Fatigue reliability evaluation of aging prestressed concrete bridge accounting for stochastic traffic loading and resistance degradation

Fatigue damage accumulation is a critical factor resulting in the failure of prestressed concrete (PC) bridges. The fatigue damage is usually caused by the coupled effect of cyclic vehicle loading and environmental corrosion. This study investigated probabilistic fatigue damage on aging PC bridges c...

Full description

Saved in:
Bibliographic Details
Published inAdvances in structural engineering Vol. 24; no. 13; pp. 3021 - 3029
Main Authors Luo, Yuan, Zheng, Hui, Zhang, Haiping, Liu, Yang
Format Journal Article
LanguageEnglish
Published London, England SAGE Publications 01.10.2021
Subjects
Online AccessGet full text

Cover

Loading…
Abstract Fatigue damage accumulation is a critical factor resulting in the failure of prestressed concrete (PC) bridges. The fatigue damage is usually caused by the coupled effect of cyclic vehicle loading and environmental corrosion. This study investigated probabilistic fatigue damage on aging PC bridges considering both stochastic traffic loading and corrosion. A stochastic traffic model was derived based on long-term monitoring data aiming to simulate fatigue stress spectra of critical rebar. The effect of cracks on the fatigue stress spectra was investigated in order to model the fatigue stress state more realistically. A three-stage traffic growth model was established based on traffic volume histories of three highways in China. A fatigue limit state function considering traffic growth and corrosion effect was deduced for fatigue reliability assessment of PC bridges. Numerical results show that the stress amplitude of rebar considering cracks is 1.53 times greater than the rebar with no-cracks, resulting in a decrease of fatigue life by 68 years. In addition, the three-stage traffic growth models lead to 25 years shorter fatigue life than the one considering a linear traffic growth model. Finally, the corrosion effect results in a fatigue life of 44 years. The numerical results provide a theoretical basis for fatigue life estimation and maintenance of aging PC bridges.
AbstractList Fatigue damage accumulation is a critical factor resulting in the failure of prestressed concrete (PC) bridges. The fatigue damage is usually caused by the coupled effect of cyclic vehicle loading and environmental corrosion. This study investigated probabilistic fatigue damage on aging PC bridges considering both stochastic traffic loading and corrosion. A stochastic traffic model was derived based on long-term monitoring data aiming to simulate fatigue stress spectra of critical rebar. The effect of cracks on the fatigue stress spectra was investigated in order to model the fatigue stress state more realistically. A three-stage traffic growth model was established based on traffic volume histories of three highways in China. A fatigue limit state function considering traffic growth and corrosion effect was deduced for fatigue reliability assessment of PC bridges. Numerical results show that the stress amplitude of rebar considering cracks is 1.53 times greater than the rebar with no-cracks, resulting in a decrease of fatigue life by 68 years. In addition, the three-stage traffic growth models lead to 25 years shorter fatigue life than the one considering a linear traffic growth model. Finally, the corrosion effect results in a fatigue life of 44 years. The numerical results provide a theoretical basis for fatigue life estimation and maintenance of aging PC bridges.
Author Zheng, Hui
Zhang, Haiping
Liu, Yang
Luo, Yuan
Author_xml – sequence: 1
  givenname: Yuan
  orcidid: 0000-0003-1767-8806
  surname: Luo
  fullname: Luo, Yuan
– sequence: 2
  givenname: Hui
  surname: Zheng
  fullname: Zheng, Hui
  email: zhenghui@hut.edu.cn
– sequence: 3
  givenname: Haiping
  surname: Zhang
  fullname: Zhang, Haiping
– sequence: 4
  givenname: Yang
  surname: Liu
  fullname: Liu, Yang
BookMark eNp9kMFOwzAMhiM0JLbBA3DLC3TEbdd0RzQxQJrEZffKTZySqSRTkiHxBjw27cYJpB2sX7L9-bc9YxPnHTF2D2IBIOUDFNWqLIo8BxAgV6vlFZvmoqyzUgBM2HSsZ2PDDZvFuBcCcilhyr43mGx3JB6ot9ja3qYvTp_YH4e8d9wbjp11HT8EimmISJor71SgRLwNVnfEUSl_dGlsMz7wmLx6x5is4imgMYP2HvVYRqcHp2hjQqeIa-oC6pPTLbs22Ee6-9U5222eduuXbPv2_Lp-3GYqr8uUoWwrLEnpsiWAFUI-XA8oq1aT0EUhoSLQhSASpkXQNdX5Eo2sZYuVqYs5k-exKvgYA5lG2XRaYFjV9g2IZvxn8--fAwl_yEOwHxi-LjKLMxOxo2bvj8ENt10AfgBvaorY
CitedBy_id crossref_primary_10_1177_13694332231178983
crossref_primary_10_3390_buildings12010065
crossref_primary_10_1520_JTE20230748
crossref_primary_10_3390_s22010260
crossref_primary_10_3390_su16219388
crossref_primary_10_1155_2022_1704544
crossref_primary_10_1080_17455030_2022_2117875
crossref_primary_10_1016_j_jmrt_2022_05_148
crossref_primary_10_32604_cmes_2022_017967
crossref_primary_10_1016_j_jobe_2022_104765
crossref_primary_10_1186_s43251_023_00112_2
crossref_primary_10_3390_ma15082864
crossref_primary_10_1016_j_autcon_2025_106105
crossref_primary_10_1155_2022_6340064
crossref_primary_10_3390_buildings14051284
crossref_primary_10_3390_ma16031029
crossref_primary_10_1155_2022_2464675
crossref_primary_10_1155_2023_5111719
crossref_primary_10_1016_j_istruc_2024_106515
crossref_primary_10_1155_2022_9946957
crossref_primary_10_2478_amns_2024_3000
crossref_primary_10_1016_j_jmrt_2022_02_123
crossref_primary_10_54203_jceu_2024_41
crossref_primary_10_1007_s40996_022_00827_8
crossref_primary_10_1016_j_cscm_2022_e01024
crossref_primary_10_1080_15732479_2023_2271962
crossref_primary_10_1016_j_istruc_2024_108052
crossref_primary_10_1016_j_jobe_2022_104457
crossref_primary_10_1155_2022_2924836
crossref_primary_10_3390_infrastructures10040070
crossref_primary_10_1007_s12205_022_0961_0
crossref_primary_10_1007_s43452_022_00489_3
crossref_primary_10_1142_S0219455423500207
crossref_primary_10_3390_coatings12030313
crossref_primary_10_1016_j_dt_2022_04_015
crossref_primary_10_3389_fmats_2022_918107
crossref_primary_10_1016_j_engstruct_2025_119939
crossref_primary_10_1016_j_istruc_2023_104885
crossref_primary_10_3390_ma15041402
crossref_primary_10_1177_13694332241266541
crossref_primary_10_1016_j_istruc_2023_105654
crossref_primary_10_3389_fmats_2022_1012489
crossref_primary_10_1016_j_jmrt_2022_02_076
crossref_primary_10_3390_ma15124194
crossref_primary_10_14359_51743304
crossref_primary_10_1007_s11276_022_02906_0
crossref_primary_10_1061__ASCE_CP_1943_5487_0001026
crossref_primary_10_1142_S0219455425500518
crossref_primary_10_1016_j_prostr_2023_12_057
crossref_primary_10_3390_s21248307
crossref_primary_10_3390_su14074136
crossref_primary_10_2139_ssrn_4164476
crossref_primary_10_1016_j_jobe_2022_104917
crossref_primary_10_1016_j_conbuildmat_2024_136631
crossref_primary_10_3390_sym14061261
Cites_doi 10.3390/s16030317
10.1007/s13296-018-0109-8
10.1016/j.ijfatigue.2018.02.009
10.1061/(ASCE)0733-9445(1984)110:10(2340)
10.1061/(ASCE)BE.1943-5592.0001337
10.1115/1.4009458
10.1061/(ASCE)BE.1943-5592.0001137
10.1061/(ASCE)BE.1943-5592.0000982
10.1061/(ASCE)1084-0702(2005)10:1(12)
10.3390/s19225056
10.1080/15732470500365562
10.1016/j.ijfatigue.2018.02.021
10.1002/suco.201500094
10.1061/(ASCE)BE.1943-5592.0001525
10.1016/j.conbuildmat.2012.02.071
10.1061/(ASCE)BE.1943-5592.0000411
10.1260/1369-4332.17.2.179
10.1016/j.engstruct.2018.03.073
10.1016/j.ijfatigue.2013.09.005
10.1016/j.engstruct.2014.04.004
ContentType Journal Article
Copyright The Author(s) 2021
Copyright_xml – notice: The Author(s) 2021
DBID AAYXX
CITATION
DOI 10.1177/13694332211017995
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList CrossRef

DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 2048-4011
EndPage 3029
ExternalDocumentID 10_1177_13694332211017995
10.1177_13694332211017995
GrantInformation_xml – fundername: the Key Laboratory of Bridge Engineering Safety Control by the Department of Education (Changsha University of Science & Technology)
  grantid: No. 19KB02
– fundername: national natural science foundation of china
  grantid: 51608189
  funderid: https://doi.org/10.13039/501100001809
– fundername: the Industry Key Laboratory of Traffic Infrastructure Security Risk Management (Changsha University of Science & Technology)
  grantid: 16KE01
– fundername: national natural science foundation of china
  grantid: No. 2020JJ5140
  funderid: https://doi.org/10.13039/501100001809
– fundername: national natural science foundation of china
  grantid: No. 2020JJ5143
  funderid: https://doi.org/10.13039/501100001809
– fundername: national natural science foundation of china
  grantid: No.2019JJ50130
  funderid: https://doi.org/10.13039/501100001809
GroupedDBID -TM
-TN
0R~
23M
4.4
54M
5GY
6KP
AABPG
AADUE
AAGGD
AAGLT
AAJPV
AANSI
AAOTM
AAOVH
AAPEO
AAQXI
AARIX
AATAA
AATZT
ABAWP
ABCCA
ABCJG
ABDBF
ABDWY
ABEIX
ABFNE
ABFWQ
ABGWC
ABHKI
ABIDT
ABJNI
ABKRH
ABLUO
ABPNF
ABQKF
ABQXT
ABRHV
ABUBZ
ABUJY
ABYTW
ACDXX
ACGBL
ACGFS
ACOFE
ACOXC
ACROE
ACSIQ
ACUAV
ACUHS
ACUIR
ACXKE
ADEBD
ADEIA
ADGDL
ADMLS
ADRRZ
ADTBJ
ADUKL
ADVBO
AEDFJ
AENEX
AEPTA
AEQLS
AESZF
AEWDL
AEWHI
AEXNY
AFEET
AFGYO
AFKRG
AFMOU
AFQAA
AFUIA
AGKLV
AGNHF
AGWFA
AHDMH
AIZZC
AJEFB
AJUZI
ALMA_UNASSIGNED_HOLDINGS
ARTOV
AUTPY
AYAKG
BBRGL
BDDNI
BPACV
CBRKF
CFDXU
CKLRP
CORYS
CS3
DH.
DOPDO
DV7
EBS
EJD
ESX
FHBDP
GROUPED_SAGE_PREMIER_JOURNAL_COLLECTION
H13
I-F
IL9
J8X
K.F
MET
MV1
O9-
Q1R
ROL
SASJQ
SAUOL
SCNPE
SFC
SPV
TUS
ZPPRI
ZRKOI
AAYXX
AJGYC
CITATION
ID FETCH-LOGICAL-c284t-a7b6a4ecd4be119a121771a76bde0d33716e1d30ee0fba1d8e825af787ba6f83
ISSN 1369-4332
IngestDate Thu Apr 24 23:08:46 EDT 2025
Tue Jul 01 05:25:35 EDT 2025
Tue Jun 17 22:29:37 EDT 2025
IsPeerReviewed true
IsScholarly true
Issue 13
Keywords fatigue stress spectrum
crack
corrosion
prestressed concrete bridge
stochastic traffic load
fatigue reliability
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c284t-a7b6a4ecd4be119a121771a76bde0d33716e1d30ee0fba1d8e825af787ba6f83
ORCID 0000-0003-1767-8806
PageCount 9
ParticipantIDs crossref_citationtrail_10_1177_13694332211017995
crossref_primary_10_1177_13694332211017995
sage_journals_10_1177_13694332211017995
ProviderPackageCode CITATION
AAYXX
PublicationCentury 2000
PublicationDate 20211000
2021-10-00
PublicationDateYYYYMMDD 2021-10-01
PublicationDate_xml – month: 10
  year: 2021
  text: 20211000
PublicationDecade 2020
PublicationPlace London, England
PublicationPlace_xml – name: London, England
PublicationTitle Advances in structural engineering
PublicationYear 2021
Publisher SAGE Publications
Publisher_xml – name: SAGE Publications
References Yan, Luo, Lu 2017; 22
Zhang, Cai, Pan 2013; 18
Yan, Luo, Yuan 2017; 9
Feng, Song, Zhang 2006; 27
Lan, Bai, Yang 2018; 111
2005
Han, Song, Wang 2014; 17
Miner 1945; 12
2003
2002
Lu, Liu, Deng 2019; 19
Lu, Noori, Liu 2017; 22
Helmerich, Kühn, Nussbaumer 2007; 3
Zhu, Zhang 2018; 166
Han, Li, Cai 2020; 25
Gehlen, Osterminski, Weirich 2016; 17
Lu, Ma, Liu 2019; 19
Chen, Xu, Yan 2015; 11
Zhang, Yuan 2014; 71
Lee, Cho 2016; 16
2017
Wirsching 1984; 110
2015
1980
Wang, Liu, Huang 2005; 10
Cui, Zhang, Luo 2018; 111
Garbatov, Soares, Parunov 2014; 59
Mao, Wang, Li 2019; 24
Zhang, Song, Gu 2012; 34
bibr1-13694332211017995
bibr17-13694332211017995
bibr27-13694332211017995
bibr24-13694332211017995
bibr11-13694332211017995
bibr14-13694332211017995
bibr6-13694332211017995
bibr9-13694332211017995
bibr12-13694332211017995
bibr19-13694332211017995
bibr22-13694332211017995
bibr25-13694332211017995
bibr18-13694332211017995
bibr5-13694332211017995
bibr15-13694332211017995
bibr32-13694332211017995
American Association of State Highway and Transportation Officials (bibr2-13694332211017995) 2012
bibr30-13694332211017995
bibr20-13694332211017995
bibr10-13694332211017995
Yan D (bibr28-13694332211017995) 2017; 9
bibr26-13694332211017995
bibr13-13694332211017995
Feng X (bibr8-13694332211017995) 2006; 27
bibr29-13694332211017995
bibr23-13694332211017995
Chen WZ (bibr4-13694332211017995) 2015; 11
bibr3-13694332211017995
bibr31-13694332211017995
Kuang A (bibr16-13694332211017995) 2010
bibr21-13694332211017995
bibr7-13694332211017995
References_xml – year: 1980
  article-title: Steel, concrete and composite bridges, Part 10: Code of practice for fatigue
– volume: 17
  start-page: 179
  issue: 2
  year: 2014
  end-page: 196
  article-title: Steel stress redistribution and fatigue life estimation of partially prestressed concrete beams under fatigue loading
  publication-title: Advances in Structural Engineering
– volume: 3
  start-page: 245
  issue: 3
  year: 2007
  end-page: 255
  article-title: Assessment of existing steel structures. A guideline for estimation of the remaining fatigue life
  publication-title: Structure and Infrastructure Engineering
– volume: 110
  start-page: 2340
  issue: 10
  year: 1984
  end-page: 2356
  article-title: Fatigue reliability for offshore structures
  publication-title: Journal of Structural Engineering
– volume: 22
  start-page: 04016105
  issue: 1
  year: 2017
  article-title: Fatigue reliability assessment of welded steel bridge decks under stochastic truck loads via machine learning
  publication-title: Journal of Bridge Engineering
– volume: 10
  start-page: 12
  issue: 1
  year: 2005
  end-page: 20
  article-title: Truck loading and fatigue damage analysis for girder bridges based on weigh-in-motion data
  publication-title: Journal of Bridge Engineering
– volume: 59
  start-page: 137
  year: 2014
  end-page: 144
  article-title: Fatigue strength experiments of corroded small scale steel specimens
  publication-title: International Journal of Fatigue
– year: 2017
  article-title: Code for design on steel structure of railway bridge
– volume: 166
  start-page: 274
  year: 2018
  end-page: 285
  article-title: Probabilistic fatigue damage assessment of coastal slender bridges under coupled dynamic loads
  publication-title: Engineering Structures
– volume: 25
  start-page: 04020003
  issue: 3
  year: 2020
  article-title: Fatigue reliability assessment of long-span steel-truss suspension bridges under the combined action of random traffic and wind loads
  publication-title: Journal of Bridge Engineering
– year: 2015
  article-title: Specification for design of highway steel bridge
– volume: 12
  start-page: 159
  issue: 3
  year: 1945
  end-page: 164
  article-title: Cumulative damage in fatigue
  publication-title: Journal of Applied Mechanics
– volume: 71
  start-page: 128
  year: 2014
  end-page: 136
  article-title: Corrosion fatigue effects on life estimation of deteriorated bridges under vehicle impacts
  publication-title: Engineering Structures
– volume: 9
  start-page: 1
  issue: 1
  year: 2017
  end-page: 10
  article-title: Lifetime fatigue reliability evaluation of short to medium span bridges under site-specific stochastic truck loading
  publication-title: Advances in Mechanical Engineering
– volume: 34
  start-page: 409
  year: 2012
  end-page: 417
  article-title: Tensile and fatigue behavior of corroded rebars
  publication-title: Construction Building and Materials
– volume: 11
  start-page: 322
  issue: 3
  year: 2015
  end-page: 333
  article-title: Fatigue load model for highway bridges in heavily loaded areas of China
  publication-title: Advanced Steel Construction
– volume: 111
  start-page: 151
  year: 2018
  end-page: 160
  article-title: Fatigue reliability evaluation of deck-to-rib welded joints in OSD considering stochastic traffic load and welding residual stress
  publication-title: International Journal of Fatigue
– volume: 16
  start-page: 317
  issue: 3
  year: 2016
  article-title: SHM-based probabilistic fatigue life prediction for bridges based on FE model updating
  publication-title: Sensors
– volume: 19
  start-page: 5056
  issue: 22
  year: 2019
  article-title: Evaluating probabilistic traffic load effects on large bridges using long-term traffic monitoring data
  publication-title: Sensors
– volume: 17
  start-page: 329
  issue: 3
  year: 2016
  end-page: 337
  article-title: High-cycle fatigue behavior of reinforcing steel under the effect of ongoing corrosion
  publication-title: Structural Concrete
– volume: 24
  start-page: 05018015
  issue: 1
  year: 2019
  article-title: Fatigue reliability assessment of a long-span cable-stayed bridge based on one-year monitoring strain data
  publication-title: Journal of Bridge Engineering
– volume: 22
  issue: 12
  year: 2017
  article-title: Fatigue stress spectra and reliability evaluation of short-to medium-span bridges under stochastic and dynamic traffic loads
  publication-title: Journal of Bridge Engineering
– year: 2003
  article-title: Actions on structures–part 2: Traffic loads on bridges
– volume: 111
  start-page: 134
  year: 2018
  end-page: 143
  article-title: Weibull modeling of the fatigue life for steel rebar considering corrosion effects
  publication-title: International Journal of Fatigue
– year: 2005
  article-title: Design of steel structures-part 1-9: Fatigue
– volume: 19
  start-page: 181
  issue: 1
  year: 2019
  end-page: 192
  article-title: Fatigue reliability evaluation of orthotropic steel bridge decks based on site-specific weigh-in-motion measurements
  publication-title: International Journal of Steel Structures
– volume: 27
  start-page: 94
  issue: 2
  year: 2006
  end-page: 99
  article-title: Experimental study on stress redistribution of reinforcing steel in prestressed concrete beams under fatigue loading
  publication-title: Journal of Building Structures
– year: 2002
  article-title: Building code requirements for structural concrete
– volume: 18
  start-page: 735
  issue: 8
  year: 2013
  end-page: 747
  article-title: Fatigue reliability assessment for long-span bridges under combined dynamic loads from winds and vehicles
  publication-title: Journal of Bridge Engineering
– ident: bibr18-13694332211017995
  doi: 10.3390/s16030317
– ident: bibr19-13694332211017995
  doi: 10.1007/s13296-018-0109-8
– volume: 11
  start-page: 322
  issue: 3
  year: 2015
  ident: bibr4-13694332211017995
  publication-title: Advanced Steel Construction
– ident: bibr17-13694332211017995
  doi: 10.1016/j.ijfatigue.2018.02.009
– ident: bibr24-13694332211017995
– ident: bibr26-13694332211017995
  doi: 10.1061/(ASCE)0733-9445(1984)110:10(2340)
– ident: bibr22-13694332211017995
  doi: 10.1061/(ASCE)BE.1943-5592.0001337
– volume: 9
  start-page: 1
  issue: 1
  year: 2017
  ident: bibr28-13694332211017995
  publication-title: Advances in Mechanical Engineering
– ident: bibr23-13694332211017995
  doi: 10.1115/1.4009458
– volume-title: AASHTO LRFD Bridge Design Specifications
  year: 2012
  ident: bibr2-13694332211017995
– ident: bibr27-13694332211017995
  doi: 10.1061/(ASCE)BE.1943-5592.0001137
– ident: bibr7-13694332211017995
– ident: bibr21-13694332211017995
  doi: 10.1061/(ASCE)BE.1943-5592.0000982
– ident: bibr25-13694332211017995
  doi: 10.1061/(ASCE)1084-0702(2005)10:1(12)
– ident: bibr20-13694332211017995
  doi: 10.3390/s19225056
– ident: bibr14-13694332211017995
  doi: 10.1080/15732470500365562
– ident: bibr15-13694332211017995
– ident: bibr5-13694332211017995
  doi: 10.1016/j.ijfatigue.2018.02.021
– ident: bibr10-13694332211017995
  doi: 10.1002/suco.201500094
– ident: bibr13-13694332211017995
  doi: 10.1061/(ASCE)BE.1943-5592.0001525
– ident: bibr11-13694332211017995
– ident: bibr30-13694332211017995
  doi: 10.1016/j.conbuildmat.2012.02.071
– ident: bibr3-13694332211017995
– volume-title: The research on problems of highway passenger station information
  year: 2010
  ident: bibr16-13694332211017995
– ident: bibr1-13694332211017995
– ident: bibr6-13694332211017995
– volume: 27
  start-page: 94
  issue: 2
  year: 2006
  ident: bibr8-13694332211017995
  publication-title: Journal of Building Structures
– ident: bibr29-13694332211017995
  doi: 10.1061/(ASCE)BE.1943-5592.0000411
– ident: bibr12-13694332211017995
  doi: 10.1260/1369-4332.17.2.179
– ident: bibr32-13694332211017995
  doi: 10.1016/j.engstruct.2018.03.073
– ident: bibr9-13694332211017995
  doi: 10.1016/j.ijfatigue.2013.09.005
– ident: bibr31-13694332211017995
  doi: 10.1016/j.engstruct.2014.04.004
SSID ssj0012771
Score 2.4889677
Snippet Fatigue damage accumulation is a critical factor resulting in the failure of prestressed concrete (PC) bridges. The fatigue damage is usually caused by the...
SourceID crossref
sage
SourceType Enrichment Source
Index Database
Publisher
StartPage 3021
Title Fatigue reliability evaluation of aging prestressed concrete bridge accounting for stochastic traffic loading and resistance degradation
URI https://journals.sagepub.com/doi/full/10.1177/13694332211017995
Volume 24
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1LbxMxELZCeoED4ilKW-QDEhLVovV6n8eWEkVIcApS4RL5MW4jVQlSswf6C_qn-G-MH1kbJaDCZZO17F3tzrfjGXvmG0Jel8rIrjFNVrWFzsq2FlkrdJUZibNlVxmpHUnSp8_19Ev58bw6H41-JlFL_Vq-Uzc780r-R6rYhnK1WbL_INnhotiA_1G-eEQJ4_FOMp7g70XvCp8sPN_2j4S-223xX_hsc_A5IWBz2JZoKK7hOKRqiVguwkYcoi2oLoUlb7bVIyy_xPHVysXZ-0h0uLYGp9UG2tJM6CjYDZWtDypwYbaenNYRe0DkPRxigHq3TPu1jwD9dgle90z7xdaS9lTYOttx-KJ3w0VoCksXBRuC4NI9s52rk4zXnU3m8ooaXJulGEZ3N-jmoLx9AvYGpDxRxTz3qddhWsfTbveU4Tat7Q3t_aw_7Ejy4vw4RC2G3vOtvvfIXoFeSjEmeyenZ6eTYRsLW0Pin3-asK1uGb-2LvKbYZREFTpDZ_aIPAweCj3xcHtMRrB8Qh4kvJVPyW0AHk2ARyPw6MpQBzyaAI9ugEc98GgEHkXg0Qg8GoBHA_AoAo9G4NEEeM_IbPJh9n6ahZIemUI7aJ2JRtaiBKVLCYx1gqFH3DDR1FJDrjlH7x2Y5jlAbqRguoW2qITBWUWK2rT8ORkvV0t4QahUVZurVjGQCp1uEMAk5xVUTWF4V4p9km9e51wFuntbdeVqzgLD_ZYE9snbYch3z_Xyt85vrIzmQR1c_7nnyzv3PCD342dySMb4kcIR2rxr-Sog6xc7bKr6
linkProvider EBSCOhost
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Fatigue+reliability+evaluation+of+aging+prestressed+concrete+bridge+accounting+for+stochastic+traffic+loading+and+resistance+degradation&rft.jtitle=Advances+in+structural+engineering&rft.au=Luo%2C+Yuan&rft.au=Zheng%2C+Hui&rft.au=Zhang%2C+Haiping&rft.au=Liu%2C+Yang&rft.date=2021-10-01&rft.pub=SAGE+Publications&rft.issn=1369-4332&rft.eissn=2048-4011&rft.volume=24&rft.issue=13&rft.spage=3021&rft.epage=3029&rft_id=info:doi/10.1177%2F13694332211017995&rft.externalDocID=10.1177_13694332211017995
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1369-4332&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1369-4332&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1369-4332&client=summon