Hwang, F., Kovalyov, M., & Lin, B. (2012). Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence. Discrete optimization, 9(1), 29-39. https://doi.org/10.1016/j.disopt.2011.11.001
Chicago Style (17th ed.) CitationHwang, F.J, M.Y Kovalyov, and B.M.T Lin. "Total Completion Time Minimization in Two-machine Flow Shop Scheduling Problems with a Fixed Job Sequence." Discrete Optimization 9, no. 1 (2012): 29-39. https://doi.org/10.1016/j.disopt.2011.11.001.
MLA (9th ed.) CitationHwang, F.J, et al. "Total Completion Time Minimization in Two-machine Flow Shop Scheduling Problems with a Fixed Job Sequence." Discrete Optimization, vol. 9, no. 1, 2012, pp. 29-39, https://doi.org/10.1016/j.disopt.2011.11.001.
Warning: These citations may not always be 100% accurate.