Study of power and voltage delivery after successfully black-start

Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blacko...

Full description

Saved in:
Bibliographic Details
Published inSinergi (Fakultas Teknologi Industri Univeritas Mercu Buana. Vol. 26; no. 3; pp. 355 - 370
Main Authors Satriawan, Andika Pradnya, Saidah, Saidah, Taufik, Taufik
Format Journal Article
LanguageEnglish
Published Universitas Mercu Buana 08.10.2022
Subjects
Online AccessGet full text

Cover

Loading…
Abstract Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid. 
AbstractList Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid.
Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid. 
Author Taufik, Taufik
Saidah, Saidah
Satriawan, Andika Pradnya
Author_xml – sequence: 1
  givenname: Andika Pradnya
  surname: Satriawan
  fullname: Satriawan, Andika Pradnya
– sequence: 2
  givenname: Saidah
  surname: Saidah
  fullname: Saidah, Saidah
– sequence: 3
  givenname: Taufik
  surname: Taufik
  fullname: Taufik, Taufik
BookMark eNo9kMtOwzAQRS1UJErpF7DJDyR4_EjjJVQ8KlViAayt8atKCU1lp0X5e0ypWI1mrnR051yTya7feUJugVaMCQF3qd35uGkrRhmreEUBLsiUiZqWwGAxIVMQQEvGOVyReUpbSikoRmUDU_LwNhzcWPSh2PffPha4c8Wx7wbc-ML5rj36OBYYhhylg7U-pXDourEwHdrPMg0YhxtyGbBLfn6eM_Lx9Pi-fCnXr8-r5f26tABUlI4byf2CBY9NUD6YxoHNpaQRXGIdRN0gr3mwSkprJTpnTH4ot7Yhbw2fkdUf1_W41fvYfmEcdY-tPh36uNG5TWs7r1VjEB0qNMqLmjFVyyBsw2tnoAElMov_sWzsU4o-_POA6pNVfbaqf61qrrNV_gOFlm8V
ContentType Journal Article
DBID AAYXX
CITATION
DOA
DOI 10.22441/sinergi.2022.3.011
DatabaseName CrossRef
Directory of Open Access Journals
DatabaseTitle CrossRef
DatabaseTitleList
CrossRef
Database_xml – sequence: 1
  dbid: DOA
  name: Directory of Open Access Journals (Open Access)
  url: https://www.doaj.org/
  sourceTypes: Open Website
DeliveryMethod fulltext_linktorsrc
EISSN 2460-1217
EndPage 370
ExternalDocumentID oai_doaj_org_article_98baada9ab9e4622965f4c836db18194
10_22441_sinergi_2022_3_011
GroupedDBID 5VS
AAYXX
ADBBV
ALMA_UNASSIGNED_HOLDINGS
BCNDV
CITATION
GROUPED_DOAJ
KQ8
M~E
OK1
RIG
ID FETCH-LOGICAL-c1104-d3b53e72fea8f9efb8d1c2335b435a6f468a363fc955cc5addbb022331cf5ad83
IEDL.DBID DOA
ISSN 1410-2331
IngestDate Tue Oct 22 15:16:18 EDT 2024
Fri Aug 23 01:53:42 EDT 2024
IsDoiOpenAccess true
IsOpenAccess true
IsPeerReviewed true
IsScholarly true
Issue 3
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c1104-d3b53e72fea8f9efb8d1c2335b435a6f468a363fc955cc5addbb022331cf5ad83
OpenAccessLink https://doaj.org/article/98baada9ab9e4622965f4c836db18194
PageCount 16
ParticipantIDs doaj_primary_oai_doaj_org_article_98baada9ab9e4622965f4c836db18194
crossref_primary_10_22441_sinergi_2022_3_011
PublicationCentury 2000
PublicationDate 2022-10-08
PublicationDateYYYYMMDD 2022-10-08
PublicationDate_xml – month: 10
  year: 2022
  text: 2022-10-08
  day: 08
PublicationDecade 2020
PublicationTitle Sinergi (Fakultas Teknologi Industri Univeritas Mercu Buana.
PublicationYear 2022
Publisher Universitas Mercu Buana
Publisher_xml – name: Universitas Mercu Buana
SSID ssj0001920581
ssib044761024
Score 2.2465208
Snippet Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery...
SourceID doaj
crossref
SourceType Open Website
Aggregation Database
StartPage 355
SubjectTerms black-start
digsilent
grati-paiton substation
Title Study of power and voltage delivery after successfully black-start
URI https://doaj.org/article/98baada9ab9e4622965f4c836db18194
Volume 26
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
link http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1JSwMxFA7SkxdRVKwbOXh02plsMzlasRRBTxZ6C1lBkWlpp4f-e1-SUerJi7eZIQx5C3nfF96C0J3TXjTExAQHyQpmSCikgydRlwLcg5faxeLkl1cxm7PnBV_sjfqKOWG5PXBW3Fg2RmunpTbSM0GIFDww21DhDAQnmTuBlnKPTIEnMQbsvOzrHj4yjil5mlga8xoLQmmVWxBBBGPVeJMK7d6BLhIyoqOyqn6Fqb1u_insTI_RUY8X8UPe5wk68O0pmsTsvx1eBryKQ86wbh2GY6aDswE7_xlTLXY4Tf_Gm22aiBhv2XfYxNu6AvDgujtD8-nT2-Os6IchFBYiNCscNZz6mgSvmyB9MI2rLMjBDQAeLQITjaaCBis5t5bDsWUMSAOC2gBvDT1Hg3bZ-guEAcEBbAikLq1hELBl8NzVQLx88MAO2RDdf8uuVrnnhQKukFSlelWpqCpFFahqiCZRPz9LY8Pq9AHMqHozqr_MePkfP7lCh3FbOUXvGg269dbfAGbozG1yjy8zcbvZ
link.rule.ids 315,783,787,867,2109,27936,27937
linkProvider Directory of Open Access Journals
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Study+of+power+and+voltage+delivery+after+successfully+black-start&rft.jtitle=Sinergi+%28Fakultas+Teknologi+Industri+Univeritas+Mercu+Buana.&rft.au=Satriawan%2C+Andika+Pradnya&rft.au=Saidah%2C+Saidah&rft.au=Taufik%2C+Taufik&rft.date=2022-10-08&rft.issn=1410-2331&rft.eissn=2460-1217&rft.volume=26&rft.issue=3&rft.spage=355&rft_id=info:doi/10.22441%2Fsinergi.2022.3.011&rft.externalDBID=n%2Fa&rft.externalDocID=10_22441_sinergi_2022_3_011
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1410-2331&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1410-2331&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1410-2331&client=summon