Transient processes and optimization of HPP hydraulic structures
In the scope of Hoabinh HPP extension an additional powerhouse is being designed on the common reservoir with two units 240 MW each and two pressure tunnels 765-785 m long. Due to unfavorable geological conditions the design organization made the decision to abandon the construction of the compensat...
Saved in:
Published in | IOP conference series. Materials Science and Engineering Vol. 869; no. 7; pp. 72052 - 72059 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Bristol
IOP Publishing
01.06.2020
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Be the first to leave a comment!