.ijepes.2015.03.010_b0010 article-title: A new model for distribution system planning publication-title: Electr Power Energy Syst doi: 10.1016/S0142-0615(98)00059-3 – volume: 7 start-page: 41 issue: 2 year: 2009 ident: 10.1016/j.ijepes.2015.03.010_b0100 article-title: A mighty wind publication-title: IEEE Power Energy Mag doi: 10.1109/MPE.2008.931492 – volume: 20 start-page: 750 issue: 2 year: 2005 ident: 10.1016/j.ijepes.2015.03.010_b0135 article-title: A multiobjective evolutionary algorithm for the sizing and sitting of distributed generation publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2005.846219 – ident: 10.1016/j.ijepes.2015.03.010_b0045 – volume: 5 start-page: 79 issue: 1 year: 2011 ident: 10.1016/j.ijepes.2015.03.010_b0115 article-title: Probabilistic approach for optimal allocation of wind-based distributed generation in distribution systems publication-title: IET Renew Power Gener doi: 10.1049/iet-rpg.2009.0011 – volume: 20 start-page: 425 issue: 1 year: 2005 ident: 10.1016/j.ijepes.2015.03.010_b0175 article-title: Main chain representation for evolutionary algorithms applied to distribution system reconfiguration publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2004.840442 – volume: 19 start-page: 287 issue: 1 year: 2004 ident: 10.1016/j.ijepes.2015.03.010_b0140 article-title: Optimal operating strategy for distributed generation considering hourly reliability worth publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2003.818738 – volume: 3 start-page: 753 issue: 2 year: 1988 ident: 10.1016/j.ijepes.2015.03.010_b0200 article-title: A compensation-based power flow method for weakly meshed distribution and transmission networks publication-title: IEEE Trans Power Syst doi: 10.1109/59.192932 – volume: 28 start-page: 587 issue: 2 year: 2013 ident: 10.1016/j.ijepes.2015.03.010_b0065 article-title: Optimal distribution network reinforcement considering load growth, line loss, and reliability publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2012.2211626 – year: 2004 ident: 10.1016/j.ijepes.2015.03.010_b0015 – volume: 20 start-page: 1062 issue: 2 year: 2005 ident: 10.1016/j.ijepes.2015.03.010_b0190 article-title: Determination of network configuration considering multiobjective in distribution systems using genetic algorithms publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2005.846067 – volume: 5 start-page: 1173 issue: 11 year: 2011 ident: 10.1016/j.ijepes.2015.03.010_b0125 article-title: Probabilistic dynamic multi-objective model for renewable and non-renewable distributed generation planning publication-title: IET Gener Transm Distrib doi: 10.1049/iet-gtd.2011.0173 – volume: 17 start-page: 931 issue: 4 year: 2002 ident: 10.1016/j.ijepes.2015.03.010_b0170 article-title: An improved branch-exchange algorithm for large-scale distribution network planning publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2002.804998 – volume: 52 start-page: 221 issue: 4 year: 2013 ident: 10.1016/j.ijepes.2015.03.010_b0155 article-title: Distribution network expansion considering distributed generation and storage units using modified PSO algorithm publication-title: Electr Power Energy Syst doi: 10.1016/j.ijepes.2013.03.041 – volume: 101 start-page: 655 year: 2013 ident: 10.1016/j.ijepes.2015.03.010_b0150 article-title: Multistage distribution system expansion planning considering distributed generation using hybrid evolutionary algorithms publication-title: Appl Energy doi: 10.1016/j.apenergy.2012.07.010 – volume: 27 start-page: 1283 issue: 3 year: 2012 ident: 10.1016/j.ijepes.2015.03.010_b0120 article-title: Possibilistic-scenario model for DG impact assessment on distribution networks in an uncertain environment publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2011.2180933 – volume: 51 start-page: 2685 issue: 12 year: 2010 ident: 10.1016/j.ijepes.2015.03.010_b0215 article-title: Studying effect of bundle lines on TNEP considering network losses using decimal codification genetic algorithm publication-title: Energy Convers Manage doi: 10.1016/j.enconman.2010.06.003 – volume: 19 start-page: 45 issue: 1 year: 2010 ident: 10.1016/j.ijepes.2015.03.010_b0225 article-title: On optimal design and expansion of electrical power distribution systems publication-title: J Circ Syst Comput doi: 10.1142/S0218126610005962 – volume: 79 start-page: 912 issue: 6 year: 2009 ident: 10.1016/j.ijepes.2015.03.010_b0070 article-title: An analytical method for the sizing and sitting of distributed generators in radial systems publication-title: Electr Power Syst Res doi: 10.1016/j.epsr.2008.12.007 – volume: 28 start-page: 1888 issue: 2 year: 2013 ident: 10.1016/j.ijepes.2015.03.010_b0030 article-title: Polyhedral formulations and loop elimination constraints for distribution network expansion planning publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2012.2230652 – volume: 5 start-page: 34 issue: 6 year: 2007 ident: 10.1016/j.ijepes.2015.03.010_b0095 article-title: To capture the wind publication-title: IEEE Power Energy Mag doi: 10.1109/MPE.2007.906304 – start-page: 643 year: 2012 ident: 10.1016/j.ijepes.2015.03.010_b0210 article-title: Introduction to optimum design – volume: 25 start-page: 360 issue: 1 year: 2010 ident: 10.1016/j.ijepes.2015.03.010_b0105 article-title: Optimal renewable resources mix for distribution system energy loss minimization publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2009.2030276 – volume: 27 start-page: 172 issue: 1 year: 2012 ident: 10.1016/j.ijepes.2015.03.010_b0165 article-title: Imposing radiality constraints in distribution system optimization problems publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2011.2161349 – volume: 28 start-page: 413 issue: 6 year: 2006 ident: 10.1016/j.ijepes.2015.03.010_b0080 article-title: Optimal distributed generation allocation for reliability, losses, and voltage improvement publication-title: Electr Power Energy Syst doi: 10.1016/j.ijepes.2006.02.003 – volume: 48 start-page: 111 year: 2013 ident: 10.1016/j.ijepes.2015.03.010_b0160 article-title: Dynamic sub-transmission system expansion planning incorporating distributed generation using hybrid DCGA and LP technique publication-title: Electr Power Energy Syst doi: 10.1016/j.ijepes.2012.11.029 – volume: 25 start-page: 524 issue: 2 year: 2006 ident: 10.1016/j.ijepes.2015.03.010_b0110 article-title: Investigating distributed generation systems performance using Monte Carlo simulation publication-title: IEEE Trans Power Syst doi: 10.1109/TPWRS.2006.873131 |
SSID | ssj0007942 |
Score | 2.4728258 |
Snippet | •An integrated DNEP is proposed considering renewable and non-renewable DGs.•Reliability and operational considerations are regarded.•Uncertainties of wind... |
SourceID | crossref elsevier |
SourceType | Enrichment Source Index Database Publisher |
StartPage | 56 |
SubjectTerms | Distributed generation Distribution network Integrated expansion planning Operational conditions Reliability Uncertainty |
Title | Integrated distribution network expansion planning incorporating distributed generation considering uncertainties, reliability, and operational conditions |
URI | https://dx.doi.org/10.1016/j.ijepes.2015.03.010 |
Volume | 73 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LSwMxEA6lXvQgPrE-Sg4eu3Zf2d0eS7FUxZ4q9BayeUhL2S6lgl78If5aZzbZWkEUPGbJLCEzmZmEb74h5BpZpYTJtcd8IfDpRnuZ0YEn8hRpsUXGqnZAj-Nk9BTfT9m0QQZ1LQzCKp3vtz698tbuS9ftZreczboISwptQMY8nyHjZxynaOU3718wD7C30MIYQ-xiwOryuQrjNZvrUiNpd8AqqlOso_0pPG2FnOEB2Xe5Iu3b5RyShi6OyN4Wg-Ax-bir6R4UVciB69pX0cLCu6l-heOOL2K0dO2JKPIxWPpiHG2k4A_PFQd1JS9dI0-cAqHPAgeQfLVDV3oxs-zebx0qCkWXpZOCxYKcsiiwEzIZ3k4GI8-1W_Ak3BvWnjEqybIk7kmp8kSy1ARRJoXMZZ4nfqiZiOH4a6HjQEJeHmVG6liEPcMinaokOiXNYlnoM0J9k7FEpBIchIql8kVqQgHKAn8Cd_eeaJGo3mQuHRU5dsRY8BpzNudWNRxVw_2Ig2paxNtIlZaK44_5aa0__s2kOESLXyXP_y15QXZxZPEul6S5Xr3oK8ha1nm7Mss22enfPYzGn9rW85g |
linkProvider | Elsevier |
linkToHtml | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV3NS8MwFA86D-pB_MRvc_C4uq5t2uwo4th022nCbiHNh2xILTJBL_4h_rW-16Q6QRS8FNrmlZCXvvcSfvn9CDlHVilpcxOwUErcujEBt6YdyDxDWmzJWSUHNBylvbvkZsImS-SqPguDsEof-11Mr6K1f9Lyo9kqp9MWwpIil5CxzmfxMlmBK0cZg4u3L5wHTLjI4RgjlDFg9fm5CuQ1nZnSIGt3m1Vcp3iQ9qf8tJBzuptkwxeL9NL1Z4ssmWKbrC9QCO6Q937N96CpRhJcr19FC4fvpuYF_nfcEqOl1yeiSMjg-Ivx7tMKvnBfkVBX9soreWITyH0OOYDsq036ZB6mjt77tUlloelj6a2gs2CnHQxsl4y71-OrXuD1FgIFC4d5YK1OOU-TjlI6TxXLbDvmSqpc5XkaRobJBP5_I03SVlCYx9wqk8ioY1lsMp3Ge6RRPBZmn9DQcpbKTEGE0InSocxsJMFbEFBg8d6RBySuB1koz0WOkhgPogadzYRzjUDXiDAW4JoDEnxalY6L44_2We0_8W1OCUgXv1oe_tvyjKz2xsOBGPRHt0dkDd848Msxacyfns0JlDDz_LSaoh9oMPUm |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Integrated+distribution+network+expansion+planning+incorporating+distributed+generation+considering+uncertainties%2C+reliability%2C+and+operational+conditions&rft.jtitle=International+journal+of+electrical+power+%26+energy+systems&rft.au=Bagheri%2C+A.&rft.au=Monsef%2C+H.&rft.au=Lesani%2C+H.&rft.date=2015-12-01&rft.pub=Elsevier+Ltd&rft.issn=0142-0615&rft.eissn=1879-3517&rft.volume=73&rft.spage=56&rft.epage=70&rft_id=info:doi/10.1016%2Fj.ijepes.2015.03.010&rft.externalDocID=S0142061515001453 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0142-0615&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0142-0615&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0142-0615&client=summon |