SMART DELAY PREDICTION: SUPERVISED MACHINE LEARNING SOLUTIONS FOR CONSTRUCTION PROJECTS

With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable, remain a contemporary issue all over the globe. Conventional techniques for predicting delays often do not deliver concrete predictions due to t...

Full description

Saved in:
Bibliographic Details
Published inJournal of mechanics of continua and mathematical sciences Vol. 20; no. 6; pp. 154 - 167
Main Authors Sahu, Pramodini, Bera, Dillip Kumar, Parhi, Pravat Kumar, Kandpal, Meenakshi
Format Journal Article
LanguageEnglish
Published Institute of Mechanics of Continua and Mathematical Sciences 01.06.2025
Subjects
Online AccessGet full text

Cover

Loading…
Abstract With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable, remain a contemporary issue all over the globe. Conventional techniques for predicting delays often do not deliver concrete predictions due to the multiplicity and dynamic character of construction tasks. In the study discussed here, different machine learning (ML) algorithms were investigated to foresee construction delays, and these include Gaussian Naïve Bayes, Adaboost, Logistic Regression, Gradient Boosting (GB), Random Forest (RF), Decision Tree (DT) and Extreme Gradient Boosting (XGBoost). These models were measured for performance using various metrics such as accuracy, precision, recall, and F1 score to assess their validity in real-life situations. The results indicate that the use of ensemble learning techniques such as Random Forest (RF), and XGBoost scores higher than others, thus exhibiting more accuracy and better predictive capacity. These can relate to convoluted relationships in construction data, which makes them suitable for yet another application in project risk management. In contrast, simpler models like Adaboost and Gaussian Naïve Bayes, despite being interpretable, held lesser predictive accuracy and hence were less qualified for construction delay forecasting. The study highlights the potential of ML-driven predictive models in aiding project management timely by enabling timely identification of prospective delays, thereby allowing for proactive decision-making and project control. Hence, hurdles like quality of data, interpretability of models, and integration with real-time project management systems ought to be surmounted for wide-scale adoption in the industry. Future studies ought to develop hybrid ML models that fit in explainable AI techniques and real-time data on construction applications to assure predictive accuracy and usability in practice. The findings show that ensemble-based delay prediction models have the potential to reduce the uncertainties related to projects, control delays, schedule resources efficiently, and ultimately improve the infrastructure project efficiency in costing and timely project completion.
AbstractList With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable, remain a contemporary issue all over the globe. Conventional techniques for predicting delays often do not deliver concrete predictions due to the multiplicity and dynamic character of construction tasks. In the study discussed here, different machine learning (ML) algorithms were investigated to foresee construction delays, and these include Gaussian Naïve Bayes, Adaboost, Logistic Regression, Gradient Boosting (GB), Random Forest (RF), Decision Tree (DT) and Extreme Gradient Boosting (XGBoost). These models were measured for performance using various metrics such as accuracy, precision, recall, and F1 score to assess their validity in real-life situations. The results indicate that the use of ensemble learning techniques such as Random Forest (RF), and XGBoost scores higher than others, thus exhibiting more accuracy and better predictive capacity. These can relate to convoluted relationships in construction data, which makes them suitable for yet another application in project risk management. In contrast, simpler models like Adaboost and Gaussian Naïve Bayes, despite being interpretable, held lesser predictive accuracy and hence were less qualified for construction delay forecasting. The study highlights the potential of ML-driven predictive models in aiding project management timely by enabling timely identification of prospective delays, thereby allowing for proactive decision-making and project control. Hence, hurdles like quality of data, interpretability of models, and integration with real-time project management systems ought to be surmounted for wide-scale adoption in the industry. Future studies ought to develop hybrid ML models that fit in explainable AI techniques and real-time data on construction applications to assure predictive accuracy and usability in practice. The findings show that ensemble-based delay prediction models have the potential to reduce the uncertainties related to projects, control delays, schedule resources efficiently, and ultimately improve the infrastructure project efficiency in costing and timely project completion.
Author Parhi, Pravat Kumar
Bera, Dillip Kumar
Sahu, Pramodini
Kandpal, Meenakshi
Author_xml – sequence: 1
  givenname: Pramodini
  surname: Sahu
  fullname: Sahu, Pramodini
– sequence: 2
  givenname: Dillip Kumar
  surname: Bera
  fullname: Bera, Dillip Kumar
– sequence: 3
  givenname: Pravat Kumar
  surname: Parhi
  fullname: Parhi, Pravat Kumar
– sequence: 4
  givenname: Meenakshi
  surname: Kandpal
  fullname: Kandpal, Meenakshi
BookMark eNo9kM1Og0AUhSdGE2vtG7jgBcA7PzCMO0Jpi6HQ8KNxNRmGwbRpiwE3vr2UGlf35Oacb_E9oNtzdzYIPWFwiMd98nw46dPgECCuA54DABhu0Iwwl9kcC7hFMxCc2r7g7j1aDMNhrFCKqYfZDL0X2yAvrWWUBB_WLo-WcVjGWfpiFdUuyt_iIlpa2yDcxGlkJVGQp3G6toosqS6twlpluRWOocyraTcistcoLItHdNeq42AWf3eOqlVUhhs7ydZxGCS2JkSALahqtTaUg-HGU4yZhtasrnGLWQ21MrhuOfEbypTgTUMaozVTtd8aQRrRcDpH8ZXbdOogv_r9SfU_slN7OT26_lOq_nuvj0ZSQxlzsamBUMa18A14TI3asOeB5mxksStL990w9Kb952GQk2s5uZYX1xI8Obmmv6gTbfo
ContentType Journal Article
DBID AAYXX
CITATION
DOA
DOI 10.26782/jmcms.2025.06.00010
DatabaseName CrossRef
DOAJ Directory of Open Access Journals
DatabaseTitle CrossRef
DatabaseTitleList CrossRef

Database_xml – sequence: 1
  dbid: DOA
  name: DOAJ Directory of Open Access Journals
  url: https://www.doaj.org/
  sourceTypes: Open Website
DeliveryMethod fulltext_linktorsrc
EISSN 2454-7190
EndPage 167
ExternalDocumentID oai_doaj_org_article_3e34451eb02347c98e064a0251660c74
10_26782_jmcms_2025_06_00010
GroupedDBID AAYXX
ALMA_UNASSIGNED_HOLDINGS
CITATION
GROUPED_DOAJ
ID FETCH-LOGICAL-c2290-93afcce370e7e6a44ed3b4bb1f14b0bae1bf728d34a97dd2decc4ab8fe92d9d73
IEDL.DBID DOA
ISSN 0973-8975
IngestDate Wed Aug 27 01:15:46 EDT 2025
Thu Jul 03 08:41:12 EDT 2025
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 6
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c2290-93afcce370e7e6a44ed3b4bb1f14b0bae1bf728d34a97dd2decc4ab8fe92d9d73
OpenAccessLink https://doaj.org/article/3e34451eb02347c98e064a0251660c74
PageCount 14
ParticipantIDs doaj_primary_oai_doaj_org_article_3e34451eb02347c98e064a0251660c74
crossref_primary_10_26782_jmcms_2025_06_00010
PublicationCentury 2000
PublicationDate 2025-06-01
PublicationDateYYYYMMDD 2025-06-01
PublicationDate_xml – month: 06
  year: 2025
  text: 2025-06-01
  day: 01
PublicationDecade 2020
PublicationTitle Journal of mechanics of continua and mathematical sciences
PublicationYear 2025
Publisher Institute of Mechanics of Continua and Mathematical Sciences
Publisher_xml – name: Institute of Mechanics of Continua and Mathematical Sciences
SSID ssj0003313614
Score 2.2933514
Snippet With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable,...
SourceID doaj
crossref
SourceType Open Website
Index Database
StartPage 154
SubjectTerms adaboost
construction delay
decision tree
gaussian naïve bayes
gradient boosting
logistic regression
random forest
xgboost
Title SMART DELAY PREDICTION: SUPERVISED MACHINE LEARNING SOLUTIONS FOR CONSTRUCTION PROJECTS
URI https://doaj.org/article/3e34451eb02347c98e064a0251660c74
Volume 20
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV09T8MwELVQJxYEAkT5kgdWq4ntxDFbaFMa1A_UNFCmyI6dAakFofL_OTsFlYmFLYocy3rn3L2T7t4hdAOkIATiYAnXUUK4Yhr8YKCJYokGfq4TGbpu5Mk0HpX8YRktd0Z9uZqwVh64Ba7HLHMaWlZDcOGilomFIKocM47joBZeCRRi3k4y5XwwYyGLW2FvKRhJpIjavjkKzpn2Xlf1yml108iLd7rE6Fdc2pHv93FmeIgOtgQRp-3BjtCeXR-j52ICxBMPsnH6ggG0Qe5rP25xUT5m86e8yAZ4kvZH-TTD4yydT_PpPS5m49I3CWPI9HAfHhbz0n8HW8zcmJPiBJXDbNEfke1IBFI7YXYimWrq2jIRWGFjxbk1THOtwybkOtDKhroRNDGMKymMoQYsxJVOGiupkUawU9RZv63tGcJuyAbTivJIOoEdCgsaLljc8NoY-NW7iHwDUr23yhcVZAwewMoDWDkAK18XBwB20Z1D7Wet0632L8Ca1daa1V_WPP-PTS7QvjtZW9B1iTqbj097BdRho6_9LfkCqw60dg
linkProvider Directory of Open Access Journals
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=SMART+DELAY+PREDICTION%3A+SUPERVISED+MACHINE+LEARNING+SOLUTIONS+FOR+CONSTRUCTION+PROJECTS&rft.jtitle=Journal+of+mechanics+of+continua+and+mathematical+sciences&rft.au=Sahu%2C+Pramodini&rft.au=Bera%2C+Dillip+Kumar&rft.au=Parhi%2C+Pravat+Kumar&rft.au=Kandpal%2C+Meenakshi&rft.date=2025-06-01&rft.issn=0973-8975&rft.eissn=2454-7190&rft.volume=20&rft.issue=6&rft_id=info:doi/10.26782%2Fjmcms.2025.06.00010&rft.externalDBID=n%2Fa&rft.externalDocID=10_26782_jmcms_2025_06_00010
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0973-8975&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0973-8975&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0973-8975&client=summon