An improved artificial bee colony algorithm for solving multi-objective low-carbon flexible job shop scheduling problem
Based on the analysis of multi-objective flexible job-shop scheduling problem (FJSP), a multi-objective low-carbon job-shop scheduling problem(MLFJSP) with variable processing speed constraint is proposed in this paper. The optimization objectives of MLFJSP include minimizing the makespan, total car...
Saved in:
Published in | Applied soft computing Vol. 95; p. 106544 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Elsevier B.V
01.10.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!