SMART DELAY PREDICTION: SUPERVISED MACHINE LEARNING SOLUTIONS FOR CONSTRUCTION PROJECTS
With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable, remain a contemporary issue all over the globe. Conventional techniques for predicting delays often do not deliver concrete predictions due to t...
Saved in:
Published in | Journal of mechanics of continua and mathematical sciences Vol. 20; no. 6; pp. 154 - 167 |
---|---|
Main Authors | , , , |
Format | Journal Article |
Language | English |
Published |
Institute of Mechanics of Continua and Mathematical Sciences
01.06.2025
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable, remain a contemporary issue all over the globe. Conventional techniques for predicting delays often do not deliver concrete predictions due to the multiplicity and dynamic character of construction tasks. In the study discussed here, different machine learning (ML) algorithms were investigated to foresee construction delays, and these include Gaussian Naïve Bayes, Adaboost, Logistic Regression, Gradient Boosting (GB), Random Forest (RF), Decision Tree (DT) and Extreme Gradient Boosting (XGBoost). These models were measured for performance using various metrics such as accuracy, precision, recall, and F1 score to assess their validity in real-life situations. The results indicate that the use of ensemble learning techniques such as Random Forest (RF), and XGBoost scores higher than others, thus exhibiting more accuracy and better predictive capacity. These can relate to convoluted relationships in construction data, which makes them suitable for yet another application in project risk management. In contrast, simpler models like Adaboost and Gaussian Naïve Bayes, despite being interpretable, held lesser predictive accuracy and hence were less qualified for construction delay forecasting. The study highlights the potential of ML-driven predictive models in aiding project management timely by enabling timely identification of prospective delays, thereby allowing for proactive decision-making and project control. Hence, hurdles like quality of data, interpretability of models, and integration with real-time project management systems ought to be surmounted for wide-scale adoption in the industry. Future studies ought to develop hybrid ML models that fit in explainable AI techniques and real-time data on construction applications to assure predictive accuracy and usability in practice. The findings show that ensemble-based delay prediction models have the potential to reduce the uncertainties related to projects, control delays, schedule resources efficiently, and ultimately improve the infrastructure project efficiency in costing and timely project completion. |
---|---|
AbstractList | With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable, remain a contemporary issue all over the globe. Conventional techniques for predicting delays often do not deliver concrete predictions due to the multiplicity and dynamic character of construction tasks. In the study discussed here, different machine learning (ML) algorithms were investigated to foresee construction delays, and these include Gaussian Naïve Bayes, Adaboost, Logistic Regression, Gradient Boosting (GB), Random Forest (RF), Decision Tree (DT) and Extreme Gradient Boosting (XGBoost). These models were measured for performance using various metrics such as accuracy, precision, recall, and F1 score to assess their validity in real-life situations. The results indicate that the use of ensemble learning techniques such as Random Forest (RF), and XGBoost scores higher than others, thus exhibiting more accuracy and better predictive capacity. These can relate to convoluted relationships in construction data, which makes them suitable for yet another application in project risk management. In contrast, simpler models like Adaboost and Gaussian Naïve Bayes, despite being interpretable, held lesser predictive accuracy and hence were less qualified for construction delay forecasting. The study highlights the potential of ML-driven predictive models in aiding project management timely by enabling timely identification of prospective delays, thereby allowing for proactive decision-making and project control. Hence, hurdles like quality of data, interpretability of models, and integration with real-time project management systems ought to be surmounted for wide-scale adoption in the industry. Future studies ought to develop hybrid ML models that fit in explainable AI techniques and real-time data on construction applications to assure predictive accuracy and usability in practice. The findings show that ensemble-based delay prediction models have the potential to reduce the uncertainties related to projects, control delays, schedule resources efficiently, and ultimately improve the infrastructure project efficiency in costing and timely project completion. |
Author | Parhi, Pravat Kumar Bera, Dillip Kumar Sahu, Pramodini Kandpal, Meenakshi |
Author_xml | – sequence: 1 givenname: Pramodini surname: Sahu fullname: Sahu, Pramodini – sequence: 2 givenname: Dillip Kumar surname: Bera fullname: Bera, Dillip Kumar – sequence: 3 givenname: Pravat Kumar surname: Parhi fullname: Parhi, Pravat Kumar – sequence: 4 givenname: Meenakshi surname: Kandpal fullname: Kandpal, Meenakshi |
BookMark | eNo9kM1Og0AUhSdGE2vtG7jgBcA7PzCMO0Jpi6HQ8KNxNRmGwbRpiwE3vr2UGlf35Oacb_E9oNtzdzYIPWFwiMd98nw46dPgECCuA54DABhu0Iwwl9kcC7hFMxCc2r7g7j1aDMNhrFCKqYfZDL0X2yAvrWWUBB_WLo-WcVjGWfpiFdUuyt_iIlpa2yDcxGlkJVGQp3G6toosqS6twlpluRWOocyraTcistcoLItHdNeq42AWf3eOqlVUhhs7ydZxGCS2JkSALahqtTaUg-HGU4yZhtasrnGLWQ21MrhuOfEbypTgTUMaozVTtd8aQRrRcDpH8ZXbdOogv_r9SfU_slN7OT26_lOq_nuvj0ZSQxlzsamBUMa18A14TI3asOeB5mxksStL990w9Kb952GQk2s5uZYX1xI8Obmmv6gTbfo |
ContentType | Journal Article |
DBID | AAYXX CITATION DOA |
DOI | 10.26782/jmcms.2025.06.00010 |
DatabaseName | CrossRef DOAJ Directory of Open Access Journals |
DatabaseTitle | CrossRef |
DatabaseTitleList | CrossRef |
Database_xml | – sequence: 1 dbid: DOA name: DOAJ Directory of Open Access Journals url: https://www.doaj.org/ sourceTypes: Open Website |
DeliveryMethod | fulltext_linktorsrc |
EISSN | 2454-7190 |
EndPage | 167 |
ExternalDocumentID | oai_doaj_org_article_3e34451eb02347c98e064a0251660c74 10_26782_jmcms_2025_06_00010 |
GroupedDBID | AAYXX ALMA_UNASSIGNED_HOLDINGS CITATION GROUPED_DOAJ |
ID | FETCH-LOGICAL-c2290-93afcce370e7e6a44ed3b4bb1f14b0bae1bf728d34a97dd2decc4ab8fe92d9d73 |
IEDL.DBID | DOA |
ISSN | 0973-8975 |
IngestDate | Wed Aug 27 01:15:46 EDT 2025 Thu Jul 03 08:41:12 EDT 2025 |
IsDoiOpenAccess | true |
IsOpenAccess | true |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 6 |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c2290-93afcce370e7e6a44ed3b4bb1f14b0bae1bf728d34a97dd2decc4ab8fe92d9d73 |
OpenAccessLink | https://doaj.org/article/3e34451eb02347c98e064a0251660c74 |
PageCount | 14 |
ParticipantIDs | doaj_primary_oai_doaj_org_article_3e34451eb02347c98e064a0251660c74 crossref_primary_10_26782_jmcms_2025_06_00010 |
PublicationCentury | 2000 |
PublicationDate | 2025-06-01 |
PublicationDateYYYYMMDD | 2025-06-01 |
PublicationDate_xml | – month: 06 year: 2025 text: 2025-06-01 day: 01 |
PublicationDecade | 2020 |
PublicationTitle | Journal of mechanics of continua and mathematical sciences |
PublicationYear | 2025 |
Publisher | Institute of Mechanics of Continua and Mathematical Sciences |
Publisher_xml | – name: Institute of Mechanics of Continua and Mathematical Sciences |
SSID | ssj0003313614 |
Score | 2.2933514 |
Snippet | With construction project delays being a key factor influencing their financial sinews, issues related to contract law, thus rendering resources incapable,... |
SourceID | doaj crossref |
SourceType | Open Website Index Database |
StartPage | 154 |
SubjectTerms | adaboost construction delay decision tree gaussian naïve bayes gradient boosting logistic regression random forest xgboost |
Title | SMART DELAY PREDICTION: SUPERVISED MACHINE LEARNING SOLUTIONS FOR CONSTRUCTION PROJECTS |
URI | https://doaj.org/article/3e34451eb02347c98e064a0251660c74 |
Volume | 20 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV09T8MwELVQJxYEAkT5kgdWq4ntxDFbaFMa1A_UNFCmyI6dAakFofL_OTsFlYmFLYocy3rn3L2T7t4hdAOkIATiYAnXUUK4Yhr8YKCJYokGfq4TGbpu5Mk0HpX8YRktd0Z9uZqwVh64Ba7HLHMaWlZDcOGilomFIKocM47joBZeCRRi3k4y5XwwYyGLW2FvKRhJpIjavjkKzpn2Xlf1yml108iLd7rE6Fdc2pHv93FmeIgOtgQRp-3BjtCeXR-j52ICxBMPsnH6ggG0Qe5rP25xUT5m86e8yAZ4kvZH-TTD4yydT_PpPS5m49I3CWPI9HAfHhbz0n8HW8zcmJPiBJXDbNEfke1IBFI7YXYimWrq2jIRWGFjxbk1THOtwybkOtDKhroRNDGMKymMoQYsxJVOGiupkUawU9RZv63tGcJuyAbTivJIOoEdCgsaLljc8NoY-NW7iHwDUr23yhcVZAwewMoDWDkAK18XBwB20Z1D7Wet0632L8Ca1daa1V_WPP-PTS7QvjtZW9B1iTqbj097BdRho6_9LfkCqw60dg |
linkProvider | Directory of Open Access Journals |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=SMART+DELAY+PREDICTION%3A+SUPERVISED+MACHINE+LEARNING+SOLUTIONS+FOR+CONSTRUCTION+PROJECTS&rft.jtitle=Journal+of+mechanics+of+continua+and+mathematical+sciences&rft.au=Sahu%2C+Pramodini&rft.au=Bera%2C+Dillip+Kumar&rft.au=Parhi%2C+Pravat+Kumar&rft.au=Kandpal%2C+Meenakshi&rft.date=2025-06-01&rft.issn=0973-8975&rft.eissn=2454-7190&rft.volume=20&rft.issue=6&rft_id=info:doi/10.26782%2Fjmcms.2025.06.00010&rft.externalDBID=n%2Fa&rft.externalDocID=10_26782_jmcms_2025_06_00010 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0973-8975&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0973-8975&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0973-8975&client=summon |