VALIDATION AND PERFORMANCE OF THE LHC CRYOGENIC SYSTEM THROUGH COMMISSIONING OF THE FIRST SECTOR

The cryogenic system [1] for the Large Hadron Collider accelerator is presently in its final phase of commissioning at nominal operating conditions. The refrigeration capacity for the LHC is produced using eight large cryogenic plants and eight 1.8 K refrigeration units installed on five cryogenic i...

Full description

Saved in:
Bibliographic Details
Published inAdvances in Cryogenic Engineering; Volume 53B Vol. 53B (985); pp. 1411 - 1420
Main Authors Serio, L, Bouillot, A, Casas-Cubillos, J, Chakravarty, A, Claudet, S, Gicquel, F, Gomes, P, Kumar, M, Kush, P K, Millet, F, Perin, A, Rabehl, R, Singh, M R, Soubiran, M, Tavian, L
Format Journal Article
LanguageEnglish
Published 01.01.2008
Online AccessGet full text

Cover

Loading…