Exact and Hybrid Metaheuristic Algorithms to Solve Bi-Objective Permutation Flow Shop Scheduling Problem

In this paper, we consider 2-machine permutation flow shop scheduling problem with bi-objective of minimizing the makespan ( C max ) and maximum tardiness ( T max ). The aim is to minimize the two objective functions lexicographicaly, which is minimize maximum tardiness subject to that the makespan...

Full description

Saved in:
Bibliographic Details
Published inJournal of physics. Conference series Vol. 1818; no. 1; p. 12042
Main Author Motair, Hafed M.
Format Journal Article
LanguageEnglish
Published Bristol IOP Publishing 01.03.2021
Subjects
Online AccessGet full text

Cover

Loading…