Liang, G., Hu, Y., & Li, Q. (2018). Safety Monitoring of High Arch Dams in Initial Operation Period Using Vector Error Correction Model. Rock mechanics and rock engineering, 51(8), 2469-2481. https://doi.org/10.1007/s00603-017-1287-y
Chicago Style (17th ed.) CitationLiang, Guohe, Yu Hu, and Qingbin Li. "Safety Monitoring of High Arch Dams in Initial Operation Period Using Vector Error Correction Model." Rock Mechanics and Rock Engineering 51, no. 8 (2018): 2469-2481. https://doi.org/10.1007/s00603-017-1287-y.
MLA (9th ed.) CitationLiang, Guohe, et al. "Safety Monitoring of High Arch Dams in Initial Operation Period Using Vector Error Correction Model." Rock Mechanics and Rock Engineering, vol. 51, no. 8, 2018, pp. 2469-2481, https://doi.org/10.1007/s00603-017-1287-y.