Probabilistic allocation and scheduling of multiple resources for emergency operations; a Victorian bushfire case study
Bodaghi, Behrooz, Palaneeswaran, Ekambaram, Shahparvari, Shahrooz, Mohammadi, Mahsa
Published in Computers, environment and urban systems (01.05.2020)
Published in Computers, environment and urban systems (01.05.2020)
Get full text
Journal Article
Costs and Benefits of ISO9000-based Quality Management Systems to Construction Contractors
Ng, Thomas, Palaneeswaran, Ekambaram, Kumaraswamy, Mohan
Published in Construction economics and building (23.11.2012)
Published in Construction economics and building (23.11.2012)
Get full text
Journal Article
Bi-objective multi-resource scheduling problem for emergency relief operations
Bodaghi, Behrooz, Palaneeswaran, Ekambaram, Abbasi, Babak
Published in Production planning & control (26.10.2018)
Published in Production planning & control (26.10.2018)
Get full text
Journal Article
The influence of group-level factors on individual energy-saving behaviors in a shared space: The case of shared residences
Zhu, Jiaolan, Alam, Md Morshed, Ding, Zhikun, Ekambaram, Palaneeswaran, Li, Jie, Wang, Jiayuan
Published in Journal of cleaner production (15.08.2021)
Published in Journal of cleaner production (15.08.2021)
Get full text
Journal Article
Evaluating the effect of normative feedback on energy conservation in a shared space
Zhu, Jiaolan, Morshed Alam, Md, Liu, Rongsheng, Wang, Jiayuan, Ding, Zhikun, Ekambaram, Palaneeswaran
Published in Energy and buildings (01.04.2023)
Published in Energy and buildings (01.04.2023)
Get full text
Journal Article
Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
Love, Peter E. D., Teo, Pauline, Ackermann, Fran, Smith, Jim, Alexander, James, Palaneeswaran, Ekambaram, Morrison, John
Published in Production planning & control (04.04.2018)
Published in Production planning & control (04.04.2018)
Get full text
Journal Article
Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
Kannimuthu, Marimuthu, Raphael, Benny, Ekambaram, Palaneeswaran, Kuppuswamy, Ananthanarayanan
Published in Engineering, construction, and architectural management (06.04.2020)
Published in Engineering, construction, and architectural management (06.04.2020)
Get full text
Journal Article
Unveiling the digital horizon: Bridging the realms of digital twinning and construction project management performance
Shan, Jiancheng, Chai, Chang Saar, Lim, Bibiana Chiu Yiong, Palaneeswaran, Ekambaram
Published in Journal of Infrastructure, Policy and Development (03.09.2024)
Published in Journal of Infrastructure, Policy and Development (03.09.2024)
Get full text
Journal Article
A support vector machine model for contractor prequalification
Lam, Ka Chi, Palaneeswaran, Ekambaram, Yu, Chen-yun
Published in Automation in construction (01.05.2009)
Published in Automation in construction (01.05.2009)
Get full text
Journal Article
The use of enhanced positional weight method for constrained resources project scheduling
Tam, Paul Wing Ming, Palaneeswaran, Ekambaram
Published in Canadian journal of civil engineering (01.04.1999)
Published in Canadian journal of civil engineering (01.04.1999)
Get full text
Journal Article