Study of power and voltage delivery after successfully black-start
Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blacko...
Saved in:
Published in | Sinergi (Fakultas Teknologi Industri Univeritas Mercu Buana. Vol. 26; no. 3; pp. 355 - 370 |
---|---|
Main Authors | , , |
Format | Journal Article |
Language | English |
Published |
Universitas Mercu Buana
08.10.2022
|
Subjects | |
Online Access | Get full text |
Cover
Loading…
Abstract | Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid. |
---|---|
AbstractList | Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid. Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery process due to disturbances in the electricity distribution system, especially blackouts. The strategy to speed up recovery in a total blackout is to do a black-start on a generator unit with a black-start facility and send voltage to a larger generator unit. At the Grati-Paiton Substation, the generator that has black-start facilities is the Grati Gas Steam Power Plant (GSPP). The delivery of power and voltage from the Grati-Paiton substation is required after the Grati GSPP successfully black-start. Study optimal power flow simulation in distributing power and voltage using DigSILENT software. Based on the simulation results, several schemes are used to distribute power and voltage from the Grati-Paiton substation within the generator’s Mvar. As a result, the voltage during the distribution process meets the criteria according to the Grid. The most optimal scheme is with the least number of stages, the production of Mvar, which is still safe for power generation, and the voltage at the end of the Paiton substation still meets the nominal voltage according to the Grid. |
Author | Taufik, Taufik Saidah, Saidah Satriawan, Andika Pradnya |
Author_xml | – sequence: 1 givenname: Andika Pradnya surname: Satriawan fullname: Satriawan, Andika Pradnya – sequence: 2 givenname: Saidah surname: Saidah fullname: Saidah, Saidah – sequence: 3 givenname: Taufik surname: Taufik fullname: Taufik, Taufik |
BookMark | eNo9kMtOwzAQRS1UJErpF7DJDyR4_EjjJVQ8KlViAayt8atKCU1lp0X5e0ypWI1mrnR051yTya7feUJugVaMCQF3qd35uGkrRhmreEUBLsiUiZqWwGAxIVMQQEvGOVyReUpbSikoRmUDU_LwNhzcWPSh2PffPha4c8Wx7wbc-ML5rj36OBYYhhylg7U-pXDourEwHdrPMg0YhxtyGbBLfn6eM_Lx9Pi-fCnXr8-r5f26tABUlI4byf2CBY9NUD6YxoHNpaQRXGIdRN0gr3mwSkprJTpnTH4ot7Yhbw2fkdUf1_W41fvYfmEcdY-tPh36uNG5TWs7r1VjEB0qNMqLmjFVyyBsw2tnoAElMov_sWzsU4o-_POA6pNVfbaqf61qrrNV_gOFlm8V |
ContentType | Journal Article |
DBID | AAYXX CITATION DOA |
DOI | 10.22441/sinergi.2022.3.011 |
DatabaseName | CrossRef Directory of Open Access Journals |
DatabaseTitle | CrossRef |
DatabaseTitleList | CrossRef |
Database_xml | – sequence: 1 dbid: DOA name: Directory of Open Access Journals (Open Access) url: https://www.doaj.org/ sourceTypes: Open Website |
DeliveryMethod | fulltext_linktorsrc |
EISSN | 2460-1217 |
EndPage | 370 |
ExternalDocumentID | oai_doaj_org_article_98baada9ab9e4622965f4c836db18194 10_22441_sinergi_2022_3_011 |
GroupedDBID | 5VS AAYXX ADBBV ALMA_UNASSIGNED_HOLDINGS BCNDV CITATION GROUPED_DOAJ KQ8 M~E OK1 RIG |
ID | FETCH-LOGICAL-c1104-d3b53e72fea8f9efb8d1c2335b435a6f468a363fc955cc5addbb022331cf5ad83 |
IEDL.DBID | DOA |
ISSN | 1410-2331 |
IngestDate | Tue Oct 22 15:16:18 EDT 2024 Fri Aug 23 01:53:42 EDT 2024 |
IsDoiOpenAccess | true |
IsOpenAccess | true |
IsPeerReviewed | true |
IsScholarly | true |
Issue | 3 |
Language | English |
LinkModel | DirectLink |
MergedId | FETCHMERGED-LOGICAL-c1104-d3b53e72fea8f9efb8d1c2335b435a6f468a363fc955cc5addbb022331cf5ad83 |
OpenAccessLink | https://doaj.org/article/98baada9ab9e4622965f4c836db18194 |
PageCount | 16 |
ParticipantIDs | doaj_primary_oai_doaj_org_article_98baada9ab9e4622965f4c836db18194 crossref_primary_10_22441_sinergi_2022_3_011 |
PublicationCentury | 2000 |
PublicationDate | 2022-10-08 |
PublicationDateYYYYMMDD | 2022-10-08 |
PublicationDate_xml | – month: 10 year: 2022 text: 2022-10-08 day: 08 |
PublicationDecade | 2020 |
PublicationTitle | Sinergi (Fakultas Teknologi Industri Univeritas Mercu Buana. |
PublicationYear | 2022 |
Publisher | Universitas Mercu Buana |
Publisher_xml | – name: Universitas Mercu Buana |
SSID | ssj0001920581 ssib044761024 |
Score | 2.2465208 |
Snippet | Efforts to maintain the continuity of electricity distribution to customers and reduce the amount of Energy Not Distributed (END) are to speed up the recovery... |
SourceID | doaj crossref |
SourceType | Open Website Aggregation Database |
StartPage | 355 |
SubjectTerms | black-start digsilent grati-paiton substation |
Title | Study of power and voltage delivery after successfully black-start |
URI | https://doaj.org/article/98baada9ab9e4622965f4c836db18194 |
Volume | 26 |
hasFullText | 1 |
inHoldings | 1 |
isFullTextHit | |
isPrint | |
link | http://utb.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1JSwMxFA7SkxdRVKwbOXh02plsMzlasRRBTxZ6C1lBkWlpp4f-e1-SUerJi7eZIQx5C3nfF96C0J3TXjTExAQHyQpmSCikgydRlwLcg5faxeLkl1cxm7PnBV_sjfqKOWG5PXBW3Fg2RmunpTbSM0GIFDww21DhDAQnmTuBlnKPTIEnMQbsvOzrHj4yjil5mlga8xoLQmmVWxBBBGPVeJMK7d6BLhIyoqOyqn6Fqb1u_insTI_RUY8X8UPe5wk68O0pmsTsvx1eBryKQ86wbh2GY6aDswE7_xlTLXY4Tf_Gm22aiBhv2XfYxNu6AvDgujtD8-nT2-Os6IchFBYiNCscNZz6mgSvmyB9MI2rLMjBDQAeLQITjaaCBis5t5bDsWUMSAOC2gBvDT1Hg3bZ-guEAcEBbAikLq1hELBl8NzVQLx88MAO2RDdf8uuVrnnhQKukFSlelWpqCpFFahqiCZRPz9LY8Pq9AHMqHozqr_MePkfP7lCh3FbOUXvGg269dbfAGbozG1yjy8zcbvZ |
link.rule.ids | 315,783,787,867,2109,27936,27937 |
linkProvider | Directory of Open Access Journals |
openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Study+of+power+and+voltage+delivery+after+successfully+black-start&rft.jtitle=Sinergi+%28Fakultas+Teknologi+Industri+Univeritas+Mercu+Buana.&rft.au=Satriawan%2C+Andika+Pradnya&rft.au=Saidah%2C+Saidah&rft.au=Taufik%2C+Taufik&rft.date=2022-10-08&rft.issn=1410-2331&rft.eissn=2460-1217&rft.volume=26&rft.issue=3&rft.spage=355&rft_id=info:doi/10.22441%2Fsinergi.2022.3.011&rft.externalDBID=n%2Fa&rft.externalDocID=10_22441_sinergi_2022_3_011 |
thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1410-2331&client=summon |
thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1410-2331&client=summon |
thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1410-2331&client=summon |