Vyzkoušejte nový nástroj s podporou AI
Summon Research Assistant
BETA
Minimizing total weighted completion time on a batch-processing machine with re-entrance
Rui Zheng, Hongyu Li
Published in 2009 IEEE International Conference on Automation and Logistics (01.08.2009)
Published in 2009 IEEE International Conference on Automation and Logistics (01.08.2009)
Get full text
Conference Proceeding
Optimal sequential inspections of reliability systems subject to parallel-chain precedence constraints
Chiu, Steve Y, Jr, Louis A.Cox, Sun, Xiaorong
Published in Discrete Applied Mathematics (15.10.1999)
Published in Discrete Applied Mathematics (15.10.1999)
Get full text
Journal Article
Optimal Sequential Inspections of Complex Systems Subject to Block-Chain Precedence Constraints
Bao, Z.W., Cui, L.R., Wei Gao
Published in 2008 Fourth International Conference on Natural Computation (01.10.2008)
Published in 2008 Fourth International Conference on Natural Computation (01.10.2008)
Get full text
Conference Proceeding
Scheduling three chains on two parallel machines
Agnetis, Alessandro, Flamini, Marta, Nicosia, Gaia, Pacifici, Andrea
Published in European journal of operational research (01.05.2010)
Published in European journal of operational research (01.05.2010)
Get full text
Journal Article
Scheduling deteriorating jobs with chain constraints and a power function of job completion times
Duan, Hong-Ling, Wang, Wei, Wu, Yu-Bin
Published in Journal of industrial and production engineering (03.04.2014)
Published in Journal of industrial and production engineering (03.04.2014)
Get full text
Journal Article
Two-Machine Flow Shop Scheduling with Re-entrance
Caixia Jing, Xingsan Qian, Guochun Tang
Published in 2008 International Conference on Information Management, Innovation Management and Industrial Engineering (01.12.2008)
Published in 2008 International Conference on Information Management, Innovation Management and Industrial Engineering (01.12.2008)
Get full text
Conference Proceeding