Verification of turbine and governor model of hydro generator unit for the purpose of load frequency control system simulation

In this paper, verification of power plant component models is performed by evaluating the deviations between simulation results and test results of the component under study. The obtained deviations of the simulation results from the test results, as well as the acceptability of its value for a par...

Full description

Saved in:
Bibliographic Details
Published inZbornik radova (Elektrotehnički institut "Nikola Tesla" (Belgrade, Serbia)) Vol. 2015; no. 25; pp. 145 - 153
Main Authors Dzepceski, Dane, Georgijevic, Nikola, Pavlovic, Jelena, Arnautovic, Dusan, Lukic, Sanja, Stanojcic, Vladimir, Bogdanovic, Slobodan, Trisic, Dusan, Jovanovic, Boris, Latinovic, Aleksandar
Format Journal Article
LanguageEnglish
Published Electrical Engineering Institute Nikola Tesla 2015
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:In this paper, verification of power plant component models is performed by evaluating the deviations between simulation results and test results of the component under study. The obtained deviations of the simulation results from the test results, as well as the acceptability of its value for a particular model and purpose, are determined in the process of verification. In this paper, the test results, the model and the verification procedure are presented. The basis for the model synthesis and verification are the test results derived from measurements conducted with the aim of deriving the operational performance of hydro unit R2 in PSP 'Bajina Bašta' connected to the load frequency control system.
ISSN:0350-8528
2406-1212
DOI:10.5937/zeint25-9401