Transient processes and optimization of HPP hydraulic structures

In the scope of Hoabinh HPP extension an additional powerhouse is being designed on the common reservoir with two units 240 MW each and two pressure tunnels 765-785 m long. Due to unfavorable geological conditions the design organization made the decision to abandon the construction of the compensat...