Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance...

Full description

Saved in:
Bibliographic Details
Published in东华大学学报(英文版) Vol. 31; no. 6; pp. 744 - 746
Main Author 王文彬 王慧颖 彭锐
Format Journal Article
LanguageEnglish
Published Dongling School of Economics and Management, University of Science and Technology Beijing, Beijing 100083, China 31.12.2014
Subjects
Online AccessGet full text

Cover

Loading…
More Information
Summary:Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance decision needed to be made that whether to replace the defective system immediately or wait till the preset APR time. So a threshold was introduced into the model and called as inspection-based preventive replacement( IPR) threshold. If the distance from the defect identification point to the APR time was longer than the threshold, a preventive replacement( PR) action was made; otherwise PR action was to wait till the APR time. Two models were proposed and compared,and a numerical example was conducted to illustrate the applicability of the model.
Bibliography:31-1920/N
Periodical inspections and an age-based preventive replacement( APR) model were proposed based on a two-stage failure process for a single component system. Inspection activities were performed at regular intervals. Once the system was identified to be at defective state by inspection,a maintenance decision needed to be made that whether to replace the defective system immediately or wait till the preset APR time. So a threshold was introduced into the model and called as inspection-based preventive replacement( IPR) threshold. If the distance from the defect identification point to the APR time was longer than the threshold, a preventive replacement( PR) action was made; otherwise PR action was to wait till the APR time. Two models were proposed and compared,and a numerical example was conducted to illustrate the applicability of the model.
delay-time inspection age-based preventive replacement(APR) inspection-based preventive replacement(IPR) preventive maintenance(PM)
WANG Wen-bin, WANG Hui-ying, PENG Rui Dongling School of Economics and Management, University of Science and Technology Beijing, Beijing 100083, China
ISSN:1672-5220