Scheduling IT Staff at a Bank: A Mathematical Programming Approach
Louly, Mohamed Ali, Gharbi, Anis, Mrad, Mehdi, Labidi, Mohamed
Published in TheScientificWorld (01.01.2014)
Published in TheScientificWorld (01.01.2014)
Get full text
Journal Article
The one machine scheduling problem: Insertion of a job under the real-time constraint
Duron, C., Ould Louly, M.A., Proth, J.-M.
Published in European journal of operational research (16.12.2009)
Published in European journal of operational research (16.12.2009)
Get full text
Journal Article
Decomposition approach for a problem of lot-sizing and sequencing under uncertainties
Dolgui, A, Levin, G, Louly, M-A
Published in International journal of computer integrated manufacturing (01.07.2005)
Published in International journal of computer integrated manufacturing (01.07.2005)
Get full text
Journal Article
Generalized newsboy model to compute the optimal planned lead times in assembly systems
Ould-Louly, M.-A., Dolgui, A.
Published in International journal of production research (01.01.2002)
Published in International journal of production research (01.01.2002)
Get full text
Journal Article
Modeling of the microstructural properties of (x)ZnO(1 - x)Fe^sub 2^O^sub 3^ nanocrystallines by artificial neural network and response surface methodology
Louly, M A, Lemine, O M, Gharbi, A
Published in Measurement : journal of the International Measurement Confederation (01.01.2017)
Get full text
Published in Measurement : journal of the International Measurement Confederation (01.01.2017)
Journal Article
Modeling of the microstructural properties of (x)ZnO(1−x)Fe2O3 nanocrystallines by artificial neural network and response surface methodology
Louly, M.A., Lemine, O.M., Gharbi, A.
Published in Measurement : journal of the International Measurement Confederation (01.01.2017)
Published in Measurement : journal of the International Measurement Confederation (01.01.2017)
Get full text
Journal Article
A model for supply planning under lead time uncertainty
Dolgui, Alexandre, Ould-Louly, Mohamed-Aly
Published in International journal of production economics (21.07.2002)
Published in International journal of production economics (21.07.2002)
Get full text
Journal Article
Planned lead times for one-level assembly system with service level constraint
Louly, M.-A., Dolgui, A., Hnaien, F.
Published in 2008 IEEE International Conference on Emerging Technologies and Factory Automation (01.09.2008)
Published in 2008 IEEE International Conference on Emerging Technologies and Factory Automation (01.09.2008)
Get full text
Conference Proceeding
The MPS parameterization under lead time uncertainty
Ould-Louly, Mohamed-Aly, Dolgui, Alexandre
Published in International journal of production economics (18.08.2004)
Published in International journal of production economics (18.08.2004)
Get full text
Journal Article