Exact and Hybrid Metaheuristic Algorithms to Solve Bi-Objective Permutation Flow Shop Scheduling Problem
In this paper, we consider 2-machine permutation flow shop scheduling problem with bi-objective of minimizing the makespan ( C max ) and maximum tardiness ( T max ). The aim is to minimize the two objective functions lexicographicaly, which is minimize maximum tardiness subject to that the makespan...
Saved in:
Published in | Journal of physics. Conference series Vol. 1818; no. 1; p. 12042 |
---|---|
Main Author | |
Format | Journal Article |
Language | English |
Published |
Bristol
IOP Publishing
01.03.2021
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!