APA (7th ed.) Citation

Yuqi, J., An, A., Lu, Z., Ping, H., & Xiaomei, L. (2025). Short-term load forecasting based on temporal importance analysis and feature extraction. Electric power systems research, 244, 111551. https://doi.org/10.1016/j.epsr.2025.111551

Chicago Style (17th ed.) Citation

Yuqi, Ji, An An, Zhang Lu, He Ping, and Liu Xiaomei. "Short-term Load Forecasting Based on Temporal Importance Analysis and Feature Extraction." Electric Power Systems Research 244 (2025): 111551. https://doi.org/10.1016/j.epsr.2025.111551.

MLA (9th ed.) Citation

Yuqi, Ji, et al. "Short-term Load Forecasting Based on Temporal Importance Analysis and Feature Extraction." Electric Power Systems Research, vol. 244, 2025, p. 111551, https://doi.org/10.1016/j.epsr.2025.111551.

Warning: These citations may not always be 100% accurate.