Flexible job shop scheduling with stochastic machine breakdowns by an improved tuna swarm optimization algorithm
In job-shop production environments, machine breakdowns are a significant factor in reducing productivity. Existing approaches seldom consider algorithm improvement and rescheduling scheme design in an integrated manner, and lack stability considerations. This paper addresses the flexible job shop s...
Saved in:
Published in | Journal of manufacturing systems Vol. 74; pp. 180 - 197 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Elsevier Ltd
01.06.2024
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!